| 1 | Safe carriage of following materials from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms. |
| 2 | S.T. Pole 11 Mtr. Long |
| 3 | Earthing Complete |
| 4 | Stay Set complete 16x1800 |
| 5 | 11 KV Pin Insulator with complete |
| 6 | 11 KV V-Type Cross Arm |
| 7 | 11 KV Disc Insulator with fitting |
| 8 | ACSR Dog Conductor |
| 9 | Supply & Erection work of following materials:- |
| 10 | MS Top Channel (125X65X224 mm.) |
| 11 | Dropper Channel 100x50x2028 mm. |
| 12 | MS Channel (T-off) with clamp |
| 13 | Clamps with bolts & Nuts |
| 14 | Concreting of Pole |
| 15 | MS Base Agnle T/F |
| 16 | F-Bracket for fitting top insulator |
| 17 | E-Bracket for fitting top insulator |
| 18 | PG Clamp |
| 19 | Cross Bracing MS Angle |
| 20 | 11 KV Fuse Set |
| 21 | Dismantling and removal of existing following materials from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. |
| 22 | ACSR Weasal Conductor (Scrap) 3819 Mtr. |
| 23 | Iron (Scrap) |
| 24 | Iron Pole (Scrap) |
| 25 | Safe carriage of following new Items from Store centre or from any other place to the respective site of work through the Kachha/ Pacca road including the work of its loading & unloading at the respective ends and erection of this item also including the work of dragging and jumpering/termination suitable conductor/wire etc. as per site requirement including the supply of labour, T&P cartage etc. required for proper completion of work as per RESPO Norms. |
| 26 | 33kv Fuse set |
| 27 | Battery Bank suitable for 24 Volt |
| 28 | Battery Charger suitable for 24 Volt Battery Bank |
| 29 | 33 KV Lightning Arrestor |
| 30 | Control Cable (4x2.5 Sq.mm.) |
| 31 | Control Cable (2x2.5 Sq.mm.) |
| 32 | 33 KV Line ISOLATOR |
| 33 | 33 KV Bus ISOLATOR |
| 34 | Breather with Silica Gel suitable for 05/08/10 MVA T/F |
| 35 | Dismantling and removal of existing following defective items installed in switchyard of different Sub-Stations in the jurisdiction of EDC-I, Aligarh and carriage of the same to Store/Safe location as per direction of Supervising Engineer. Including loading unloading stacking in Store safely and supply of all T&P and labour for execution of work. |
| 36 | 33kv Fuse set |
| 37 | Battery Bank suitable for 24 Volt |
| 38 | Battery Charger suitable for 24 Volt Battery Bank |
| 39 | 33 KV Lightning Arrestor |
| 40 | Control Cable (4x2.5 Sq.mm.) |
| 41 | Control Cable (2x2.5 Sq.mm.) |
| 42 | 33 KV Line ISOLATOR |
| 43 | 33 KV Bus ISOLATOR |
| 44 | Breather with Silica Gel suitable for 05/08/10 MVA T/F Please Enable Macros to View BoQ information |