|
| 1 | Earthwork excavation up to 2.50mt. depth for providing additional septic tank to the toilet block in addition to the existing and for new soak pits and disposal of waste up to 100mt. from the site including cost of material, all charges and applicable taxes etc. complete as per specifications and directions of the department officials. |
| 2 | Providing PCC 1:4:8 with 40mm HBG metal to the additional septic tank to the toilet block in addition to the existing and for new soak pits including cost of material, all charges and applicable taxes etc. complete as per specifications and directions of the department officials. |
| 3 | Construction of RR masonry wall in C.M. (1:4) to the additional septic tank to the toilet block in addition to the existing and for new soak pits including cost of material, labour charge, machine charges, all charges and applicable taxes etc. complete as per specifications and directions of the department officials. |
| 4 | Providing RCC roof in 1:2:4 with 20mm HBG metal to the new septic tank including cost of material, labour charges, machinery charges, all other charges and applicable taxes etc. complete as per the specifications and directions of the department officials |
| 5 | Providing plastering to the walls of additional septic tank to the toilet block in addition to the existing and for new soak pits all charges and applicable taxes etc. complete as per specifications and directions of the department officials. |
| 6 | Providing connection to the septic tank and soak pits from the toilet block by using PVC pipes etc. including cost of material, necessary material, installation charges and applicable taxes etc. complete as per specifications and directions of the department officials |
| 7 | Providing lightning conductor to the Ramappa Temple to avoid any sort of damage through the lightning during rainy seasons including supply, Installation of Advanced Lightning Protection System of Collection Volume Method with Maintenance Free Earthing System. Including Air terminal of Dynasphere MkIV SS. Non- corroding Made of stainless steel as per IEC61024 designed and tested to meet UL-96 placement methodology as specified in IEEE-998, Elevation pole of sufficient height, Down Conductor of required length, Lightning Event Counter etc as per IEEE specifications also include transportation, GST and other applicable taxes etc complete as per specifications and directions of the department officials. |
| 8 | Providing Integrated IP 65 30W Solar Street Light with aluminium Body, Toughened Glass, Poly crystal Solar panel with cool white SMD LED Light, Beam angle 120 °C, High Bright Reflector, Charging time is minimum 6 Hrs and maximum 8 Hrs, Lighting Time 24 Hrs (Subject to using dusk to dawn / Induction Mode / Duration Mode of Timers), used High efficiency LiFe PO 4 Battery, Auto dim and Auto Bright, Motion sensor with 2 years warranty. in the premises of Ramappa Temple Complex including E.W. Excavation, cost of poles, electrical fixtures, installation charges etc. all charges and applicable taxes etc. complete as per specifications and directions of the department officials. |
| 9 | Earthwork excavation for providing poles to fix the CCTV surveillance system(Providing 4 mega pixel, 60mt range CP plus / Accura /Honeywell CCTV surveillance system in the Ramappa Temple Complex) |
| 10 | Providing PCC (1:2:4) to erect the poles to fix the CCTV surveillance system (Providing 4 mega pixel, 60mt range CP plus / Accura /Honeywell CCTV surveillance system in the Ramappa Temple Complex) |
| 11 | Providing 6m GI Poles with silver paint to fix the CCTV surveillance system (Providing 4 mega pixel, 60mt range CP plus / Accura /Honeywell CCTV surveillance system in the Ramappa Temple Complex) |
| 12 | Providing 4 mega pixel, 50mt range CP plus /Accura /Honeywell CCTV (Providing 4 mega pixel, 60mt range CP plus / Accura /Honeywell CCTV surveillance system in the Ramappa Temple Complex) |
| 13 | Providing fibre flexible 6 core cable outdoor finolex cable connecting all the cameras covering all the places including cost of cable laying from main gate, earthwork excavation of about 1.00ft x 2.00ft, covering the cable with Cement mortar in place of cable laid on stone pathway, closing the excavated trenches, loading,unloading, conveyance of cable, applicable taxes etc. all complete as per the instructions of the ASI officials |
| 14 | Providing 32 channel network video recorder 4 -SATA of CP Plus / HIKVISION and its accessories including cost of material, installation, fittings, loading, unloading, conveyance, applicabletaxes etc. all complete and as per the directions of the ASI officials. |
| 15 | Providing professional 43\" LED monitor of LG//Mi/Samsung/Sony HD ready LED smart Android TV including cost of material, installation, loading, unloading, conveyance, applicable taxes etc. all complete as per the directions of ASI officials |
| 16 | Purchasing surveillance hard disk 6TB - SATA 6GB interface of SEAGATE make / SV -35 including cost of material, loading, unloading, conveyance, applicable taxes, installation charges etc. complete and all as per directions of the ASI officials |
| 17 | Cost of fixtures and accessories required like 4 core POE switch, Network rack 42\" 9U, Fibre optic pigtales, CAT6 STP cable of D Link make, 4 core Spikes, 5amp MCB of Anchor, Messenger wire for Fibre cable, Fibre termination box, D Link RJ jacks, PVC pipes etc. for connections providing CCTV surveillance system etc. including cost of material, loading, conveyance, unloading charges, splicing charges, applicable taxes installation charges etc. all complete as per the instructions of ASI officials |
| 18 | Cost & supply UPS 650wt of Intex / Cyberpower including cost of material, installation charges, loading, unloading, conveyance, applicable taxes etc. complete all as per specification and directions of the ASI officials |
| 19 | Level) after deductions Qty 1700.761- 450.328= 1250.433) |