| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil. DSR 2023- 2.8.1 |
| 2 | Earth work in cutting or embankment in ordinary soil,excavation to be in the form of regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to required levels and slopes and including 1.50m lift and 30 m lead also including cartage of earth upto 8 kms,cost of earth if any,and royalty etc complete in all respect. SI No. 253 (a) - Soil Filling |
| 3 | Arrangement of sweeper gang full time. PWD SOR 2020-21/Labour Chapter/51 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). DSR 2023- 4.1.8 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). DSR 2023- 5.3 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023- 4.1.3 |
| 7 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level. (SI No. 504) (Sanction Rate) - SI 504 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :, Foundations, footings, bases of columns, etc. for mass concrete DSR 2023- 5.9.1 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for :, Suspended floors, roofs, landings, balconies and access platform DSR 2023- 5.9.3 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:, Cement mortar 1:4 (1 cement : 4 coarse sand) DSR 2023- 6.1.1 |
| 11 | 12 mm cement plaster of mix :, 1:4 (1 cement: 4 coarse sand) DSR 2023- 13.4.1 |
| 12 | Providing & Laying PVC blind pipe 200 mm dia as per IS: 12818 in connecting Sewer Line Chember (DSR-2023/7746) - PVC Pipe |
| 13 | Construction of 1.00x1.20x1.50 m internal size manhole as per standard dsign and specification of LDA & including 30 cm thick cement concrete 1:4:8 base & channel (with 40 mm stone ballast, coarse sand & cement), brick work one & half brick work thick in 1:4 cement & coarse sand mortar & with neat cement finish including 16 mm dia M.S. bar foot rest embedded with 1:2:4 cement concrete at 23 cm centre to centre and 15 cm thick RCC slab with 1:1.5:3 cement, coarse sand and 2 cm guage stone grit with including Circular Shape 560mm dia Precast R.C.C. Manhole Cover with Frame (EHD-35), floor with 1:2:4 cement concrete all complete as per Engineer in charge of work (height will be measured from invert of pipe to bottom of the slab (Sanction Rate) -1067 |
| 14 | Providing and applying DRYTHANE 400 HE with Surfacer water proof coating 0.50 mm including DRYTHANE Standard 1.00 mm thick including surface cleaning etc all comp. all area as per direction of engineer in charge. (Sanction Rate for Kanpur Nagar Nigam) - DRYTHANE 1mm Thick |
| 15 | Cleaning of exposed concrete surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge. DSR 2023- 26.37 Please Enable Macros to View BoQ information |