| 1 | Supply Cartage,Erection and Commissioning of the following work on semi Turn Key Basis |
| 2 | Supply of Required Material As per approved GTP of DVVNL/UPPCL |
| 3 | GI PIPE 6\"\" DIA FOR CABLE RISE ON DP STRUCTURE |
| 4 | GI PIPE HOLDING CLAMP |
| 5 | CABLE HOLDING CLAMP |
| 6 | ALLUMINIUM PAINT |
| 7 | RED OXIDE PAINT |
| 8 | BOLT NUT &WASHER OFF ALL SIZES |
| 9 | DANGER PLATE WITH CLAMP & BOLTS |
| 10 | NUMBER PLATE |
| 11 | HDPE PIPE 6 DIA FOR CABLE LAYNG BY HDD 140MM/671 |
| 12 | BARBED WIRE GI |
| 13 | HEAT SHRINKABLE BUS BAR INSULATING TAPE OF SIZE 50 MM |
| 14 | MS ANGLE IRON 65*65*6MM, |
| 15 | HOLDING CLAMP |
| 16 | ALUMINIUM BINDING WIRE |
| 17 | Earthing of earthing (GCM compound must be mixed with the water to make thick slurry and pourd arround the G.I PIPE witch acting as electrode) by digging /drilling of pit approx. 10 feet depth and inserting G.I pipe of 32 mm dia b grade ,complete to the required of i.s. specification two nos.earthing of each site one for the main cable and another of spair cable seprately double pole and equipment to be done the inserted pipe is to be connected to the cable and gi pipe through G.l. strip of size 25*5 mm with help of nut and bolt or by welding as per direction of the engineer of contract its Include the cost of all material, labour ,t&p provided by the contractor for proper complete of work. |
| 18 | Cartage, Erection and Commissioning of 33/11 KV Line on Single/Double STP/PCC Pole work includes Earthing,Grouting, Laying, Sagging, Strengthing, Painting,Binding of conductor and all work required to erect the line as per Respo Manual, Estimate and rates. Work includes carriage of all required line material from ESC Hasari to work site and Dismantling and Carriage of old line scrap material from site to store(Grouting material will be provided by the contractor)as per Respo manual and rates. |
| 19 | GI PIPE 6\"\" DIA FOR CABLE RISE ON DP STRUCTURE |
| 20 | GI PIPE HOLDING CLAMP |
| 21 | CABLE HOLDING CLAMP |
| 22 | ALLUMINIUM PAINT |
| 23 | RED OXIDE PAINT |
| 24 | BOLT NUT &WASHER OFF ALL SIZES |
| 25 | DANGER PLATE WITH CLAMP & BOLTS |
| 26 | NUMBER PLATE |
| 27 | HDPE PIPE 6 DIA FOR CABLE LAYNG BY HDD 140MM/671 |
| 28 | BARBED WIRE GI |
| 29 | HEAT SHRINKABLE BUS BAR INSULATING TAPE OF SIZE 50 MM |
| 30 | MS ANGLE IRON 65*65*6MM, |
| 31 | HOLDING CLAMP |
| 32 | Earthing of earthing (GCM compound must be mixed with the water to make thick slurry and pourd arround the G.I PIPE witch acting as electrode) by digging /drilling of pit approx. 10 feet depth and inserting G.I pipe of 32 mm dia b grade ,complete to the required of i.s. specification two nos.earthing of each site one for the main cable and another of spair cable seprately double pole and equipment to be done the inserted pipe is to be connected to the cable and gi pipe through G.l. strip of size 25*5 mm with help of nut and bolt or by welding as per direction of the engineer of contract its Include the cost of all material, labour, t&p provided by the contractor for proper complete of work. |
| 33 | 33 KV XLPE CABLE 3*300 SQ MM |
| 34 | CABLE JOINTING KIT OUT DOOR |
| 35 | ST POLE 11 MTR LONG |
| 36 | 33 KV DISC INSULATOR |
| 37 | 33 KV DISC FITTING(T&C TYPE) |
| 38 | ALLUMINIUM BINDING WIRE |
| 39 | MS TOP CHANNEL 125*65*3200MM WITH CLAMP |
| 40 | STAY SET AT ANGLE/ROAD CROSSING(STAY ROD 16*1800MM,STAY WIRE 5KG,STAY CLAMP,N&B) COMPLETE |
| 41 | EARTHING COMPLETE(EARTHING ROD 20*2500MM & 6 SWG EARTHING WIRE WITH N&B) |
| 42 | DISMANTLING OF 11 METER STP POLE WITH 180 METER DOG CONDUCTOR DISMANTLE AND RECEIVE BACK IN STORE |
| 43 | RECEIVE BACK MATERIAL SITE TO STORE HANSARI CHARGE |
| 44 | CABLE LAYING CHARGES(LS) WITH BRICK AND SAND |
| 45 | CONCREATING OF POLE |
| 46 | CONCREATING OF STAY Please Enable Macros to View BoQ information |