Tender For Dismantaling And Removing Reinforced Cement Concrete Columns, Beams, Slab, Staircase, Landing, Lintels Including Stacking The Materials For Reuse And Removing The Debries Within 50 M. Lead. , Earth Work In Hard Soil Or Gravelly Soil Within
Tender Overview
Project Description
Tender for Dismantaling And Removing Reinforced Cement Concrete Columns, Beams, Slab, Staircase, Landing, Lintels Including Stacking The Materials For Reuse And Removing The Debries Within 50 M. Lead. , Earth Work In Hard Soil Or Gravelly Soil Within 50M. Initial Lead And 1.5M. Initial Lift Including Rough Dressing And Breaking Clods To Maximum 5Cm.To 7Cm. And Laying In Layers Not Exceeding 0.3 M. In Depth Asper Direction Of The Engineer-In-Charge. , Providing, Supplying, Filling In Foundation And Plinth With Sand Including Watering And Ramming With Cost, Conveyance, Royalty, Taxes Of All Materials With All Labour, T&P Etc., Complete. , Cement Concrete Of Proportion (1:3:6) In F&F Using 4 Cm Size Bhg C.B Metal Of Approved Quality Including Cost, Conveyance, Taxes & Royalty Of All Materials And Labour With T&P Etc. Complete In All Respect . , Fly Ash Brick Masonary With Flyash Bricks Of 23Cm.X 12Cm.X 8Cm. Size Having Crushing Strength Not Less Than 75 Kg/Cm2 In Cement Mortar (1:6) In Superstructure Including Splays, Cuttings, Circular Moldings, Watering & Curing For 7 Days, Cost, Conveyance, Taxes & Royalties Of All Materials, Labour With T&P Etc. Complete In All Respect. , Reinforced Cement Concrete Work Of Proportion M-25 In Concrete Using 20 Mm Size Cbhg Chips Of Approved Quality Including Cost, Conveyance, Taxes, Royalties Of All Materials, Watering & Curing For 28 Days & Cost Of All Labour With T&P Etc. Complete. , Straightening, Cutting, Bending, Binding Tor Steel Rods, Cranking, Hooking, Tying The Grills & Placing In Proper Position For Reinforced Cement Concrete Work, Including Cost Of Binding Wires Of 18 To 20 Gauge, Cost, Conveyance, Taxes Of Steel And All Other Materials, Cost Of All Labour With T&P Required For The Work Etc. Complete. , Rigid Smooth Centering & Shuttering Cost, Conveyance, Taxes, Royalties Of All Materials, Cost Of All Labour With T&P Etc. Complete. , 16Mm Thick Cement Plaster With (1:6) Cement Mortar Including Cost Of Materials, Watering
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender