| Sl. No. | Item Description |
| 1 | Opening of the VCB, 11 KV 400 to 800 Amps of any make by removing of the Breaker from the existing position after disconnecting all the connections from the system, servicing, Overhauling of the same, checking of the same for proper operation, spring charge, charged control cables are fastened tightly to the terminals, any abnormality, VCB, cleaning the surface of the insulators, fasten the bolts, checking and correctinginterrupting units, mechanism, linkages etc, fasten the hardwares of control wiring, check that the split pins, Circlips, dowell pins etc. have not come out and are intact, lubricate the mechanism, moving parts by castrol, all purpose grease or equivalent, check that the vaccum pots/chambersis within limit including opening of the shutters properly, replacing of the trip catch, roller, holding catch, stopper, close push button, closing cum reassembling, controll limit switches reconnecting of the breaker for smooth functioning complete all as specified and directed by Engr-in-Charge. (Note:- Spare parts will be paid separately under respective items) |
| 2 | Supply in replacement of space heaters of 1 KW, 220Volts complete all as specified and directed by Engr-in-Charge. |
| 3 | Supply in replacement ofthermostate adjustable type 30 to 120 degree C complete all as specified and directed by Engr-in-Charge. |
| 4 | Supply in replacement of motor & gear assembly 230V AC suitable for 400/630/800 amps, 11 KV HT VCB including testing & puting on load complete all as specified and directed by Engr-in-Charge. |
| 5 | Supply in replacement (at site on VCBs as per existing size), male contact (Copper) suitable for HT 11 KV powersupply complete all as specified and directed by Engr-in-Charge. |
| 6 | Supply in replacement (at site on VCBs as per existing size), Female contact (Copper) suitable for HT 11 KV power supply complete all as specified and directed by Engr-in-Charge. |
| 7 | Supply in replacement of Current Transformers draw type 11KV, 300/150/1-1, Core1: Class 5P10, 10VA, Core2: Class 0.5, 10 VA complete all as specified and directed by Engr-in-Charge. |
| 8 | Supplying and fixing in replacement of Current Transformers draw type 11kV, 200/100/1-1, Core1: Class 5P10, 10VA, Core2: Class 0.5, 10 VA complete all as specified and directed by Engr-in-Charge. |
| 9 | Taking down the old/unserviceable potential transformer and supply & fixing of new 11KV/110V/100VA with drawable type and epoxy incl PT grid with risers complete suitable for HT 11KV panel complete incl testing & commissioning complete all as specified and directed by Engr-in-Charge.Make : Alstom / Kappa/Jyothi |
| 10 | Shifting of Transformer from substations to variours substation / transformers locations in the area of AGE(U) E/S No III by road using and removing the faulty transformer by fixing / erecting of the healthy tansformer with the hydra / crane support making the necessary HT / LT cable connections earth connections and restoration of power supply complete all as specified and directed by Engr-in-Charge. |
| 11 | Taking down unserviceable sheet gasket (Cork sheet), Supply and fixing of synthetic rubberized cork sheet gasket 6mm 2\" x 3\" size sheet thick for top cover HT/LT bushes at places existing and tighting all the bushings and top cover to avoid any oil leakages of capacity 160 KVA to 500 KVA complete all as specified and directed by Engr-in-Charge. |
| 12 | M&L in replacement of Cable end jointing kit for 11 KV (Earthed) grade indoor type heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 240 Sqmm to 300 Sqmm complete all as specified and directed by Engr-in-Charge. |
| 13 | M&L for replacement of Earthing complete with galvanized steel earth plate electrode of size 60cmx60cmx6 mm thick, buried directly in ground (earth pit not less than 2.10 m below normal ground level) with top edge of earth plate not less than 1.5mbelow normal ground level, connected to galvanized iron strip 32 x 6mmby means of bolts, nuts, check nuts and washers of galvanised iron or steel as shown in electricalplate No 3 of SSR Part I, connected to earth test point and the equipment on the other nuts and washers of galvanised ironside complete all as specified, including testing and commissioning complete all as specified and directed by Engr-in-Charge.Note : (a) The unit rates quoted against this item shall be deemed to include the cost of excavation and earth work in any type of soil, common salt & charcoal dust in alternate layers, PCC 1:3:6 as in pit, precast RCC 1:2:4 type B-1 with necessary reinforcement as in cover & frame for pit, funnel, watering pipe 20 mm bore GI pipe light grade, protection pipe 40 mm bore GI pipe medium grade etc.(b) The quoted rates shall also deemed to include the cost of earth test point and earth strip/GIlead wire and protection pipe upto 7.5 meter beyond the earth plates electrode. |
| 14 | M&L in replacement of Cable jointing kit for 11 KV (Earthed) grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of 120 sqmm to 185 sqmm complete all as specified and directed by Engr-in-Charge. |
| 15 | Material and labour for painting to the both sides of fencing of the transformer/RMU by scraping the existing surface and applying a coat of synthetic enamel paint of the existing colour and complete all as specified and directed by Engr-in-Charge. |
| 16 | Calibration of all the electromagnetic/ thermal/ microprocessor relays of 11 KV VCB/RMU and setting the relay tripping timings in advance to the feeding sub station to ensure pock wise re-installation of various relays in position with complete testing and commissioning.Ensure proper functioning complete all as specified and directed by Engr-in-Charge.Note :-(a)Primary & secondary injection kit shall be arranged by the contractor (b) DC Supply for relay testing shall arranged by the contractor(c) The contractor shall prepare the relay adjustment and tripping timingchart in the follow up fashion and submit to Engineer-in-Charge |
| 17 | Material and labour for complete bush cutting vegetation around the substations/ transformers lines complete all as specified and directed by Engr-in-Charge. |
| 18 | Filtration/dehydration of 11 KV distrubution transformer oil through filtration plant to improve the dielectric strength/insulation valve of the transformer oil upto 60 KV at a gap of min 2.5 mm of electrodes complete all as specified and directed by Engr-in-Charge.NOTE :-(a) The contractor will take shut down orders in working before commencement of the work(b) The contractor shall ensure no wastage at transformer oil(c) The Contractor is solely responsible for any damage to the transformer during filtration operations. He is responsible for making good any damage to the transformer at his own cost without any extra cost to the department.(d) The contractor shall ensure that the conservator tanks are full to its level before starting the dehydration. Note : Oil for Top up will be measure and paid seperatly under respective items.(e) The di-electric strenght of oil shall be tested before & after filtration. Test results shall be submitted to Engineer-in-charge. |
| 19 | Material and labour for preparation of old painted surfaces of floor mounted indoor/outdoor type transformer from 200 KVA to 400 KVA capacity by cleaning/rubbing with course cloth wire brushes to remove dust deposits oil grease and repainting by applying one coat of spray paint with synthetic enamel paint of approved colour without disturbing/damaging the electrical net work system/equipment including making of capacity /rating /incoming outgoing details in capital english alphabet of size complete all as specified and directed by Engr-in-Charge. |
| 20 | All as per item No 19 above butfrom 500 KVA to 630KVA complete all as specified and directed by Engr-in-Charge. |
| 21 | Supply and fix in replacement of silica gel breather assembly complete with breather unit and silica gel including connecting with proper rubberised gasket and necessary fittings GI fittings for fixing/assembling upto 630KVA transformer complete by removing the unserviceable silica gel breather assembly complete all as specified and directed by Engr-in-Charge.Make : Patel Electrical Industries or equivalent recommende by OEM |
| 22 | Supply, filling and for topping up the transformer with new transformer oil duly filtered with filtration plant complete all as specified and directed by Engr-in-Charge. Note : (a) The transformer oil shall be type EHV confirming to IS - 335(2018)(b) Mineral oil grade shall be used.(c) The transformer oil should have a high dielectric strength not less than 60 KV at a gap of min 2.5 mm of electrodes. |
| 23 | Taking down burnt defective drawnout/inlet Valve (Brass anysize) and supply and fixing new drawn out/Inlet valve (brass as per existing size) suitable for any make of 200 to 400KVA Transformer complete all as specified and directed by Engr-in-Charge. |
| 24 | All as per item No 23 above butfrom 500 KVA to 630KVA complete all as specified and directed by Engr-in-Charge. |
| 25 | Taking down defective unserviceable LT bush porcelain insulator and supply and fix news LT bush porcelain insulator with oil sealfor transformer outdoor/indoor up to 400KVA complete all as specified and directed by Engr-in-Charge. |
| 26 | All as per item No 25 above butfrom 500 KVA to 630KVA complete all as specified and directed by Engr-in-Charge. |
| 27 | Taking down defective unserviceable HT bush porcelain insulator and supply and fix news HT bush porcelain insulator for transformer outdoor/indoor up to 400 KVA complete all as specified and directed by Engr-in-Charge. |
| 28 | All as per item No 27 above butfrom 500 KVA to 630KVA complete all as specified and directed by Engr-in-Charge. |
| 29 | Isolating the HT supply of transformer, disconnecting HT and LT connections of transformer by opening clamps, bus bar extension and isolating the cables from transformer, outdoor/Indoor of 200 to 630 KVA capacities, checking of transformer pressure release valve, oil condition and carrying out tests such as HV/LV megger test, ratio test, magnetic balance test, short circuit test including opening theinspection cover/top lid after drain out of oil as required to check the lead condition from winding to bus rods including necessary soldering/jointing etc, and charging of transformer and making all necessary connections / assembly & control circuits complete all as specified and directed by Engr-in-Charge.Note :- Test results shall be submitted through the Engineer-in-charge to Accepting Officer. |
| 30 | Lifting of transformer core of capacity 200 to 630 KVA and keeping the core inside oven chamber to removing of moisure and increasing of the insulation value of core and drying the core assembly for minimum 3 days at a temp of 120oC complete all as specified and directed by Engr-in-Charge.Note :- (a) Cost for lifting/lowering and transporting the core of transformer by crane is inclusive.(b) Labour for fixing the connection/removal of connection inside the heating chamber is inclusive. (c) Power consumption for heating core for improving insulation valueis inclusive. (d) Temperature 120oCto be maintained and inclusive in rate quoted. |
| 31 | Disconnecting defective out door/indoortransformers, 11KV/433 V of various capacities up to630 KVA from HT/LTsides taking down transformer oil completely, storing oil in suitable container (to be provided by the contractor), lifting the top cover and core assembly carefully and checking the conditions, refilling the transformer oil completely after necessary repairs, re-taking core assembly and fixing the top cover and painting to transformer complete all as specified and directed by Engr-in-Charge.Note : (a) Rewinding of transformer shall be measured and paid separately. (b) In case of major repairs/replacement in transformer, which can not be undertaken at site, the transformer shall be shifted to civil workshop and winding and connected accessories (complete transformer)(c) Dismantling of core and repairs shall be measured and paid separately.(d) Shifting of transformer shall be measured and paid separately. (e) Complete gaskets shall be replaced by the contractor rate deemed to be inclusive. |
| 32 | Taking down burnt defective high tension copper coil and supply and fix new HT copper coil made out of proper/ required as per the existing size copper wire enameled of high quality matching with the existing impedance and pre- insulation complete all as specified and directed by Engr-in-Charge.Note : (a) The cost of coil shall be inclusive of varnish sleeving of insulating material.(b) Cost of taking down the clamps, upper channels and core & HT links and re-clamp, positioning with separators, brazing etc completely shall be deemed to be included in the cost. |
| 33 | All as per above item no 32 but of LT copper coil complete all as specified and directed by Engr-in-Charge. |
| 34 | Taking down and opening of HT copper wound loose overheated coil from the limbs of transfomer of various capacities upto 630KVA, and rewinding the same by using the same copper wire after providing DPC and proper insulation etc into the coil of suitable turns etc complete all as specified and directed by Engr-in-Charge. |
| 35 | All as per Item No 34 above, but of LT copper wound complete all as specified and directed by Engr-in-Charge. |
| 36 | Taking down unserviceble tinned copper bus bar of various sizes from HT/LT side cable bushing rods from the transformer of capacities and supply and fix electrolyte tinned copper bus bar of suitable size and length including making holes as required at site to the transformer LT/HT side cable bushing rods complete all as specified and directed by Engr-in-Charge. |
| 37 | Taking down the Defective tap changer assembly, Supply and fixing of offload tap changer assembly suitable for any make upto630KVA transformer with 5 tapping position including opening top cover, conservator etcs complete all as specified and directed by Engr-in-Charge. |
| 38 | Opening of the RMU any size/way, 11 KV 400 to 800 Amps of any make by removing of the Breaker from the existing position after disconnecting all the connections from the system, servicing, Overhauling of the same, checking of the same for proper operation, spring charge, charged control cables are fastened tightly to the terminals, any abnormality, RMU, cleaning the surface of the insulators, fasten the bolts, checking and correctinginterrupting units, mechanism, linkages etc, fasten the hardwares of control wiring, check that the split pins, Circlips, dowell pins etc. have not come out and are intact, lubricate the mechanism, moving parts by castrol, all purpose grease or equivalent, check that the vaccum pots/chambersis within limit including opening of the shutters properly, replacing of the trip catch, roller, holding catch, stopper, close push button, closing cum reassembling, controll limit switches reconnecting of the breaker for smooth functioning complete all as specified and directed by Engr-in-Charge. |
| 39 | Supply, installation & commissioning and testing in replacement of DC power pack for RMU comprising 12 V and .7 AH Complete accessories required for commissioning is included in the scope of work complete all as specified and directed by Engr-in-Charge. |
| 40 | Repairing of DC High Voltage Test Set Capacitiesup to 70 Kv for repairs, servicing comprising the following and refixing the same, re-orientation and labour for taking down the defective parts and refixing the same spare parts complete all as specified and directed by Engr-in-Charge.Opening the DC High Voltage Test Set for repair and replacement of the following items Earth Leakage Relay With Core Balance Current TransformerPush Button Switch Element Red color Make:SchneiderTripping System for High voltage 10KV/30mAHigh voltage copper single core lead with Armour Silicon Carbide Schottky DiodesMulti span sequential Timer digital typePush Button Switch Element Green color.Make:SchneiderASPA DC array junction box DCDB 2 IN 1 OUT 500VLT On / Off Toggle Switch Element.Make:HoneywellHigh voltage test cableDigital multi-function meter with LCD displayKV Meter digital typeDigital ammeter LED display 230volt,50HzMake:SELECCalibration of the System with Calibration machine for earth fault and over current fault complete testing Top Cover |
| 41 | Repairing ofDC Battery Charger of Capacities 24 Volt DC, servicing comprising the following and refixing the same, re-orientation and labour for taking down the defective parts and refixing the same spare parts complete all as specified and directed by Engr-in-Charge.Opening the DC 24 Vbattery Chargerfor repair and replacement of the following items Volt meter and Ampere MeterWiringDiode circuitRelayControl TransfomerRotary Switch |
| 42 | Labour and T & P for disconnection of LT panel of any size andUplifting the same0.45 Mtr from ground level including makingPCC (1:3:6) work for foundation and excavation earth work for loop complete all as specified and directed by Engr-in-Charge. |
| 43 | Supplying and laying of synthetic Rubber insulated mats 2 mm thick for voltage upto 3.3 kv for electrical purpose as per IS 15652-2006, (superseding IS 5424) suitable for electrical shock safety of sizes 2m x 1m complete all as specified and directed by Engr-in-Charge. |
| 44 | M&L for repairing / Plastering of Transformer platform of size 2.2m x 2.2m x 1 m height built in CM 1:4including 20mm graded stone aggregate over the plinth along with provn of stair case on one side complete all as specified and directed by Engr-in-Charge. |
| 45 | Material and labour in replacment for installation, testing & commissioning of waterless and maintanance free Gel earthing (C C M compound), with BFC-50 kg jam fill compound along with 50 mm dia Cu bonded MS rod of length 3.00 Mtr below ground level including duly augering in ground pre cast or in situ cast in high purity electrically conductive granutar material having ultra low resistive value to acieve resistance below 2 Ohms connected with 25 mmx3mm Copper strip complete all as specified and directed by Engr-in-Charge. |
| 46 | Supply Only of silica gel complete by removing the unserviceable silica gel complete all as specified and directed by Engr-in-Charge. |
| 47 | M&L in replacement mild steel chequered plate 10 mm thick incliding cutting of suitable size for duct cover at site complete all as specified and directed by Engr-in-Charge. |
| 48 | M&L for Sticking of ready made sticker with letters, figures clearly mention, Name , SM No,in red colour ofsize for HT VCB , RMU, Step down transformer 0.6M x 0.2 M size complete all as specified and directed by Engr-in-Charge. |
| 49 | M&L for cement painting with prepared white ( snow sem ) for transformer plinth area of any size complete all as specified and directed by Engr-in-Charge including scrapping & cleaning with wire brush. |
| 50 | Material and Labour for complete removal of Stone aggregates and removing of sand mud, Debris / weeds and plants from the aggregate and relaying at the removed place complete all as specified and directed by Engr-in-Charge. |
| 51 | S & F in replacement battery 12V, DC, 100 AH maintnance free dry battery complete all as specified and directed by Engr-in-Charge. |
| 52 | Supply, Laying, connecting, testing and commissioning in replacement ( including taking out existingcable) LT cable of PVC sheathed XLPE cable armoured aluminiumconductor 1100 V graded after taking out/down old existing old vintage cables from trenches / ducts/ road crossing/wall and poles complete all as specified and directed by Engr-in-Charge of following size :- |
| 53 | 3.5 core, 50 sqmm |
| 54 | 3.5 core, 35 sqmm |
| 55 | 3.5 core, 25 sqmm |
| 56 | 4 core, 16 sqmm |
| 57 | 4 core, 10 sqmm |
| 58 | Material and Labour for excavation in trenches in soft and loose soil n.exc 1.5 mtr wide and n.exc. 1.5 mtr depth for laying and taking out of electric power cable and getting out complete all as specified and directed by Engr-in-Charge. |
| 59 | Material and Labour for returning filling in including spreading leveling watering and well ramming in layers not exceeding 25 cm thick complete all as specified and directed by Engr-in-Charge. |
| 60 | Material and Labour for removing excavated material not exceeding 50 mtr away and depositing where directed at a level n. exc 1.5 mtr above thestarting point complete all as specified and directed by Engr-in-Charge. |
| 61 | Material & labour for river washed and screened dry sand for filling under and above the under ground cable for cushioning of cables etc complete all as specified anddirected by Engr –in-charge.Note : Measurement shall be taken after punning down. |
| 62 | Laying only old LT cable cover obtained from excavation complete all as specified and directed by Engr-in-Charge. |
| 63 | Supply & Laying in replacement of reinforcement precast cable cover class LV Type-1 Flat size 250x150x40mm laid in trenches for cable protection etc complete all as specified and directed by Engr-in-Charge. |
| 64 | Material and Labour for boring of holes under road/pavement/hard standingincluding material and labour for HDPE pipe of 80/100mm dia suitable for 04 Kg/cm working pressure. Wall thickness of pipe not less than 6.5 mm complete all as specified and directed by Engr-in-Charge. |
| 65 | Material and Labour in replacement for service cable 6 Sqmm 2 core 1100 volts grade heavy duty cable PVC insulated stranded alumn conductor, served with an inner sheathing of PVC tape and overall PVC sheathed in service connections/perimeter light supply as per site requirement, flat or circular complete all as specified and directed by Engr-in-Charge. |
| 66 | Material and labour for PCC 1:2:4 type B-1, (using 20 mm graded crushed stone aggregate) for Coping (Size: LxWxH-0.45Mx0.45Mx0.45M) etc complete all as specified and directed by Engr-in-Charge. |
| 67 | Takingout old post lamp lantern light fitting and supply and fixing of new generation energy saving and environment friendly long life verasalite pressure LEDs of 70 Watts capacity as light source and exclusively designed for poly carbonate cover with electronic drive.complete all Accessories complete all as specified and directed by Engr-in-Charge. |
| 68 | Supply & installing in replacement old rusted /damage steel tubular swan neck swaged poles type 410 SP-31 (9 mtr long) of approx wt.147 kg conforming to IS 2713 (Part-II)includingbase plate,GI pipe for cable protection etc.complete all as per manufacturer\"s instructions and as specified and as directed by E-in-charge. NOTE:- 1.The unit rate in this item is deemed to be included the cost of ,PCC foundation 1:4:8 type D-2 , PCC coping 1:2:4 type B-1 as in steel tubular pole . The steel pole shall be painted by bituminous paint total length inside and up to planting depth outside and remaining portion of pole painted with two coat of aluminum paint over a coat of red oxide complete all as specified and directed by Engr-in-Charge2. Excavation, earth work will measured and paid separately under relevant item. |
| 69 | Material and labour for Laying, connecting, testing and commissioning only existingLT XLPE cable of PVC sheathed XLPE cable armoured aluminiumconductor 1100 V graded of size10 Sqmm to 95 Sqmm complete all as specified and directed by the Engg-in-Charge.Note :- The Quoted rate shall be deemed to be inclusive of Excavation Earth Work, returning filling and associated items. |
| 70 | Material and labour for Cutting / pruning of tree branches along security light pole around 2 mtr radius of security light and removing from site including arrangement of T&P (Axe, rope & ladder etc)complete all as specified and directed by Engr-in-Charge. |
| 71 | Supplying and fixing in replacement MCB SPN 40 to 63 Amps,50 Hz,10 KA,240 Volts complete all as specified and directed by Engr-in-Charge. |
| 72 | Supplying and fixing in replacement MCB SP, 6 to 32 Amps, 50 Hz, 10 KA, 240 Volts complete all as specified and directed by Engr-in-Charge. |
| 73 | Supplying and fixing in replacement KIOSK box weather proof including made out of one piece mounted SMC base and door pole mounted hinged door size 333x233x120mm out side and 300x200x105mm inside dimensions comprising of aluminum bus bar 4 strips for 3 phase and neutral 63 Amps including embossing/painting of danger notice of size not less than 10cm x 7.5cm with letters, figures and conventional skull and bones in signal red color on front face of KIOSK box body complete all as specified and directed by Engr-in-Charge including MS clamp of size 25x3 mm with suitable size nut, bolts & washer. |
| 74 | M&L for re-painting of LT Steel tubular poles of any sizes with apply of 2 coats of aluminum paint including rubbing with wire brush/emery paper & writing pole Nos in appropriate size of letters including making yellow and black strips upto height of 1.5 mtr above from ground level complete all as specified and directed by Engr-in-Charge. |
| 75 | Supply, drawing, connecting and testing of 3 core, 1.5 Sqmm PVC insulated and PVC round sheathed copper conductor (flexible ) industrial cable, 1100 Volts conforming to IS 694 in steel tubular poles from KIOSK box to street light fitting including providing suitable copper lugs complete all as specified and directed by Engr-in-Charge. |
| 76 | All as per Item No. 70 above but size of cable 3 core, 2.5 Sqmm complete all as specified and directed by Engr-in-Charge. |
| 77 | Supply and fixing in replacement of LED street light fitting 90 Watt 230 V AC outdoor type with high pressure die cast aluminum hosing and heat resistant complete with driver, lamp bracket with impact and corrosion resistant including thermal management in multiple optics complete with IP 65/66 protection complete all as specified and directed by Engr-in-Charge. |
| 78 | All as per Item No. 72 above but70/75 WATT complete all as specified and directed by Engr-in-Charge. |
| 79 | All as per Item No. 72 above but 120/125 WATT complete all as specified and directed by Engr-in-Charge. |
| 80 | Supply and fixing in replacement of Energy saving, environmental friendly, long life, exclusive innovative die-cast aluminum IP66 LED flood light suitable for high lighting architectural façade and general purpose lighting of capacity 200/210 Watt LED complete all as specified and directed by Engr-in-Charge. |
| 81 | Taking down carefully from poles defective street light fitting 70 wattfor repairs and refixing the same after replacing defective accessories like driver, & PVC insulated sheathed copper conductor etc. complete & testing to entire satisfaction of Engr-in-Charge, complete all as specified and directed by Engr-in-Charge.Note : - (i) Accessories likedriver suitable for LED light of specified size& PVC copper wire of different sizeshall be measured and paid separately.(ii) Quoted rate deemed to be included all Machinery, ladder, Tools & Plants needed for the necessary repair work of street/flood light. |
| 82 | All as per Item No. 76 above but Street Light of cap 90 watt complete all as specified and directed by Engr-in-Charge. |
| 83 | All as per Item No. 76 above but Street Light of cap 120/125 watt complete all as specified and directed by Engr-in-Charge. |
| 84 | All as per Item No. 76 above but flood Light of cap 190/200 watt complete all as specified and directed by Engr-in-Charge. |
| 85 | All as per Item No. 76 above but flood lights of 200 watt complete all as specified and directed by Engr-in-Charge. |
| 86 | Supply only compact LED electronic driver suitable to operate on voltage 150 to 277 volt 50/60 Hz AC supply of cap 70 watts complete all as specified and directed by Engr-in-Charge. |
| 87 | All as per Item No. 81 above but cap of 90 watt complete all as specified and directed by Engr-in-Charge. |
| 88 | All as per Item No. 81 above but cap of 120/125 watt complete all as specified and directed by Engr-in-Charge. |
| 89 | All as per Item No. 81 above but cap of 190/200 watt complete all as specified and directed by Engr-in-Charge. |
| 90 | All as per Item No. 81 above but flood lights of cap 190/200 watt complete all as specified and directed by Engr-in-Charge. |
| 91 | Supply only LED tempered glass suitable of cap 70 watts complete all as specified and directed by Engr-in-Charge. |
| 92 | All as per Item No. 86 above but cap of 90 watt complete all as specified and directed by Engr-in-Charge. |
| 93 | All as per Item No. 86 above but cap of 120/125 watt complete all as specified and directed by Engr-in-Charge. |
| 94 | All as per Item No. 86 above but cap of 190/200 watt complete all as specified and directed by Engr-in-Charge. |
| 95 | All as per Item No. 86 above but flood lights of cap 190/200 watt complete all as specified and directed by Engr-in-Charge. |
| 96 | Supply only compact LED blub set suitable to operate on voltage 150 to 277 volt 50/60 Hz AC supply of cap 70 watts complete all as specified and directed by Engr-in-Charge. |
| 97 | All as per Item No. 91 above but cap of 90 watt complete all as specified and directed by Engr-in-Charge. |
| 98 | All as per Item No. 91 above but cap of 120/125 watt complete all as specified and directed by Engr-in-Charge. |
| 99 | All as per Item No. 91 above but cap of 190/200 watt complete all as specified and directed by Engr-in-Charge. |
| 100 | All as per Item No. 91 above but flood lights of cap 190/200 watt complete all as specified and directed by Engr-in-Charge. |
| 101 | Supply only compact LED FMSPD suitable to operate on voltage 150 to 277 volt 50/60 Hz AC supply of cap 70 watts complete all as specified and directed by Engr-in-Charge. |
| 102 | All as per Item No. 96 above but cap of 90 watt complete all as specified and directed by Engr-in-Charge. |
| 103 | All as per Item No. 96 above but cap of 120/125 watt complete all as specified and directed by Engr-in-Charge. |
| 104 | All as per Item No. 96 above but cap of 190/200 watt complete all as specified and directed by Engr-in-Charge. |
| 105 | All as per Item No. 96 above but flood lights of cap 190/200 watt complete all as specified and directed by Engr-in-Charge. |
| 106 | S&F in replacement of contactor 3 Pole power contractor, type MNX 25/32 415 volt having 2 NO +2 NC contacts complete all as specified and directed by Engr-in-Charge. |
| 107 | S&F in replacement ofcontactor 3 Pole power contractor, type MNX 12/18 415 volt having 2 NO +2 NC contacts complete all as specified and directed by Engr-in-Charge. |
| 108 | S&F in replacement of MCB 3 pole, 32Amps, 50 Hz, 415 Volts, 16 KA, with thermal magnetic release complete all as specified and directed by Engr-in-Charge. |
| 109 | S&F in replacement of Analog Time switch , 240 Volt AC , 50 Hz complete all as specified and directed by Engr-in-Charge. |
| 110 | S&F in replacement of Digital Time switch , 240 Volt AC , 50 Hz complete all as specified and directed by Engr-in-Charge.NOTE:-Contractor will make a identity (i.e.CA No. & firm name) using permanent paint marker pen on each component which will be replaced under repair of street light and he will be liable to change his new replaced item without any extra cost which become unserviceable due to any reason during execution period of CA and further up to defect liability period. It will be contractor responsibility to take the location of unserviceable street light fitting by MES rep at 9 AM at power house in every working day. |
| 111 | M & L for PCC 1:3:6 type B0 using 12.5 mm graded stone aggregate forof pole complete all as specified and directed by Engr-in-Charge. |
| 112 | M&L for PCC 1:4:8 type D2 using 40 mm graded stone aggregate for pole foundation Beddingcomplete all as specified and directed by Engr-in-Charge. |
| 113 | M&L Plain cement concrete 1:2:4 type B-1 using 20mm graded stone aggregates for pole foundation of pole complete all as specified and directed by Engr-in-Charge. |
| 114 | M&L for disconnecting all electric LT Supply from timer panel of 15 mtr height High mast and lowering down the high mast light fitting set by using motor/manually for repair/replacement work and change the unsv/worn out partsafter repair works completed check the serviceability of high mastand remove all dust/nest and greasing the rope/motor/gear assembly for proper functioningbefore raising up in the the original position complete all as specified and directed by Engr-in-Charge.Note:Quoted rate shall deemed to be included all Hydra Lifting Machinery vehicle ,Tools & Plants needed for the necessary repair work of Himast light. |
| 115 | Supply only stainless steel rope 6mm dia complete all as specified and directed by Engr-in-Charge. |
| 116 | Supply only D clamp including nut bolt and washers complete all as specified and directed by Engr-in-Charge. |
| 117 | Supply only 6 Sqmm 5 Core flexible copper cable complete all as specified and directed by Engr-in-Charge. |
| 118 | Supply only 1.5 HP motor 3 Ph 440 volt50 hz AC supply for operating the stainless steel rope through gear assembly complete all as specified and directed by Engr-in-Charge. |
| 119 | Supply only gear assembly used for operating the stainless rope for lowering down the high mast fitting complete all as specified and directed by Engr-in-Charge. |
| 120 | Supply, installation, testing and commissioning in replacement of factory made (CPRI Approved) outdoor type Timer Panel board, cubical platform mounted , suitable for 415Volts ,3Phase,4Wire 50Hz, AC supply system. The panel shall be dust and vermin proof IP-65 class protection and shall be mae of 3.15mm CRCA MS sheet and minimum 32x32x5mm thick MS angle iron frame work,powder coated finishes over one coat of red oxide primer on noutside surface and painted insidewith two coats of red oxide primer ,fronyt opening, type, cosing locking arrangement including power wiring with 10 sqmm PVCinsulatedsolid copper conductor and comprising of the following complete all as specified and directed by Engr-in-Charge :-(a) MCCB 4 pole 415 V breaking cap 16 KA , current rating 40 Amps.- 01 No (b) Digital Timer switch 240Volt,AC,50Hz -01No(c) 3 pole power contactor type MNX 25 having 2NO+2NC Contact -01No(d) Auto/manual selector switch -01No(e) Solid state LED indiction lamps RYB |
| 121 | Supply, installation, testing and commissioning in replacementfactory made (CPRI Approved) outdoor type Timer Panel board, cubical platform mounted , suitable for 415Volts ,3Phase,4Wire 50Hz, AC supply system.The panel shall be dust and vermin proof IP-65 class protection and shall be mae of 3.15mm CRCA MS sheet and minimum 32x32x5mm thick MS angle iron frame work,powder coated finishes over one coat of red oxide primer on noutside surface and painted insidewith two coats of red oxide primer ,fronyt opening, type, cosing locking arrangement including power wiring with 10 sqmm PVCinsulatedsolid copper conductor and comprising of the following complete all as specified and directed by Engr-in-Charge :-(a) MCCB 4 pole 415 V breaking cap 16 KA , current rating 63 Amps.- 01 No (b) MCB 4 pole 415 V breaking cap 16 KA , current rating 32 Amps.- 03 Nos(c) Digital Timer switch 240Volt,AC,50Hz -01No(d) 3 pole power contactor type MNX 25 having 2NO+2NC Contact -01No(e) Auto/manual selector switch -01No(g)Solid state LED indiction lamps RYB |
| 122 | Note : Contractor should procure and provide 50 % of the material as listed above within 15 days of the placing of work orderand shall be verified by the Engr-in-charge. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail