| 1 | LABOUR |
| 2 | (1110) Erection of suspension clamp for LTABC of any size |
| 3 | (726) Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4poles excluding loading & unloading. |
| 4 | (566) Dismantling (without damage) one kmLT 3ph 4 wire OH line, cross arms,insulators and stacking the conductors inrolls. |
| 5 | (567) Dismantling (without damage) one kmLT additional conductor line, cross arms,insulators and stacking the conductors inrolls. |
| 6 | (565) Dismantling (without damage) one kmLT Sph 2 wire OH line, cross arms,insulators and stacking the conductors inrolls. |
| 7 | (204) Erecting one LT PSC Pole in positionincl. digging & back filling pit. |
| 8 | (706) Loading LT PSC pole from the stackingplace and unloading the same at worksite (transport by vehicle). |
| 9 | (348) Straightening one slanted 11kV Cut poleafter lowering down the existing line andstringing the line after work. |
| 10 | (421) Straightening one Slanted LT pole afterunbinding the line and rebinding the lineafter work. |
| 11 | (422) Straightening one Slanted LT Cut poleafter unbinding the line and rebindingthe line after work. |
| 12 | (124) Insertion of one HT PSC pole in existingline incl. digging & backfilling pit,fitting cross arm, insulators, binding etc. |
| 13 | (702) Loading HT PSC pole from the stackingplace and unloading the same at worksite (transport by vehicle). |
| 14 | (205) Providing Stay for LT poles incl. digging & back filling pit. |
| 15 | (406) Renewal of existing damaged/old LTstay with new stay in place and refittingof all items and conveyance of allmaterials. |
| 16 | (407) Renewal of existing damaged/broken oldLT stay with existing stay rod. |
| 17 | (1141) Installing One No. 4 way SatelliteConnector of size Main :16 to 95, Tap:4to 35 Sq.mm to the LT AB cable ofStandard size |
| 18 | (2014) Transporting LT ABC by hired vehicleto a distance up to 5 km and carring upto 2 drum including loading and unloading using crane |
| 19 | (1105) Stringing of 1.1 kV Aerial bunchedcable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messengerthrough existing poles |
| 20 | (1114) Providing Cable Tie |
| 21 | (1109) Erection of Anchor clamp / dead endclamp for LT ABC of any size |
| 22 | (1120) Installation of Pre-insulated straightthrough joints for 16sqmm cable |
| 23 | (1123) Installation of Pre-insulated straightthrough joints for 70sqmm cable |
| 24 | (1119) Installation of Insulation piercingconnector for main to service line main:16-95 sqmm, Tap 16-95 sqmm |
| 25 | Total of BoQ1 Please Enable Macros to View BoQ information |