|
| 1 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). |
| 2 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 3 | CARRIAGE OF MATERIALS By Mechanical Transport including loading ,unloading and stacking lead upto 1 KM |
| 4 | Earth |
| 5 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) |
| 6 | Screened through sieve of I.S. designation 16 mm |
| 7 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge |
| 8 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately) |
| 9 | Rough dressing the trenched ground including breaking clods |
| 10 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). |
| 11 | In rows 5 cm apart in both directions |
| 12 | Supplying & Stacking of Selection No.1 doob grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge |
| 13 | Edging with brick tiles laid dry length wise, including required excavation, refilling, consolidating with hand packing and spreading surplus earth neatly within a lead of 50 |
| 14 | Providing & fixing brick peices of size of 2\" to 2.50\" dia in natural colour at site of work including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge |
| 15 | Providing & fixing of White River (Stone) Pebbles size of 2\" to 2.50\" dia in natural colour at site of work including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge |
| 16 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) |
| 17 | Holes 60 cm dia, and 60 cm deep |
| 18 | Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water) |
| 19 | Shrub Plant |
| 20 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 21 | All kinds of soil |
| 22 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 23 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 24 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required |
| 25 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 26 | MS Angle/T-Iron 40mmx40mmx5mm |
| 27 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade |
| 28 | Two or more coats on new work |
| 29 | Providing & fixing of tuflex garden fencing hexagonal net/ or equivalent of green color contents Weight grams/sqm. 510(+/- 8%).. The fencing should be fixed on MS angle frame including self screw and washers etc. (The item of MS angle frame will be paid in item No. 17 above) |
| 30 | Providing & placing of pots alongwith ornamental plants |
| 31 | Raphis palm (3\"-4\" ht) in Cement pots (22\") |
| 32 | Areca palm 5\"-6\" ht (03 Nos.) in each Cement pots (22\") |
| 33 | Ficus panda topiary (3\"-4\" ht.) (single ball) in Cement pot (22\") |
| 34 | Ficus micro carpa 3\"-4\" ht. (single ball) topiary in Cement pots (22\") |
| 35 | Supplying of ornamental plants |
| 36 | Murraya paniculata (3\" ht.) |
| 37 | Dianella |
| 38 | Nollena palm (4\" ht.) |
| 39 | Zamia palm (3\" dia) |
| 40 | Cycas palm (3\" dia) |
| 41 | Maleleuca golden topiary (5\"-6\" ht.) |
| 42 | Ficus retusa topiary (5\"-6\" ht.) |
| 43 | Leucophyllum frutiscens ball (2\"x2\") |
| 44 | Leucoplyllum frutiscens plants (2\"-3\" ht.) |
| 45 | Zebrina pandula |
| 46 | Wadhelia |
| 47 | Zade plant |
| 48 | Duranta goldiana |
| 49 | Iresine |
| 50 | Ophiopogon variegated (ribbon grass) |
| 51 | Ophiopogon black |
| 52 | Rhoeo |
| 53 | Tredecentia |
| 54 | Chlorophyttum |
| 55 | Singonium |
| 56 | Juniperus golden (5\"-6\" ht.) |
| 57 | Plumeria dwarf (4\"-5\" ht.) |
| 58 | Ficus panda topiary (4\"-5\" ht.) |
| 59 | Araca palm ((6\"-7\" ht.) |
| 60 | Schfflera variegated (1\" ht.) |
| 61 | Add difference of water charges @ 0.5% |
| 62 | Add GST @ 21.27% on Hort. Items i.e. On Rs. 115416.42 |