| 1 | Provide all materials, labour, T&P etc as caution boards, night lamps and watch & ward including barricading of roads on both side of trench during implemnetation of work specified by E/C |
| 2 | Dewatering with the help of proper pumping set to divert the existing sewage flow during construction of RCC Channel including hiring charges, cost of fuel, operator etc complete. |
| 3 | Supply of local sand, gunny bags for bandha work including filling of sand in bags by manual labour, T&P, transportation charges etc complete including making of bandha with the help of manual labour stacking it across the drain including covering it with PVC sheet. |
| 4 | Making of Premanent Roka by brickwork to stop the flow of sewage from existing sewer line including. Supply of all material, labour T&P etc complete. |
| 5 | Dismantling of bituminous roads including sorting out, stacking and disposal of unserviceable materials up to a distance of 200 m from the centre of trenches. |
| 6 | Utility shifting like pipe line, sewer line, electric pole, cables, Boundary Wall including. Supply of all material, labour T&P etc complete. |
| 7 | Dismantaling of Old RCC slab including disposal of debris upto a distance of 200 mtr, supply of all labour, T&P etc required for proper completion of work. |
| 8 | Dismantaling of Old Brick work including disposal of debris upto a distance of 200 mtr, supply of all labour, T&P etc required for proper completion of work. |
| 9 | Dismantaling of Old DI pipeincluding disposal of debris upto a distance of 200 mtr, supply of all labour, T&P etc required for proper completion of work. |
| 10 | Excavation for following depth below G.L. for laying of sewer, manholes, gully pits, chambers etc in ordinary soil (earth, clay, loam) including cutting of jointing pits, trimming dressing, levelling, refilling of trenches, in 20 cm layers watering and ramming the same including removal of surplus earth other dismanteled matrial up to 50 mtr. distance.0.00 - 1.50 M BGL |
| 11 | 1.50 - 3.00 M BGL |
| 12 | 3.00 - 4.50 M BGL |
| 13 | Bottom support with ISMB girder size 250 mm, 12.50 mm thick, 125 mm including. Supply of all material, labour T&P etc complete. -10 Nos X 8 M X 37.30 Kg/M |
| 14 | Open timbering in trench 0.00-3.00 depth including. Supply of all material, labour T&P etc complete. |
| 15 | Mild Steel or iron work such as reinforcement in RCC Work brought to shape as required necessary including bending for proper completion of work including supply of steel and wastage, labour T&P etc complete. |
| 16 | RCC with cement, coarse sand and 20 mm stone ballast in the ratio of (1:1:2) is slab and wall including all material, labour, T&P etc complete.(i) Bottom Slab (20 X 3 X 0.30) |
| 17 | (ii) Tob Slab (20 X 2.60 X 0.30) |
| 18 | (iii) Side Wall (20 X 2.60 X 0.30) |
| 19 | Construction of 2 Nos Brick masonry manhole 2.0 M. depth including Supply of all material, labour T&P etc complete. |
| 20 | Dismantling of Roka |
| 21 | reinstatement of Bitumin road |
| 22 | Cleaning of debris/garbage accumulated into Muirmill drain during execution of work. |
| 23 | Repairing work of damage wall of Muirmill drain during execution of work. Please Enable Macros to View BoQ information |