| 1 | Engaging Labour for cleaning and clearing the surrounding area of the sadyalayam.Mancoolie |
| 2 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) |
| 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 4 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominalconcrete 1:4:8 or leaner mix ( including equivalent design mix) |
| 5 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 9 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approvedmake in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thickcement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @3.3 kg/sqm including pointing the joints with white cement and matching pigmentetc., complete |
| 10 | Engaging Labor for repair and maintenance to the existing doors :Carpenter second class |
| 11 | Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. |
| 12 | Supplying MP Ist class roofing tiles (Manglore patterns) tiles 410x235mm or nearest available size (single groove) |
| 13 | Roofing Departmental MP tiles (Mangalore Pattern) Tiles 410x235 mm or nearest available size (Single groove) |
| 14 | Cleaning the old painted surface having algae and other impurity using pressure washer including labour & hire of pump etc. Complete |
| 15 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 16 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work |
| 17 | Engagaing labour for attending repair works to the existing gate ,including cutting of frames,welding,etc., if necessary Blacksmith 1st class |
| 18 | Engaging labour Charges for washing and cleaning toilet rooms with suitable detergent,stain remover,etc., Man coolie |
| 19 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for workingplatform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . |
| 20 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases,including use of chequered plate wherever required, all complete Please Enable Macros to View BoQ information |