|
| 1 | Supply, delivery of 7.5 HP 3 phase submersible pumpset with motor Suitable for 165mm dia deep bore well conforming to IS 8034/89 with ISI marking as per specification for installation of 165mm deep borewells as per ISI, 50LPM x250m head including pre delivery inspection charges, packing, loading, transportation, unloading, stacking, transit insurance and other contingencies etc., complete As per tward sor 2025-2026( WD-M1623) |
| 2 | Supply and fixing of 7.5.hp phase panel board with starter, MCB single phase, preventor, capacitor, volt meter, Ammeter etc., complete as per standard specification.Tward sor 2025-2026 ( WD-W0869) |
| 3 | Supply and delivery of 16 Gauge of M.S.Kiosk of size 0.75x0.45x0.75 for fixing of meter board switch board with MS door and lock and key arrangement etc., complete as per standard specification.Tward sor 2025-2026 (WD-M1471) |
| 4 | Supplying of 3 core flat submersible cable with copper multi stand conducted with ISI mark should be delivered of 4sqmm flat submersible cable inluding packing, loading, transporation, unloading, stacking, tranist insurance etc., complete.2025-2026 (WD-M1958) |
| 5 | Supply and fixing of TNEB meter board suitable for 32A three phase service connection with 3 Nos. 32A fuse unit (500V) 32A neutral link and earth link (1\" x 1/8\" copper flat) on TW plank of size 600mm x 450mm x 19mm with supporting TW reepers of 1\" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit .Electricl dt (SD 128) |
| 6 | Supply and delivery of HDPE Pipes Specials approuved quality of departmental officers loading, unloading, Frieght and transit insurance etc., Cost and conveyance of all materials to Site etc., Complete. (TWAD Pg no:- 51) |
| 7 | 11/2\"\" U PVC PIPE(WD-M0051) |
| 8 | 11/2\"\" CLAMP SET(WD-M0617) |
| 9 | 50mm HDPE Pipe |
| 10 | 50mm HDPE Bend |
| 11 | 50mm HDPE Tee |
| 12 | Labour Charges for the erection of Submersible pumpset in borewell / open well including fixing and jointing submersible cable withproper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN swtiches starter voltmetre, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cable and twin earthing as per IE rules etc., Complete and testing the pumpset and trail run for 10 days.Tward sor 2025-2026 (WD-W0872) |
| 13 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers (TWAD 2025-26 - Unique Code - WD-W0619)-50mm HDPE pipe |
| 14 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers - For depth upto 2m (TWAD 2025-26- (WD-W0429) |
| 15 | Refilling excavated soil (other than sand) complying with the standard specification for filling in foundation and basement (TWAD 2025-26) Please Enable Macros to View BoQ information |