| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement:1½coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 6 | Trimming and trenching of tree branch mannually ( Height more than 10 feet) and disposal of cutting branches upto a lead of 50 mtr all complete job as per instruction of Engineer in charge. |
| 7 | Cleaning of main drain of all size including its connecting drain of any size taking out the sludge/malba from the drain and garbage from the sides of the drain getting them deposited at the ear marked places all complete as per the instructions of the Engr-in-Charge |
| 8 | Cleaning of malma of coal slurry manually lead up to 50 m lift 1.5 m (bunker) including T&P all complete job as per dirction of engineer in charge. |
| 9 | Supplying and stacking of moorum/laterite all lead and lift and transporting at site loading, unloading and royalty born by agency…..as per direction of Engineer Incharge. |
| 10 | Spreading of moorum/laterite manually up to lead of 150 meter all complete as per instruction of Engineer Incharge. |
| 11 | Supply of mineral aggregate like broken stone/crushed stone (crushed in mechanical crusher) including all lead and stacking etc. complete. 20mm standard size broken stone |
| 12 | Laying/Spreading of stone aggregate in uniform thickness complete job as per instruction of Engineering Incharge. |
| 13 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |