|
| 1 | Supply, Installation, Testing And Commissioning Of A Minimum 02-Channel Voice Data Logger/Monitor With Server System |
| 2 | Supply & Installation of Server Hardware and software for centralized monitoring of voice communication with voice logging between stations/ DG/SHY through VHF-based secured communication equipment as per No RDSO/SPN/TC/38-2002 Ver. 2 or Latest amendments or Latest. The Technical specificationis as follows: - (I).Processor- Intel Core TM i7-6700T, Memory: 16GB, Hard disc drive: 1 TB SSD, Graphics card: NVIDIA GeoForce GT 730 (4GB DDR3dedicated), Networking 802 m, 11 b/g/n(1X1) and Bluetooth 4.0 m. 2 combo, Sound cards: DTS Studio Sound, keyboard, and mouse: HP USB Wired Keyboard with volume control, Power supply: 180 Watt AC power Adapter, Audio:DTS Sound, Memory slots: 2 DIMM, External I/O Ports:2 USB 3.0; 4 USB 2.0DIMM, Windows 11 operating system, LED Monitor: 24 (23.08\") 24 es slim Full HDIPS. (II). Centralized Monitoring Server software with search, Syns, online monitoring & Data Backup facility. (III).1.2 mm thick steel 19-inch rack, 600 mm W X 32 UHX 600 mm D, Fully Power Coated. Doors / Panels detachable, Front and back Door with locking arrangement, Casters 4 Nos. One Siding key board shelf,4 Nos. detachable Tray, AC Power distribution arrangement with 5 numbers of 5 Amps Sockets, Earthing Distribution arrangement, Cable/Route Manager. Details at server Annexure-\"E\" [ Warranty Period: 30 Months after the date of delivery ] ] |
| 3 | Supply, Installation, Testing and Commissioning of a minimum 02-channel Voice Data Logger/Monitor with Voice Data Recording and Processing Unit (VDRPU) conforming to RDSO/SPN/TC/38-2002 (Ver. 2.0 or latest), 12V/15 AMP SMPS, 12V/65AH SMF battery, 6U Wall mount Rack complete in all respects, including required interfaces for wireless/voice circuits, application software, documentation and on-site training, for recording station voice communications. The system shall be commissioned for recording of Station Master VHF communications by supplying and integrating dedicated VHF receiver(s) with suitable fixed audioline/discriminator output for feeding the logger inputs, with Driver/Guard (DG) channel recording mandatory (one VHF receiver per location). SHY channel recording optional (one additional VHF receiver per location wherever simultaneous SHY recording is required).The contractor shall supply and install all accessories and materials required for complete commissioning, including VHF receiver antenna(s), feeder cables, connectors, mounting hardware, interconnecting/power cables, earthing and consumables, and shall impart training to nominated Railway staff for operation and first-line maintenance. The Details of work is attached at Annexure-A.& List of locations is attached at Annexure-B, Annexure-C & Annexure-D [ Warranty Period: 30 Months after the date of delivery ] ] |
| 4 | Supply & Installation of Server Hardware and software for centralized monitoring of voice communication with voice logging between stations/ DG/SHY through VHF-based secured communication equipment as per No RDSO/SPN/TC/38-2002 Ver. 2 or Latest amendments or Latest. The Technical specificationis as follows: - (I).Processor- Intel Core TM i7-6700T, Memory: 16GB, Hard disc drive: 1 TB SSD, Graphics card: NVIDIA GeoForce GT 730 (4GB DDR3dedicated), Networking 802 m, 11 b/g/n(1X1) and Bluetooth 4.0 m. 2 combo, Sound cards: DTS Studio Sound, keyboard, and mouse: HP USB Wired Keyboard with volume control, Power supply: 180 Watt AC power Adapter, Audio:DTS Sound, Memory slots: 2 DIMM, External I/O Ports:2 USB 3.0; 4 USB 2.0DIMM, Windows 11 operating system, LED Monitor: 24 (23.08\") 24 es slim Full HDIPS. (II). Centralized Monitoring Server software with search, Syns, online monitoring & Data Backup facility. (III).1.2 mm thick steel 19-inch rack, 600 mm W X 32 UHX 600 mm D, Fully Power Coated. Doors / Panels detachable, Front and back Door with locking arrangement, Casters 4 Nos. One Siding key board shelf,4 Nos. detachable Tray, AC Power distribution arrangement with 5 numbers of 5 Amps Sockets, Earthing Distribution arrangement, Cable/Route Manager. Details at server Annexure-.E [ Warranty Period: 30 Months after the date of delivery ] ] |
| 5 | Supply & Installation of Server Hardware and software for centralized monitoring of voice communication with voice logging between stations/ DG/SHY through VHF-based secured communication equipment as per No RDSO/SPN/TC/38-2002 Ver. 2 or Latest amendments or Latest. The Technical specificationis as follows: - (I).Processor- Intel Core TM i7-6700T, Memory: 16GB, Hard disc drive: 1 TB SSD, Graphics card: NVIDIA GeoForce GT 730 (4GB DDR3dedicated), Networking 802 m, 11 b/g/n(1X1) and Bluetooth 4.0 m. 2 combo, Sound cards: DTS Studio Sound, keyboard, and mouse: HP USB Wired Keyboard with volume control, Power supply: 180 Watt AC power Adapter, Audio:DTS Sound, Memory slots: 2 DIMM, External I/O Ports:2 USB 3.0; 4 USB 2.0DIMM, Windows 11 operating system, LED Monitor: 24 (23.08\") 24 es slim Full HDIPS. (II). Centralized Monitoring Server software with search, Syns, online monitoring & Data Backup facility. (III).1.2 mm thick steel 19-inch rack, 600 mm W X 32 UHX 600 mm D, Fully Power Coated. Doors / Panels detachable, Front and back Door with locking arrangement, Casters 4 Nos. One Siding key board shelf,4 Nos. detachable Tray, AC Power distribution arrangement with 5 numbers of 5 Amps Sockets, Earthing Distribution arrangement, Cable/Route Manager. Details at server Annexure-\"E\" [ Warranty Period: 30 Months after the date of delivery ] ] |
| 6 | Supply, Installation, Testing and Commissioning of a minimum 02-channel Voice Data Logger/Monitor with Voice Data Recording and Processing Unit (VDRPU) conforming to RDSO/SPN/TC/38-2002 (Ver. 2.0 or latest), 12V/15 AMP SMPS, 12V/65AH SMF battery, 6U Wall mount Rack complete in all respects, including required interfaces for wireless/voice circuits, application software, documentation and on-site training, for recording station voice communications. The system shall be commissioned for recording of Station Master VHF communications by supplying and integrating dedicated VHF receiver(s) with suitable fixed audioline/discriminator output for feeding the logger inputs, with Driver/Guard (DG) channel recording mandatory (one VHF receiver per location). SHY channel recording optional (one additional VHF receiver per location wherever simultaneous SHY recording is required).The contractor shall supply and install all accessories and materials required for complete commissioning, including VHF receiver antenna(s), feeder cables, connectors, mounting hardware, interconnecting/power cables, earthing and consumables, and shall impart training to nominated Railway staff for operation and first-line maintenance. The Details of work is attached at Annexure-A.& List of locations is attached at Annexure-B, Annexure-C & Annexure-D. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 7 | Supply, Installation, Testing and Commissioning of a minimum 02-channel Voice Data Logger/Monitor with Voice Data Recording and Processing Unit (VDRPU) conforming to RDSO/SPN/TC/38-2002 (Ver. 2.0 or latest), 12V/15 AMP SMPS, 12V/65AH SMF battery, 6U Wall mount Rack complete in all respects, including required interfaces for wireless/voice circuits, application software, documentation and on-site training, for recording station voice communications. The system shall be commissioned for recording of Station Master VHF communications by supplying and integrating dedicated VHF receiver(s) with suitable fixed audioline/discriminator output for feeding the logger inputs, with Driver/Guard (DG) channel recording mandatory (one VHF receiver per location). SHY channel recording optional (one additional VHF receiver per location wherever simultaneous SHY recording is required).The contractor shall supply and install all accessories and materials required for complete commissioning, including VHF receiver antenna(s), feeder cables, connectors, mounting hardware, interconnecting/power cables, earthing and consumables, and shall impart training to nominated Railway staff for operation and first-line maintenance. The Details of work is attached at Annexure-A.& List of locations is attached at Annexure-B, Annexure-C & Annexure-D [ Warranty Period: 30 Months after the date of delivery ] ] |