|
| 1 | Clearing light jungle with uprooting directed by the Engineer in charge and disposed away from site including cost of all materials, labour ,lead lift , etc complete as per technical specification. |
| 2 | Clearing heavy jungle with uprooting directed by the Engineer in charge and disposed away from site including cost of all materials, labour ,lead lift , etc complete as per technical specification. |
| 3 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shale, murram gravel, stoney earth & earth mixed with small size boulders and hard gravelly soil and depositing the earth in the places shown by the Engineer with initial lead of 10 M and initial lift of 2 m etc. complete. |
| 4 | Earth work excavation in MR & DMR not requiring blasting including transporting and dumping with head load lead upto 200m with all leads, lifts, etc., complete. |
| 5 | PCC M10 grade concrete using 40mm Metal (HBS) including cost of all materials lead, lift, labour for curing etc. Complete |
| 6 | Providing and placing in position RCC M25 using 20mm down graded HBG metal with minimum cement content of 365Kgs/m3 including cost of all materials, vibrating, curing, finishing the surface with all leads and lifts, labour, etc., complete as per the direction of Engineer and complying with standard specification |
| 7 | Supplying fabricating and fixing in position of M.S /RTS rod for reinforcement including cost of steel binding wire, labour, lead, lift etc complete. |
| 8 | Rough Stone dry packing in the sides of earthen bund including packing , cost of stone, all materials, lead, lift, labour, etc.., complete. |
| 9 | Water Leakage Arresting Treatment & Porous Area Stabilization including supply and application charges for PU Injection work using Mc-Injekt 2700L or equivalent including cost of all materials and machinery, packer, perforated pipes, quickset component, labour charges, transport charges, all leads, lifts, etc., complete |
| 10 | Filling the large pit with excavated earth including labour charges, hire charges for machineries, all materials, lead, lift and compaction by power roller watering, sectioning, the side slopes labours, etc., complete. |
| 11 | Flush pointing with CM 1:3 on the pitching stone joints including cost of all materials, labour, lead, lift, curing, etc., complete. |
| 12 | GST for bidders within TamilNaduNote : Bidders within Tamil Nadu shall enter values separately for SGST and CGST and shall enter the value as \"Zero\" for IGST. |
| 13 | GST for bidders outside TamilNadu Note: Bidders outside Tamil Nadu shall enter value only for IGST and shall enter the value as \"Zero\" for SGST and CGST |
| 14 | IGST Please Enable Macros to View BoQ information |