| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 3 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 5 | All kinds of soil. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 7 | 1:4:8 (1 Cement : 4 Pulverised sand (zone-III) derived from natura sources : 8 graded stone aggregate 40 mm nominal sizederived from natura sources) |
| 8 | 1:3:6 (1 Cement : 3 Pulverised sand (zone-III) derived from natura sources : 6 graded stone aggregate 20 mm nominal sizederived from natura sources) |
| 9 | 1:2:4 (1 Cement : 2 Pulverised sand (zone-III) derived from natura sources : 4 graded stone aggregate 20 mm nominal sizederived from natura sources) |
| 10 | Providing, hcisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in stringcourses, bands, copings, bed plates, anchor blocks, plainwindow sills and the like, including the cost of requiredcentering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement 1.5 coarse sand (zone-III) derivedfromnatural sources : 3 graded stone aggregate 20 mmnominal size derived from natural sources). |
| 11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 12 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 14 | Foundations, footings, bases of columns, etc. for mass concrete |
| 15 | 12mm Cement Plaster of mix: |
| 16 | 1:4 (1 Cement :4 Fine Sand) |
| 17 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. |
| 18 | 40 mm thick with 20 mm nominal size stone aggregate |
| 19 | Extra for making chequers of approved pattern on cement concrete floors, steps, landing, pavements etc. |
| 20 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |