|
| 1 | Removal of of ACSR Dog/RABBIT/WEASEL conductor from both side spans of damaged pole and removal of H.T/L.T line accessories from damaged pole. |
| 2 | Digging of pit of damaged pole in Pakka road (Hard soil) with the help of road cutter/digging machine, Tractor etc. for dismantling the pole. |
| 3 | Digging of pit of damaged pole in Kachha side road (soft soil) for dismantling the damaged pole. |
| 4 | Dismantling of damaged single support PCC Pole/S.T Pole from pit and S.T Pole carriage from work site to J.E\"s store and damaged PCC Pole will be carriage from wotk site to dumping yard including loading & unloading at both ends. |
| 5 | Carriage of new 8.5mt. Long PCC pole, 11 mtr. Long STP from Cetral Store, Bijnor/J.E Store to work site including safe loading and unloading at both ends. |
| 6 | Erection & fabrication of following supports including fitting of all reqired accessories of HT/LT line as per RESPO schedule. |
| 7 | Single supports on ST Pole of 11 Mtr. Long |
| 8 | Single support on PCC Pole |
| 9 | Grouting, concreting and plinthing of single support on ST pole of 11 mt. long with cement, stone ballast & coarse sand in ration of 1:3:6 complete in all respect. |
| 10 | Laying and Sagging of ACSR Dog/RABBIT/WEASEL conductor in both side spans of new erected pole in H.T/L.T line. |
| 11 | For attending 33 KV/ 11 KV Break down providing & replacement of damged Disc/Insulators and jointing of conductor and replacement of Jumpers etc. |
| 12 | Fixing of Disc Insulator as per Site requirement. |
| 13 | Fixing of Pin Insulator as per site requirement |
| 14 | Cutting/chopping tree branches in the way of 33 KV/11 KV /L.T lines. PER KM. |
| 15 | The following material is required to supplied by the contractor and Fixing of its material on Poles as required. |
| 16 | Stay Clamps |
| 17 | stay Insulator |
| 18 | F-Brackets |
| 19 | X-Arm Holding Clamps |
| 20 | F Clamp |
| 21 | Earth Clamp |
| 22 | Bolt and Nuts off Size |
| 23 | ACSR Weasel/Rabbit/Racoon/Dog conductor of HT/LT lines in different sectors & cartage of material from J.E\"s Store/Any Store of PVVNL Discom with loading & unloading at both ends. |
| 24 | H.T line |
| 25 | L.T line |
| 26 | Re-laying lifting, stringing & proper sagging of new conductor in place of old and damaged removed conductor on H.T/L.T line with binding, jumpering etc.including cartage, loading & unloading from Central store, Bijnor/J.E Store to site of work. |
| 27 | ACSR Dog Conductor(H.T line) |
| 28 | ACSR Weasel conductor (L.T line) |
| 29 | Re-sagging of conductor of loose H.T/L.T line which includes opening of jumpers, binding & re jumpering etc. complete in all respect. |
| 30 | 11 KV(3wire) line at various places |
| 31 | LT line (4/5 wire) at various places |
| 32 | Providing and fixing of Bamboo Phanti with the binding wire in L.T lines at different places. |
| 33 | Carriage of AB cable 95/120 Sqmm from Store Cente, Bijnor to work site including safe loading and unloading at both ends. |
| 34 | Laying, lifting & Stringing of AB cable size 95/120 sqmm in place of dismentlalled damaged ABC and fixing of all types clamps & connection complete in all respect. |
| 35 | Carriage of Distribution box(Single Phase/Three Phase) from Store Center Bijnor to work site including safe loading and unloading at both ends. |
| 36 | Installation of single/Three Phase Distribution box on pole with providing suitable L.T clamps and making LT lead connection complete in all respect. |
| 37 | Overhauling & maintenance of UG XLPE cable /cable box for 70/120/185/300 MM 2 HT XLPE cable(including 33KV/11KV) |
| 38 | Utilisation of fault loactor for fault detection |
| 39 | Excavating the pinpointed fault area |
| 40 | Performing a cable joint on the damaged section through cable jointing kit |
| 41 | Fixing the damaged cable box for 70/120/185/300 MM 2 HT XLPE cable (including 33KV/11KV) |
| 42 | Carriage of scrap material from J.E\"s store to Central Store Center, Bijnor including safe loading and unloading at both ends. Please Enable Macros to View BoQ information |