|
| 1 | SCHEDULE \"A\"[ E/M WORKS] PHASE-I |
| 2 | Disconnecting electric supply from electric sources, taking down 06 passengers Lift serving G+ 03 floors with connected cables & controls complete without damaging any other equipments and making good and matching with existing surface complete and including transportation of old unserviceable lift to MES store yard with all accessories. Before disconnecting/ taking down, the inventory of the lift and connected cables, Control, Motors, gears, ropes with starters are to be prepared and submitted to Engineer-in-charge & the same list to be retallied after unloading the items in store. Note : (i) The quoted rate is inclusive of Machine room bed block removal , buffer bed block removal, landing push box removal in all landings , debris removal , complete removal all metal supports / projections and keeping the lift hoistway free from obstruction and ready for new lift installation. |
| 3 | Design supply, install, testing & commissioning 08 passengers lift, speed 1 m/s, lift with single speed motor 415 volts, 3 phase, AC 50 Hz supply conforming to IS- 14665, suitable to serve G + 03 upper floors with AC Variable Voltage & Variable Frequency drive (VVVF drive) complete with all standard accessories, simplex automatic & manual dual controlled operation with/without attendant, centre opening doors with door drive (electric motor driven mechanism), sliding stainless steel doors, Automatic Rescue Device (ARD) system, 3D infra red sensor in full height of door & built in announcing system without hand set (04 Nos, one each in car, Machine room & near Ground floor landing door) complete all as specified and directed.Note :-(i) The rate quoted is inclusive of minor civil works required during erection like landing door fixing area cutting, brickwork and plastering, RCC bed block for machine fixing , Machine room slab holes cut out as per OEM\"s drawing, RCC slab in lift pit, increasing pit depth to 400 mm and any other minor civil works required for lift erection and smooth functioning as required by OEM.(ii) The rate quoted is deemed to included for comprehensive maintenance for a 2 years during DLP after completion of work.(iii) Notes give for Ser item No 46 to 51 hereafter (in ser No 52 & 53) is applicable for this item also. |
| 4 | M & L for earthing complete with GI earth plate electrode60cm×60cm× 6mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less than 1.5 metres below normal ground level, connected to 32x6 mm galvanised iron strip as earthing lead by means of bolts, nuts, check nuts and washers of copper all as shown in electrical plate No.3in SSR part 1 (2010 edition)connected to earthing test point,including 20 mm GI pipe (Medium grade) for watering and 40 mm GI pipe (Medium grade) for protection of earth strip andetc..including testing on completion ,PCC chambers in PCC1:3:6 type C1, RCC M25 type cover slab 50mm thick with 8mm dia TMT HCR/CRS steel bars at 140mm C/C both way and lifting handle GI funnel & wiremesh ,funnel,lugs and charcoal,salt etc all as applicablecomplete all as specified and as directed by the Engineer-in-Charge. Note:-(i) The rates quoted is inclusive of32x6mm galvanised iron strip earthconductor upto a length of 7.5m from the earth pit. |
| 5 | Supply & fixing Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 32x6mm galvanised iron strip all as specified and directed. |
| 6 | Supply and laying LT UG XLPE insulated of size 35 Sqmm 3.5 core 1100 volt grade heavy duty cable multi stranded aluminium conductor served with an inner sheathing of PVC tape armoured with galvanised steel strip wire or tape and connecting up to the electrical system with suitable size of aluminium lugs complete all as specified and directed. |
| 7 | Supply and fixing High density poythelyne (HDPE) pipesPN 10 of pressure rating 6kgf/ sqm of size 75 mm for cable protection to be fixed in lift hoistway complete all as specified and directed |
| 8 | Supply and fix sheet metal enclosure powder coated double doorfor Distribution Board, VTPN 4 way DB with Degree of ProtectionIP 43 & 54 , Detachable Gland Plate, Box Insertion Marks •,Circuit Identification Label •,Neutral Link ,Earth Link , Tin Plated Copper Bus Bar With provision for MCCB as incomer and SP/TP MCB\"s as outgoing complete all as specified and as directed. |
| 9 | Supply and fix MCCB 4 Pole, 415 V, adjustable type, 100 Amps with breaking capacity 16 KA completeall as specified and as directed. |
| 10 | Supply and fixing amp rating 240V, 10KA \"C\" curve miniature circuit breaker (MCB)SP 6- 32 A in theDB complete with connection testing and commissioning all as specified and directed. |
| 11 | Supply and fixing MCB TP 25 to 63 Amp 415V 10KA \"B\" curve miniature circuit breakerin the DB complete with connection testing and commissioning completeall as specified and as directed. |
| 12 | Taking down copper/aluminium point wiring (light, fan, socket or power) complete, including fixture and fittings such as switches, ceiling roses, pendants, regulators, sockets, light fitting etc., removing materials to store for keeping in safe custody for taking creditand making good disturbed surfaces of walls, floors etc. all as specified and directed. |
| 13 | Point wiring with 1.5 sqmm (Nominal area) unsheathed multi-stranded copper conductor PVC insulated cable 1100 volts grade single core drawn into and including non-metallic rigid PVC conduit of 20 mm dia/ PVC Casing cappingalong with 1.5 sqmm unsheathed multi stranded copper conductor cable PVC insulated 1100 volts grade as earth continuity conductor connected to common earth dolly fixed to wall/ ceiling roof with and including 1.6 mm thick MS sheet fabricated terminal boxes flush mounted for mounting the switches, sockets, fan regulator etc as required with 3mm thick laminated hylum sheet top cover all as specified and directed for :- |
| 14 | One light point controlled by one switch |
| 15 | One fan point controlled by one regulator / switch. |
| 16 | One 3 pin socket outlet 5 amps socket onindependent board |
| 17 | One 3 pin socket outlet 5 amps socket on same board |
| 18 | Description all as per item No.13 here-in-before but with 4 sqmm cable for one 3 pin socket outlet 15 Amps on independent board with 4 sqmm cable as earthing conductor. |
| 19 | Supply & fix in replacementModular White cover plate with frame, 3 Module including taking down old unserviceable modular cover plate andremoving the material for taking credit complete all as specified anddirected. |
| 20 | Supply & fix in replacement Modular White cover plate with frame, 6 Module including taking down old unserviceable modular cover plateandremoving the material for taking creditcomplete all as specified anddirected. |
| 21 | Supply and fix in replacement Modular metal flush box 3module including taking down old unserviceable metal box removing the material for taking credit and making good the disturbed surface of wall complete all as specified anddirected. |
| 22 | Supply & fixin replacement Modular Metal flush Box 6 Module including taking down old unserviceable metal box removing the material for taking credit and making good the disturbed surface of wall complete all as specified anddirected. |
| 23 | Taking down carefully old unserviceable submain wiring with aluminum /copper conductor cable 4/6/10/16 Sqmm in PVC conduit complete removing the materials and taken as credit and making good the disturbed surface of wall / floor etc all as specified and directed. |
| 24 | Material and labour for Sub main wiring in replacement with two run single core 2.5 sqmm multi stranded copper conductor PVC insulated unsheathed cable 1100 volts grade and one run of 2.5 sq mm multi stranded copper conductor cable as earth continuity conductor drawn into and including non-metallic rigid PVC conduit 25 mm dia/PVC casing capping 25 mm including conduit accessories all as specified and directed. Note: Three runs of 2.5 Sqmm cable and one run of 25mm conduit / casing capping will be measured as one unit length. |
| 25 | Material and labour for Sub main wiring in replacement with two run single core 4 sqmm multi stranded copper conductor PVC insulated unsheathed cable 1100 volts grade and one run of 4 sq mm multi stranded copper conductor cable as earth continuity conductor drawn into and including non-metallic rigid PVC conduit 25 mm dia/PVC casing capping 25 mm including conduit accessories all as specified and directed. Note: Three runs of 4 Sqmm cable and one run of 25mmconduit / casing capping will be measured as one unit length. |
| 26 | Material and labour for Sub main wiring with four runs single core 4sqmm multi stranded copper conductor PVC insulated unsheathed cable 1100 volts grade and two runs of 4 sqmm multi stranded copper conductor cable as earth continuity conductor drawn into and including non-metalic rigid PVC conduit, 32mm dia/PVC casing caping 32 mmand conduit accessories concealed/surface of wall/roof/ceiling etc complete all as specified and directed.Note: Six runs of 4sqmm wire and one run of 32mm dia conduit/casing capping shall be measured as one unit length. |
| 27 | Material and labour for Sub main wiring with four runs single core 6 sqmm multi stranded copper conductor PVC insulated unsheathed cable 1100 volts grade and two runs of6 sqmm multi stranded copper conductor cable as earth continuity conductor drawn into and including non-metallic rigid PVC conduit 32 mm dia/PVC casing capping 32 mm including conduit accessories all as specified and directed.Note: Six runs of 6 Sqmm cable and one run of 32 mm conduit / casing capping will be measured as one unit length. |
| 28 | Supply and fix inreplacement Modular switch 1 way 5A, 1 Module including taking down old unserviceable switch andremoving the material for taking credit complete all as specified and as directed. |
| 29 | Supply and fix in replacement Modular switch 1 way 16A, 1 Module including taking down old unserviceable switch andremoving the material for taking creditcomplete all as specified and as directed. |
| 30 | Supply and fix in replacement Modular Socket 5A-2/3 pin combined 2 Module. including taking down old unserviceable socket andremoving the material for taking credit complete all as specified and as directed. |
| 31 | Supply and fix in replacement Modular Socket5A / 15A - 2 / 3 pin combined 2 Module. including taking down old unserviceable socketandremoving the material for taking creditcomplete all as specified anddirected. |
| 32 | Supply and fix in replacement Modular fan Regulator Step type , 2 Module including taking down old unserviceable fan regulatorandremoving the material for taking credit complete all as specified and as directed. |
| 33 | Supply and fix in replacementceiling rose3 ways PVC / Polycarbonate, isolated body complete all as specified and as directed. |
| 34 | Supply and fix in replacementof ceiling fans complete with blades, down rods, electronicregulator and accessories, 230 V, 1200 mm sweep. Min air delivery 210 CFM with service value 6.00 BEE. Five star rated with brushless direct current motor (BLDC) completeall as specified and as directed. |
| 35 | Supply and fixin replacement ofexhaust fan heavy duty with louvers, steel body AC single Phase. 230V of size 450mm sweep with, blades, and frame and louvers including making holes in wall for installing exhaust fan completeall as specified and as directed. |
| 36 | Supply and fix in replacementLED light fitting 1x 20 W, 220V,AC decorative box type with driver, holder including LED tube light connecting up with three core flexible copper conductor cable of suitable size from ceiling rose complete including taking down old U/S fittingsfor taking into credit complete all as specified and directed |
| 37 | S & F in replacement LED light fitting 1x9W/1X10W bulkhead luminaires including LED light driver holder connecting up with three core flexible copper conductor cable of suitable size including taking down old U/S fittingsfor taking into credit complete all as specified and directed |
| 38 | SCHEDULE \"A\"[ B/R WORKS] PHASE-I |
| 39 | Dismantling of stone slabs and tiles of any description or thickness in floors, aprons etc laid and bedded and pointed in any mortarcomplete all as specified and directed |
| 40 | M & L for 18-20mm thick machine cut pre-polished kota stone slab in single piece with round nosing with three numbers of serration as in treads of steps for staircase laid over cement screed bed and jointed with grey cement slurry with pigment to match the shade of the slab including rubbing and mirror polishing over and including 15mm thick screed bed in CM 1:6 complete all as specified and directed |
| 41 | M & L for machine cut pre polished kota stone 15-18 mm thick (single peice in raiser of steps), skirting, dado and pillar laid and jointed with grey cement slurry including cutting and mirror polishing over and including 10mm thick backing coat in CM 1:4 complete all as specified and directed |
| 42 | Taking down cement Plaster , any description, on brick walls or stone walls,etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed. |
| 43 | M & L for 15mm thick rendering in two coats of (10 mm thick on first coat and 5mm thick in second coat) on fair faces of birck work or concrete surfaces in CM 1:4 with WPC @3% by wt of cement on second coat complete all as specified and directed.Note:- WPC shall be measured and paid separately |
| 44 | Supply only integral water proofing compound complete all as specified and directed. |
| 45 | Material and Labourfor rendering 15 mm thick on fair faces of brick work or concrete surfaes in CM (1:6) and finised even and smooth (withoutusing extra cement) complete all as specified and directed |
| 46 | Material and Labourfor 10 mm thick rendering in CM (1:3)on ceiling on soffits and finished even and smooth (withoutusing extra cement) complete all as specified and directed |
| 47 | Material and Labourfor preparation of newly plastered / concrete surfaces and applying two coats of oil bound distemper over a coat of primer over 3mm thick birla wall care putty complete all as specified and directed. |
| 48 | Material and Labourfor Preparation of new plastered surfaces and applying three coats of white wash on ceiling complete all as specified and directed. |
| 49 | Material and labour for 20 mm thick machine cut,Granite stone slab (of any type)(table rubbed and polished) in steps,jambs, pillars, windows, cills, cooking platforms and like in cement mortar 1:4 bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of granite stone including 15mm thick screed bed in CM 1:6 complete all as specified and directed |
| 50 | PHASE-II (FIRST YEAR COMPREHENSIVE MAINTENANCE OF8 PASSENGERS LIFT AS PROVIDED UNDER THIS CONTRACT AS PER SERIAL ITEM No. 03 AFTER EXPIRY OF DEFECT LIABILTY PERIOD.) |
| 51 | Comprehensive maintenance of Electrically Operated 8 passenger lifts (02 Nos)to serve G+3 upper floors all as mentioned vide SI No. 03 of BOQ during 1st year after expiry of defects liability period complete all as specified and directed |
| 52 | PHASE-III (SECOND YEAR COMPREHENSIVE MAINTENANCE OF8 PASSENGERS LIFT AS PROVIDED UNDER THIS CONTRACT AS PER SERIAL ITEM No. 03 AFTER EXPIRY OF DEFECT LIABILTY PERIOD.) |
| 53 | Comprehensive maintenance of Electrically Operated 08 passenger lifts (02 Nos) to serve G+3 upper floors all as mentioned vide SI No. 03 of BOQ during 2nd year after expiry of defects liability periodand after completion of first year Comprehensive Maintenance.complete all as specified and directed |
| 54 | PHASE-IV (THIRD YEAR COMPREHENSIVE MAINTENANCE OF 8 PASSENGERS LIFT AS PROVIDED UNDER THIS CONTRACT AS PER SERIAL ITEM No. 03 AFTER EXPIRY OF DEFECT LIABILTY PERIOD.) |
| 55 | Comprehensive maintenance of Electrically Operated 8passenger lifts (02 Nos) to serve G+3 upper floors all as mentioned vide SI No. 03 of BOQ during 3rd year after expiry of defects liability periodand after completion of second year Comprehensive Maintenance all as specified and directed |
| 56 | Note for SL No: 46 to 51:-(i) Contractor shall provide comprehensive maintenance services including routine (Weekly, monthly, Bimonthly , Every three / six months, Annually),preventive, and breakdown corrective maintenance for the lifts as per OEM guidelines and statutory compliance inclusive all materials, spares,labour, testing instrument, Transportation of Materials & Parts, etc. as required and rate quoted by the tenderer includes the above.Contractor shall ensure trouble free operation of lift, which are required to be on continuous operation round the clock.Services shall cover all lift components (including electrical, mechanical, and control systems) supplied and installed by the original equipment manufacturer (OEM) or their authorized representatives.Comprehensive maintenance check list is attached in Appx -A.(ii) All parts and components fitted by contractor will be original parts or components from OEM. If original parts or components are not available, the parts or components fitted will be of equal quality and functionality of reputed brands/makes with ISI mark only, shall be used after theapproval of Engr - in- Charge. Contractor will keep sufficient Nos. of spares required for replacement during day-to-day maintenance and Breakdown/ Corrective Maintenance to avoid delay. (iii) Contractor must provide sufficient manpower including qualified technicians,supervisor(s) and helpers for carrying out theroutine (Weekly, Monthly, Bimonthly , Every three / six months, Annually maintainance ),preventive, and breakdown corrective maintenance for the lifts as per OEM guidelines , all of them shall carry identification badges during duty. (iv) Only OEM-trained or certified technicians with proper safety gear shall perform maintenance services.All maintenance, repair, and replacement activities must adhere to highest standards of workmanship and cleanliness. |
| 57 | NOTE for SL No: 46 to 51 Conte...:(v) Contractor must maintain a site logbook, which is to be produced to Engr in Charge after each service, capturing all visits, maintenance performed, and spares replaced.Contractor must provide quarterly and annual reports on lift condition, repair history, and component status to the Engr - in Charge.(vi) Load testing shall be arranged by the contractor to the Lift whenever major repairs were carried out , as and when directed by Engr-in-charge. (vii)The quoted rate shall be deemed to be included the above aspects and for consumebles such as timely topping up/replacement of gear oils,acrylic covers,fuses,copper cables,hardware like bolts,nuts,emery papers,grease,waste cotton,stationary and other miscellaneous items etc(viii) The tenderer shall submit Mou from the original manufactrer of the lift for comprehensive maintenance to undertake comprehensive maint after defects liability period directly or through ther nearest authorised/ accredited agencies services persels. MoU shall be submitted at least 6 months prior to issue of cmpletion certificate of main contract as per work order no 1.(ix) In case of the lift not working for more than 24 hours but less than 10 days , recovery will be made at the rate of Rs 2000 / day and after 10 days , recovery will be made at the rate of Rs 3000 / day (x) Obtaining and renewal of LIFT licensee shall be responsibility of the contractor andlicense fee will be borne by the contractor including arranging and assisting with annual safety tests, load testing, and obtaining necessary certifications/licenses |
| 58 | Schedule of credit amount brought back from Ser Page No 39- Rs. 7270.00 will be deducted from the above quoted amount to derive the contract sum. SIGNATURE OF CONTRACTOR |