| 1 | Excavation in water bound macadam road including stacking the serviceable and unserviceable material separately and disposal of unserviceable material lead upto 50m and lift upto 1.5 m disposed materials to be neatly dressed including minor tools, Water charges, Contractors Profit, Labour Welfare Cess, GST etc complete. |
| 2 | Laying water bound macadam with specified stone aggregate size, Stone screening and binding material including screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 tonne capacity etc. complete (Payment for stone aggregate, screening, kankar, moorum and red bajri etc., to be made separately/stone aggregate will be supplied by the department on free of cost.Base course with stone aggregate 53 mm to 22.4 mm size including stone screening 11.2 mm size (Grade-III). |
| 3 | Quarrying and collection of Earth/gravel/moorum for formation of embankment in road work from 3 Km lead including cost of hire charges of truck, POL, operator charges, all labour charges for quarrying, loading and unloading at site, royalty charges stacking of material at work site,minor tools, Water charges, Contractors Profit, Labour Welfare Cess, GST etc complete. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutteirng - All work upto plinth level using 1:3:6 (1 cement, 3 Pulverised stone sand and 6 graded stone aggregate 40mm nominal size) including cost of all labour charges, construction materials, transportation,minor tools, Water charges, Contractors Profit, Labour Welfare Cess, GST etc complete. |
| 5 | Reinforced concerete works in beams, suspended floors, roofs, landing, balconies, shelves, chajjas, lintels, bands, plain window sil, stairs and spiral stairs upto floor V levels excluding cost of centering, shuttering, finishing and reinforcement. 1:1½ :3 (1 Cement, 1½ Pulverised stone sand, 3 graded stone aggregates 20mm size.) including labour charges, construction material cost,transportaion of materials, minor tools, Water charges,CP,Labour welfare cess, GST etc. complete. |
| 6 | Steel centering and shuttering including strutting propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantievers includingcost of materials, labour charges, transportation,minor tools, Water charges, Contractors Profit, Labour Welfare Cess, GST etc complete. |
| 7 | Providing and fixing Tor steel reinforcement for R.C.C. work including cutting, bending, binding, and placing in position but including cost of steel, binding wire, minor tools,transportation, labour charges, labour cess, water charges, CP,GST etc. complete. |
| 8 | Supplying and filling in plinth with pulverised stone sand under floors including, watering, ramming consoldating and dressing complete.as directed by the engineer, including cost of all labour charges, cost ofminor tools,GST,LWC, etc complete. |