| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads upto 2.00 km., transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. including all labour, material, T&P etc complete but excluding GST. |
| 2 | Providing & laying of inverted filter of sand gravel placed under neath boulder pitching including all material labour T&P, etc. required for proper completion of work including cost of material, labour, labour cess, T&P and other taxes complete as per direction of Engineer- in- charge.excluding GST. including all labour, material, T&P etc complete but excluding GST. |
| 3 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. including all labour, material, T&P etc complete but excluding GST. |
| 4 | Applying primer coat over surface including preparing the surface by thoroughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes fine steel/wood scrappers sand paparing and knotting including coat all and supply of all materials , labour and T&P etc requried for proper completion of the work. including all labour, material, T&P etc complete but excluding GST. |
| 5 | Finishing wall with two coat of water proof cement paint Weather coat of approved quality on previously new surface with this paint to give an even shade including of all supply of all materials , labour and T&P etc requried for proper completion of the work. including all material, labour, labour cess, T&P etc complete but excluding GST. S.I. No. 8+10 |
| 6 | Plain Cement Concrete (M-15) in Open Foundation complete as per Drawing and Technical Specifications. including all labour, material, T&P etc complete but excluding GST. |
| 7 | Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical Specification including all labour, material, T&P etc complete but excluding GST. |
| 8 | Sealing of crack with Epoxy Grout by injection through nipples Grunting complete as per clause 2803.1. including all labour, material, T&P etc complete but excluding GST. |
| 9 | Providing and erecting a \"W\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 including all labour, material, T&P etc complete but excluding GST. |
| 10 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 including all labour, material, T&P etc complete but excluding GST. |
| 11 | Supply & Fixing 80 mm thick Precast cement concrete I-Shape interlocking paver block a with top layer of minimum 8mm thickness having plan dimension 200x(160+120mm) of O.P. cement, Smooth high gloss finish, skid reditant. manufactured from rubber moulds through vibro-compression machanism. The compressive strength of concrere paver block shall not be less than 30MPA (M-30) and wight 5kg per no confirming to IS; 15658-2006 with a 4 cm thick layer of fine sand including cost of material,labour, T & P TAXES etc requried for proper completion of the work as directed by Enginner- in-charge. including all labour, material, T&P etc complete but excluding GST. |
| 12 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. including all labour, material, T&P etc complete but excluding GST. |
| 13 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. including all labour, material, T&P etc complete but excluding GST. |
| 14 | Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications including all labour, material, T&P etc complete but excluding GST. |
| 15 | Plain/Reinforced Cement Concrete (1:2:4) in Open Foundation complete as per Drawing and Technical Specifications. including all labour, material, T&P etc complete but excluding GST. |
| 16 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications including all labour, material, T&P etc complete but excluding GST. Please Enable Macros to View BoQ information |