| 1 | SAFE LOADING CARRIAGE & UNLOADING OF FOLLOWING MATERIALS FROM CENTRE STORE, LAKHIMPUR TO WORK SITES AND ITS STACKING DISTANCE APPROX (0-100) KMS |
| 2 | LINE MATERIAL |
| 3 | PCC POLE 8.5 Meter Long |
| 4 | PCC POLE 11 Meter Long |
| 5 | T/F16/25/63/100 KVA |
| 6 | ACSR RABIT/DOG/RACOON/WEASEL/CONDUCTOR |
| 7 | ABC (3X120/95/70/25/16) SQMM |
| 8 | FABRICATION, ERECTION OF SUB-STATION TYPE DOUBLE POLE ON 8.5 MTR LONG PCC/11MTR LONG ST POLE ALONG WITH FIXING OF NECESSARY HARDWARE OF DOUBLE POLE ALONG WITH NECESSARY PIN INSULATOR AS PER RESSPO SPECIFICATION. |
| 9 | DRAGGING OF ST/PCC POLE TO PIT SITE DIGGING OF PIT ERECTION AND GROUTING (AS PER RESSPO NORMS) INCLUDING PROVIDING ALL DECENTRALISED MATERIAL REQUIRED FOR COMPLETION OF WORK . WORK IS TO BE CARRIED OUT AS PER RESSPO SPECIFICATION COMPLETE IN ALL RESPECT. |
| 10 | FABRICATION, ERECTION, T-OFF POLE SINGLE SECTION POLE ALONG WITH T-OFF CHANNEL CLAMP DISC FITTING & PIN ACCESSORIES, GROUNTING IN 1:4:8 CEMENT , BRICK BALLAST AND RIVER SAND AS PER RESSPO SPECIFIATION |
| 11 | GROUTING OF POLE WITH BRICKS BALLAS ,SAND AND CEMENT RATIO 1:4:8 |
| 12 | PROVIDING NUT BOLTS WASHERS OF DIFFERENT SIZES |
| 13 | ORDINARY EARTHING BY MS EARTH ROD 2500MM LONG AS PER RESSPO SCHEDULE. ONLY GI WIRE & EARTH ROD SHALL BE SUPPLIED BY THE DEPARTMENT |
| 14 | GROUTING AND NUZZLING OF STAY SET COMPLETE INCLUDING ITS GROUTING BY CIVIL MATERIAL (CEMENT, BRICK BALLAST AND RIVER SAND ) ONLY STAY WIRE SHALL BE SUPPLIED BY THE DEPARTMENT |
| 15 | LAYING AND SAGGING OF 3 PHASE 3 WIRE 11 KV LINE ON ACSR WEASE/RABBIT/RACCOON/DOG CONDUCTOR AS PER RESSPO SPECIFICATION AND DIRECTION OF E/I |
| 16 | PROVIDING AND FIXING OF GUARDING ANGLE ON EXISTING 11KV SUPPORT WITH CLAMP AND NUT BOLTS |
| 17 | CRADLE GUARDING OF HT LINE BY GI WIRE SHALL BE SUPPLIED BY THE DEPARTMENT |
| 18 | ERECTION & COMMISIONING OF (3X120/95/70/25/16SQ.MM) |
| 19 | PROVIDING OF CLAMP OF SIZES. |
| 20 | DRAGGING CUTTING AND MAKING OF HOLE. |
| 21 | CUTTING AND CHOPPING OF TREE BRANCHES FOR CLEARENCE OF HT/LT LINE AFTER CLEARANCE LINE THROUGHOUT PIECES OF TREE BRANCHES OF SITE AS AND WHEN REQUIRED FOR COMPLETION OF WORK. |
| 22 | SAFE INSTLLATION AND ENERGIZATION OF 10/16/25/63/100 KVA T/F ON DOUBLE POLE BY PROVIDING AND FIXING OF L PIECE LUS MAKING HT/LT CONNECTION AND ITS COMMISSIONING ONLY TRANSFORMER SHALL BE SUPPLIED BY THE DEPARTMENT. |
| 23 | PROVIDING OF LT AND STAY INULATOR |
| 24 | GST EXTRA Please Enable Macros to View BoQ information |