| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(Cement Concret/ Brick)..(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 2 | Earthwork in excavation for foundation of structure as per drawings and technical specification, including setting out, construction of shoring and bracing, removal of sumps and other deleterious matter, dress of sides and bottom backfilling with approved material.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 3 | Sand Filling in foundation trenches as per drawing and technical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 4 | PCC Grade M-15 in open Foundation complete as per drawing and Technical specifications..(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 5 | Furnishing and Placing M-25 RCC in super-structure as per drawing and technical specification..(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 6 | Providing weep holes in brick masonry/ Plain/Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1:20 (V:H) towards drawing force. Complete as per drawing and technical specifcations..(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 7 | Back filling sandy material behind abutment, wing wall and return wall complete as per drawing and technical specification..(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 8 | Drainage Spouts complete as per drawing and tehnical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 9 | Supply fitting and placing HYSD Bar reinforcement in super structure complete as per drawing and technical specifications.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 10 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 11 | Providing, laying, spreading and compacting stone aggregates of specific sizes (45-63mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-2 as per Technical Specification Clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 12 | Providing, laying, spreading and compacting of sukrut stone aggregates of specific sizes (22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 13 | Brick edging on both side of road with first class brick 8cm (3”) wide 12cm (4.50”) deep laid with mud mortar including all materials, lab our, T&P etc. complete. As per SOR Varanasi-2020 Si No-765(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 14 | Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means as per Technical Specification Clause 502.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 15 | Providing and applying tack coat with Bitumen (VG-10) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503/5.2(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 16 | Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen V.G.-10 @ 1.46 kg. per sqm. to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity. finished to required level and grades Bitumen (S-90) to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 522/510.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 17 | Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 75 tonne/hours using crushed stone chipping 6.7mm size and penetration bitumen of suitable grade Type C as per Technical Specification Clause 513/5.12(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 18 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 19 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 20 | Construction of Subgrade and Earthen ShouldersConstruction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical Specification Clause As per MORD 303.1(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) Please Enable Macros to View BoQ information |