| 1 | Cleaning the vegetation growth over the boundary for 5m width for execution of the work, collecting, conveying the debris to a far off place etc,.complete. |
| 2 | Earthwork excavation in hard soil for laying foundation concrete including necessary lead and lift for conveying the excess earth to far away from the monument premises etc., complete |
| 3 | Sand Filling below the foundation concrete with good quality of river sand free from foreign matters, watering, consolidating properly, etc complete. ( Allowed for estimate purpose only, to be taken up after site study/ inspection of GO) |
| 4 | Laying Plain cement Concrete using 40mm stone jelly in ration 1:3:6, properly consolidating, curing etc., complete |
| 5 | Construction of random rubble stone masonry footings / dwarf wall with new RR stones and cement mortar 1:6, curing etc., complete. |
| 6 | Construction of dwarf wall above ground level with Coarse Rubble Masonry (First Sort) with new stones in cement mortar 1:6 curing etc., complete |
| 7 | Making, supplying and fixing of MS grill fencing by using with MS L angle 50x50x6mm as horizontal and vertical section end to end and the horizontal section of post 50x6mm MS flat and equal interval of 16mm dia MS round rods in vertical section each 10cm to 10cm and fixing the round emblem of ASI logo in the middle of the MS grills including fabricating, bending, welding charges and other fixing charges and applying painting etc complete. |
| 8 | Providing Coping above the dwarf Wall with Plain Cement Concrete 1:3:6 using 20mm stone jelly including curing etc., complete |
| 9 | Pointing the stone joints with cement mortar 1:3, curing, colour matching, etc.complete |
| 10 | Making, supplying and fixing of MS grill Gate by using with MS L angle 50x50x6mm as horizontal and vertical section end to end and the horizontal section of post 50x6mm MS flat and equal interval of 12mm square MS rods in vertical section each 10cm to 10cm and fixing the round emblem of ASI logo in the middle of the MS grills including fabricating, bending, welding charges and other fixing charges and applying painting etc complete. |
| 11 | Painting the surface with two coats of enamel paint including cost of all materials and labour cost etc., complete |
| 12 | Providing Brick jelly concrete in pure lime for a thickness of 100 mm as base concrete for laying stone flooring including material and labour charges etc., complete. |
| 13 | Providing stone flooring with new granite stone flooring slabs of two line dressing set in lime mortar 1:1.5 and pointing the same with lime mortar 1:2 including material and labour charges etc., complete. |
| 14 | Providing kerb stone at entrance pathway to the main temple by using 0.60m to 1.20m length and 0.45m height, 100mm thickness of granite stone slab for providing kerb including cost of all materials, labour charges and other fixing charges etc. |