| 1 | Excavation in founadtion in ordinary soil (loamclay or sand) including lift up to 1.5 m and lead up to 30m. And including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m, from the foundation trenches including all T & P phowarah and basket etc. complete. S.I. No-251 |
| 2 | concrete with 4 cm gague brick ballast sand of 1.25 FM and cement in proportion of 12:6:1 in foundation and under floors including supply of all material labour T&P etc.required for proper completion of work as per sl. No.273 |
| 3 | Providing and laying Reinforced cement concrete pipe NP2 (burried conduits) on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls & parapets. As per DSR 2023 Code 19.6.3 300 mm dia |
| 4 | Earthwork in cutting or in Embankment in ordinary soil excavation to be the form of regular pits not exceeding 1/2 meter (20\") in depth and earth work in enbankment to be in 20cm (8\") layers, including ramming and dressing the surface to required including cartage from 6 km distance |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheeled roller complete as per T.S. clause 401. |
| 6 | Providing and laying of Rubber moulded Interlocking concrete block pavement having thickness 80 mm including leveling and dressing of surface To required level and slope spreading and moisting 30 m.m thick local sand on bend filling joints with local sand etc. for proper complition of work as per drawing and T.S. clause 1504 |
| 7 | Hence For Red Colour - |
| 8 | Hence For Grey Colour - |
| 9 | M-150 brick work in 1:4 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No-305 |
| 10 | 12 mm thick cement plasterin 1:4 cement morter I/C all material labour T&P proper complition to the work . S.I. No-584 |
| 11 | Construction of K.C. drain with precast of C.C. Blocks size (400x325 mm) laid in flat position (37.5mm in length) & kerb stone (300mm in length)including cost of Base Concrete in 1:6:12 cement sand & O.B.B Including cost of all material labour T&P etc,proper complition of work |
| 12 | Painting or varnishing new iron work in small area with one coat (upto one sq.m) of ready mixed priming paint and one coat of approved superior quality ready mix paint of clear synthetic varnish i/c s/o materials labour and T& P etc. required for proper completion of work. Paint to be used should confirm to the ISINo.103 1950.As per S.I.No.(641+642) |
| 13 | S/F OF 110 mm dia pvc pipe ISI Mark for drainage work |
| 14 | SFRC Medium Duity Manhole cover Size (600x600x750 mm.) i/c all |
| 15 | SFRC Medium Duty Gully Pit cover Size (300x300x500 mm.) i/c all |
| 16 | Supply and Fixing Of imformatory sign board Please Enable Macros to View BoQ information |