|
| 1 | Dismantling of C.C. road and including disposal and stacking of serviceable materials including supply of labour, T&P all complete |
| 2 | Excavation of foundation in ordinary soil including lift upto 1.50 Mtr with supply of labour, T&P etc all complete (For M.H.) |
| 3 | Concrete work with 12 gauge bricks, blast sand & cement in foundation under floor in proportion of 1:5:1 including supply of labour, material, T&P etc all complete (For Sewer Line) |
| 4 | Providing necessary arrangement of barricading with sal ballies, red flag, labour, T&P etc all complete (For M.H.) |
| 5 | 1st class brick work with 1:3 cement & coarse sand mortar including supply of labour, material, T&P etc all complete |
| 6 | 12 mm thick plaster with 1:3 cement & L. sand mortar with supply of labour, material, T&P etc all complete |
| 7 | Providing bier to retain sewage water etc all complete |
| 8 | RCC work with cement, C.sand & 20 mm gauge approved stone ballast in proportion of 1:3:5 in slab including supply of labour, material, T&P etc all complete |
| 9 | Mild steel or iron work in slab |
| 10 | Bailing out of water with 5 H.P. diesel pump including all accessories such as suction & non skilled labour including supply of labour, T&P all complete |
| 11 | Cast cement concrete for seat fixing in manhole, sand, stone with supply of labour, material, T&P etc all complete |
| 12 | Supply & laying of RCC pipe 300 mm internal dia including supply of labour, material, T&P etc all complete |
| 13 | Making sewer line connection with supply of labour, material, T&P etc all complete |
| 14 | Supply of RCC frame size 650x75 mm |
| 15 | Supply of RCC cover on manhole size 650x75 mm |
| 16 | Disposal of surplus earth & dismantled malva of excavated earth including loading, unloading, cartage etc all complete |
| 17 | Unforeseen work as cartage of pipe Please Enable Macros to View BoQ information |