|
| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil |
| 2 | Supplying and stacking good earth at site of work. Note: 1) Loading, unloading and carriage to be paid extra as per actual lead. 2) Earth measured in stacks will be reduced by 20% foe payment |
| 3 | Carriage of excavated earth upto 5 km |
| 4 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manualy, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 5 | Providing and fixing precast cement concrete M-20 grade (Using mechanical Concrete Mixer) kerb stone top and bottom width 115 and 165 mm respectively, 250 mm high on 150 mm thick PCC M-10 grade foundation as per design, including fixing at site as per clause 408 of MoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion |
| 6 | Providing and fixing of precast concrete interlocking tiles of desired shape of M 30 grade manufactured from fully computerized automatic stationery hydraulic vibrio pressed machine and fully computerized automatic batching plant of class A1/A2 as per BS 6717:2001. The CC interlocking paving blocks be laid on average 50mm. thick bed of coarse sand and the joint is to be filled with fine sand. Laying procedure on compacted sub-base as defined. Complete job is to be executed as per the instruction of Engineer incharge. The rates to be inclusive of all lead & Lifts etc. complete as per specifications. Tensile splitting strength, abrasion and braking load etc. as per BS 6717:2001, Grey cement 80mm thick |
| 7 | Half brick circular tree guard, in 2nd class brick, internal diameter1.25 metres, and height 1.2 metres, above ground and 0.20 metrebelow ground, bottom two courses laid dry, and top three coursesin cement mortar 1:6 ( 1 cement 6 sand) and the intermediatecourses being in dry honey comb masonry, as per design complete |
| 8 | Providing and fixing MS iron tree guard 60 cm dia and 2 metre high above ground level formed of 4 Nos (25 x 6 mm) and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two halves, bolted together with 8 mm dia and 30 mm long bolts including painting two coats with paint of approved brand over a coat of priming, complete in all respects. |
| 9 | Digging holes in all kinds of soil and refilling the same with theexcavated earth mixed with well decayed farm yard manure (cost of well decayed farm yard manure to be paid separately). Hole 0.6 m dia and 0.6 m deep |
| 10 | Making lawns including ploughing and breaking of clod, removal of rubbish, dressing and supplying doobs grass roots and planting at 15 cm apart, including supplying and spreading of farm yardmanure at rate of 0.18 cum per 100 sqm. |
| 11 | Maintenance of lawns or Turfing of slopes (rough grassing) for aperiod of one year including watering etc. (for three Years) |
| 12 | Planting permanent hedges including digging of trenches, 60 cmwide and 45 cm deep, refilling the excavated earth mixed withfarmyard manure, supplied at the rate of 4.65 cum per 100 metresand supplying and planting hedge plants at 30 cm apart. |
| 13 | Maintenance of Hedge for one year (for three Years) |
| 14 | Supply and planting following species best quality container grown healthy trees of 2 mt. min. height, well established & free from disease at site in 0.90 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, backfilling the hole watering etc as required.Plumeria alba ( Champa) |
| 15 | Gulmohar(Delonix regia) |
| 16 | Jacaranda mimosifolia (Neelli Gulmohar) |
| 17 | Bauhinia blakeana (Arckid) |
| 18 | Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench,watering, fixing the tree guard and maintaining the plants for oneyear (for three Years) Please Enable Macros to View BoQ information |