| 1 | iw.kZ tek ;kstuk esa tuin egksck ds vUrxZr ijekuUn pkSjkgs ls >ydkjh ckbZ pkSjkgs rd 33 dsoh fo|qr ykbuksa dks f’k¶V djkus dk dk;Z ¼VuZdh vk/kkj ij½ as per RESSPO Supply & Erection of Drawings/Estimate and as per direction of Engineer Incharge. Work includes all cartage/carriage, cost of labour,T&P, fitting and fixing of material, commissioning and any other work which is required for completion of work. |
| 2 | ST POLE 11 MTR LONG |
| 3 | ST POLE 13 MTR LONG |
| 4 | Laying sagging stringing binding and jumpering of ACSR DOG Conductor at 33 KV Line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. |
| 5 | 33 KV Top Channel MS 125*65*3200mm |
| 6 | 33 KV Cross bracing M.S.Angle |
| 7 | 33 KV Pin Insulator |
| 8 | 33 KV Pin with Nut |
| 9 | 33 KV DISC INSULATOR B&S TYPE 70 KN |
| 10 | 33 KV DISC FITTING |
| 11 | Earthing Complete - ( Earthing Rod , GI Wire 6 SWG) |
| 12 | 33 KV STAY COMPLETED (Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) |
| 13 | Clamp with nut & bolt |
| 14 | Danger board with clamp Nut & Bolt |
| 15 | Barbed wire |
| 16 | GAURDING WIRE |
| 17 | Number plate |
| 18 | 33 KV E-BRACKET |
| 19 | 33 KV F-BRACKET |
| 20 | PG Clamp |
| 21 | Stone Pad |
| 22 | 33 KV V-TYPE POLE STEEL X-ARM |
| 23 | 33 KV X-ARM HOLDING CLAMP For STP Pole |
| 24 | 33 KV MS GAURDING ANGLE |
| 25 | 33 KV MS GAURDING ANGLE CLAMP |
| 26 | BOLT NUT & WASHER |
| 27 | M.S. T-off Channel |
| 28 | Concreting of Stay including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 29 | Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 30 | Muffing of pole (0.880 cu.m.each) |
| 31 | iw.kZ tek ;kstuk esa tuin egksck ds vUrxZr ijekuUn pkSjkgs ls >ydkjh ckbZ pkSjkgs rd 11 dsoh ,oa ,y0Vh0 fo|qr ykbuksa dks f’k¶V djkus dk dk;Z ¼VuZdh vk/kkj ij½ as per RESSPO Supply & Erection of Drawings/Estimate and as per direction of Engineer Incharge. Work includes all cartage/carriage, cost of labour,T&P, fitting and fixing of material, commissioning and any other work which is required for completion of work. |
| 32 | ST POLE 11 MTR LONG |
| 33 | PCC POLE 8.5 MTR LONG |
| 34 | Laying sagging stringing binding and jumpering of ACSR WEASEL Conductor as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. |
| 35 | Laying sagging stringing binding and jumpering of ACSR RABBIT Conductor as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. |
| 36 | 11 KV XLPE cable 3×120 mm² (Laying of 11 KV, 3x120 Sqmm. XLPE cable in Air & making loop on Double Pole Structure and testing, commisioning & energization of cable.) |
| 37 | 11 KV XLPE cable 3×70 mm² (Laying of Drawings/Estimate and as per direction of Engineer Incharge. Work includes all cartage/carriage, cost of labour,T&P, fitting and fixing of material, commissioning and any other work which is required for completion of work.) |
| 38 | LT ABC (3X120+1X95+1X16)Sqmm (Laying of Drawings/Estimate and as per direction of Engineer Incharge. Work includes all cartage/carriage, cost of labour,T&P, fitting and fixing of material, commissioning and any other work which is required for completion of work.) |
| 39 | MS Dropper Channal |
| 40 | Top Channel MS 100*50*2240mm |
| 41 | Cross bracing M.S.Angle |
| 42 | 11 KV Pin Insulator |
| 43 | 11 KV Pin with Nut |
| 44 | 11 kV Disc Insulator |
| 45 | 11 kV Disc Fitting |
| 46 | Earthing Complete - ( Earthing Rod , GI Wire 6 SWG) |
| 47 | Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) |
| 48 | clamp with nut & bolt |
| 49 | Danger board with clamp |
| 50 | Barbed wire |
| 51 | GIWIRE 6 SWG (SUPPORTING WIRE) |
| 52 | number plate |
| 53 | E- Bracket |
| 54 | F- Bracket |
| 55 | PG Clamp |
| 56 | Stone Pad |
| 57 | Lt Clamp with Nut & Bolt |
| 58 | Suspension Clamp |
| 59 | Three Phase Distribution Box with Clamp |
| 60 | Piercing Clamp |
| 61 | Dead End Clamp |
| 62 | Eye Hook |
| 63 | LT PVC Cable 1X70 Sqmm |
| 64 | Alu Lug 1X120 SQmm |
| 65 | LT Armoud Cable 2X4 Sqmm |
| 66 | MS-X arm \"V\" Type |
| 67 | MS-X arm Holding Clamp for ST Pole |
| 68 | MS-X arm Holding Clamp for PCC Pole |
| 69 | M.S. T-off Channel |
| 70 | Cable J/K 11 KV Xlpe Cable 3x120 sqmm O/D |
| 71 | Transformer base angle |
| 72 | 11 kv GI pin nut & bolt |
| 73 | Camical Pipe Earthing for Transformer |
| 74 | GI Strip 35*5 mm |
| 75 | Al Lug 70 sqmm |
| 76 | 11 kV Fuse Set |
| 77 | Shifting of 25 KVA Transformer |
| 78 | Shifting of 63 KVA Transformer |
| 79 | Shifting of 100 KVA Transformer |
| 80 | Contraction Plinth for 250/400 KVA Transformer as required on All material as per RESPO norms and direction by supervising Engineer. |
| 81 | Contraction Fancing for 250/400 KVA Transformer as required on All material as per RESPO norms and direction by supervising Engineer. |
| 82 | Shifting of 250 KVA Transformer |
| 83 | Shifting of 400 KVA Transformer |
| 84 | Concreting of Stay including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 85 | Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 86 | Muffing of pole (0.880 cu.m.each) |
| 87 | Cost of Consumer Connection & Meter |
| 88 | dk;Znk;h laLFkk }kjk fMLesUVfyax dh xbZ lkexzh dks lkbV ls mBkdj Hk.Mkj dsUnz egksck esa tek djkus dk dk;ZA lkexzh dk fooj.k fuEuor gS& Removal of old & Used Material |
| 89 | Received back of Iron GI Screp(Iron) |
| 90 | Received back of ACSR COnductor Screp(Aluminium) |
| 91 | Received back of Round Pole scrap/ RS Joist Screp(Pole) |
| 92 | Received back of 11 KV XLPE Cable 3X120 Sqmm Scrap(Aluminium) Please Enable Macros to View BoQ information |