| 1 | Part A:Installation of 11 X Dip 1200mm complete belt conveyor for a length of 90 metre at CM 4 Panel 11 |
| 2 | Transportation of one 6.6KV VCB, DOL HT Starter from 8L/1D to 47Dip/-3L after loading it on MUV then unloading and placing manually on platform |
| 3 | Transportation of 500 mtr., 6.6KV grade 120 Sq.mm armoured cable from surface to cm panel with the help of MUV and laying and hanging it at underground |
| 4 | Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc. to CM panel with the help of MUV |
| 5 | Transportation and installation of Discharge Unit Complete with Cleaner at CM panel with the help of MUV |
| 6 | Transportation and installation of Loop Take-up Unit Complete with fencing at CM panel with the help of MUV |
| 7 | Transportation and installation of Tail-end Unit Complete at CM panel 6 with the help of MUV |
| 8 | Transportation and installation of 90 mtr. of belt structure, after loading it on MUV at CM panel (weight of 1200mm structures is 0.085 Te/mtr. ) |
| 9 | Transporting, laying, lapping & jointing of 200 mtr. of belting (20 mtr. belt in loop ) |
| 10 | Laying of Sequence cable(100m), pull cord, lockout cable and audio cable throughout the belt line of 90 metre. Fitting of pull chord switches and communication devices along the belt. |
| 11 | Supply of M.S. Nut & Bolt 5/8x2\" |
| 12 | Supply of G.I. wire 8 SWG |
| 13 | Supply of Bobin insulator |
| 14 | Supply of M.S. Nut & Bolt 3/8\"\"x 3\" with washer |
| 15 | Civil foundation work for drive head, discharge, loop takeup and platform |
| 16 | Part B. Installation of 1200mm wide PVC belt conveyor structure ( 11 X Dip) for a length of 610 mtr. i.e total 13 pillar in R-V seam of CM-4 section at MIC, Jhanjra Project Colliery. |
| 17 | Transportation and Installation of 610mtr. of belt structure, after loading it on MUV from surface(weight of 1200mm structures is 0.085MT/mtr.) |
| 18 | Transporting, laying, lapping & jointing of 1220 mtr. of belting (0.9*194*1220) |
| 19 | Shifting and installation of tail end for every shifting( 13 times extension ) (wt = 1*13 Te=13Te) |
| 20 | Laying of pull chord, lockout cable and audio cable throughout thebelt line of 610 metre. Fitting of pull chord switches andcommunication devices along the belt. |
| 21 | Supply of M.S. Nut & Bolt (M16x40) |
| 22 | Supply of Bobin insulator |
| 23 | Supply of M.S. Nut & Bolt 3/8\"\"x 3\" with washer |
| 24 | Supply of G.I wire 8 SWG |
| 25 | Part C. Installation of 11 X Dip Tandem belt of 1200mm complete belt conveyor for a length of 90 metre at CM 4 Panel 11 |
| 26 | Transportation of one 6.6KV, DOL HT Starter from 8L/1D to 7Dip/-3L after loading it on MUV then unloading and placing manually on platform |
| 27 | Transportation of 500 mtr., 6.6KV grade 120 Sq.mm armoured cable from surface to cm panel with the help of MUV and laying and hanging it at underground |
| 28 | Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc. to CM panel with the help of MUV |
| 29 | Transportation and installation of Discharge Unit Complete with Cleaner at CM panel with the help of MUV |
| 30 | Transportation and installation of Loop Take-up Unit Complete with fencing at CM panel with the help of MUV |
| 31 | Transportation and installation of Tail-end Unit Complete at CM panel 6 with the help of MUV |
| 32 | Transportation and installation of 90 mtr. of belt structure, after loading it on MUV at CM panel (weight of 1200mm structures is 0.085 Te/mtr. ) |
| 33 | Transporting, laying, lapping & jointing of 200 mtr. of belting (20 mtr. belt in loop ) |
| 34 | Laying of Sequence cable(100m), pull cord, lockout cable and audio cable throughout the belt line of 90 metre. Fitting of pull chord switches and communication devices along the belt. |
| 35 | Supply of M.S. Nut & Bolt 5/8x2\" |
| 36 | Supply of G.I. wire 8 SWG |
| 37 | Supply of Bobin insulator |
| 38 | Supply of M.S. Nut & Bolt 3/8\"\"x 3\" with washer |
| 39 | Civil foundation work for drive head, discharge, loop takeup and platform |
| 40 | Part D: Installation of 1200mm wide PVC belt conveyor structure ( 11 X Dip Tandem) for a length of 450 mtr. i.e total 10 pillar in R-V seam of CM-4 section at MIC |
| 41 | Transportation and Installation of 450mtr. of belt structure, after loading it on MUV from surface(weight of 1200mm structures is 0.085MT/mtr.) |
| 42 | Transporting, laying, lapping & jointing of 900 mtr. of belting |
| 43 | Shifting and installation of tail end for every shifting(10 times extension )(wt = 1*10 Te=10Te) |
| 44 | Laying of pull chord, lockout cable and audio cable throughout the belt line of 450 metre. Fitting of pull chord switches and communication devices along the belt. |
| 45 | Supply of M.S. Nut & Bolt (M16x40) |
| 46 | Supply of Bobin insulator |
| 47 | Supply of M.S. Nut & Bolt 3/8\"\"x 3\" with washer |
| 48 | Supply of G.I wire 8 SWG |
| 49 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |