|
| 1 | \"M&L for seven stage cleaning and sterilizationinside theexisting RCCUG Sump of following capacitythrough bacteriological treatmentby using E-in-C\"s Branch approved chemical as recommended by Engineer-in-Charge and ULTRA VIOLET R at following pump houses at any height (as per site requirement) , including suitablestaging Seven stage are as under follows:-(a)First stage is to drain outthe waterby using high capacity pump of dewatering system. (b) Second stage is cleaning all the algae formation inside the tank by using E-in-C\"s Branch approved chemical as recommended by Engineer-in-Charge (c) Third stage is scrubbing the walls and floor with mechanized scrubber & fresh water cleaning by high speed jet pump (rotary & flat) to remove all scaling, algae and other formed particles on internal surfaces of the tank completely.(d) Fourth stage and first bacteria screening is de-germification by using E-in-C\"s Branch approved chemical as recommended by Engineer-in-Charge.(e)Fifth stage is cleaning the floor of the water tank by heavy duty industrial vacuum cleaner and sludge sucker having maximum 1200W with suitable heavy duty rugged motor to free of any foreign and loose particles of any nature. (f) Sixth stage is the second bacteria screening and sterilizingmethod by using ultravioletrayby heavy duty UV radiationwhich shall have 360 degree of sterilization with in the tank to kill all suspended bacteria (The radiation shall portable and effective for sterilization of drinking water tanks for dimination of floating and suspended bacteria.)(g) Seventh stage of cleaning and third bacteria screening is to sterilize the floor and wall of the water tank by using laboratory certified branded strong oxidizing agent TERBAC G65 of M/S Ray\"s clean tech or equivalent any not-toxic bio-degradable eco-friendly anti-bacterialagentcertified by a Govt. approved laboratory to disinfect the over head tank from all harmfulpathogens. |
| 2 | (h)Cleaning of external surfaces, lid wallof the tank ,structure for all scales and other particles any algae, hivesand any type of vegetationor any other unwanted matters , scraping of old paint and painting with two coats of cement based water proof apex paint complete all as directed.(j)A sticker of appropriate size & colour as directed by Engr-in-Charge and of non degradable material with printed details as under (i) CA No(ii) Name of applicant (iii) Name of contractor(iv)columns for date of cleaning and expiry date will be written or printed on the sticker by permanent marking ink. (k)Painting of angle iron ladder for OHT after scrapping of old paint byemory paper or any other means with two coat of enamelled black paint over a coat of red oxide primer including arrangement ofscrap folding/ bamboo structure required for entire work.(l) Painting of raising main, distribution, wash out and overflow pipes on over head tank with suitable colour coding.(m) Suitably blocking the incomming and outgoing wash out pipes for avoiding mud and foreign meterials deposited in the OH reservoirs getting into pipes and chocking it prior to starting the cleaning(n) Filling up the over head reseviors full and feed the affected residential/OTM consumers enough water to sustain during the resevior cleaning period.(O) Fresh air to be blown into the tank for a period before allowing a person to enter. The cleaner should wear protective clothing, including gloves, a boots,Safety Helmet and glasses. Contractor should make sure someone remains outside the tank, next to the access hatch all the time in case the cleaner has an accident. The availability of gas masks and portable ventilators would be made available by the contractor at site during cleaning operationNote :-(i)Remove the blockage from inlet/ outlet over flow pipes and ensure satisfactory distribution.Note :- All safety equipments required and necessary insurance for safety of working labourto execute the work is responsible of the contractor. |
| 3 | Under Ground sump of capacity 1,50,000.00 gallons at Ghorpadi Pump House No.1 |
| 4 | Underground sump of 25,000 glns capacity at 64 Pump House and SCSR comminication complex Pump House. |
| 5 | Underground sump of 20,000 glns capacityatVictoria Pump House, CESC Pump House, Nirman Vihar Pump House, MES Key personnel Pump House, Commnd MT Pump House, SCOM Pump House and Sainik Aramgrah pump House. |
| 6 | Underground sump of 10,000 glns capacityat CEPZ Pump House, Ashoka Marg Swimming pool |
| 7 | Underground sump of 5,000 glns capacityat PCDA office Pump House, 2 Arjun Marg, Race cource, Comd House and 14 Queen Garden |
| 8 | All as per serial item no 1.00 above but for Water storage tank of 50,000 glns capacity at64 Pump House, Victoria Road Pump House, Ghorpadi Pump House No 2, DAD Complex Pump House, Children School Pump House, Milkha Singh Pump House, Manoj Pandey Pump House, Old KG line New Pump House, SCOM House, Ashoka marg Pump House. |
| 9 | All as per serial item no 1.00 above but forwater storage tankof 40,000 glns capacity at 64 Pump House and Victoria Road Pump House |
| 10 | All as per serial item no 1.00 above but forwater storage tank of 30,000 glns capacityat 16 Queens Garden Pump House, HQ SC Pump House, Shanti Vihar Pump House, Ashoka marg Pump House, 64 Pump House |
| 11 | M&L for seven stage cleaning and sterilizationinside theexisting RCCoverhead tank of capacity60000 gallon at Milka Singh Pump House and Old KG line Pump House through bacteriological treatmentby using E-in-C\"s Branch approved chemical as recommended by Engineer-in-Charge and ULTRA VIOLET R at Pump House No-03 at any height (as per site requirement) , including suitablestaging Seven stage are as under follows:-(a)First stage is to drain outthe waterby using high capacity pump of dewatering system. (b) Second stage is cleaning all the algae formation inside the tank by using E-in-C\"s Branch approved chemical as recommended by Engineer-in-Charge (c) Third stage is scrubbing the walls and floor with mechanized scrubber & fresh water cleaning by high speed jet pump (rotary & flat) to remove all scaling, algae and other formed particles on internal surfaces of the tank completely.(d) Fourth stage and first bacteria screening is de-germification by using E-in-C\"s Branch approved chemical as recommended by Engineer-in-Charge.(e)Fifth stage is cleaning the floor of the water tank by heavy duty industrial vacuum cleaner and sludge sucker having maximum 1200W with suitable heavy duty rugged motor to free of any foreign and loose particles of any nature.(f) Sixth stage is the second bacteria screening and sterilizingmethod by using ultravioletrayby heavy duty UV radiationwhich shall have 360 degree of sterilization with in the tank to kill all suspended bacteria (The radiation shall portable and effective for sterilization of drinking water tanks for dimination of floating and suspended bacteria.)(g) Seventh stage of cleaning and third bacteria screening is to sterilize the floor and wall of the water tank by using laboratory certified branded strong oxidizing agent TERBAC G65 of M/S Ray\"s clean tech or equivalent any not-toxic bio-degradable eco-friendly anti-bacterialagentcertified by a Govt. approved laboratory to disinfect the over head tank from all harmfulpathogens. |
| 12 | (h)Cleaning of external surfaces, lid wallof the tank ,structure for all scales and other particles any algae, hivesand any type of vegetationor any other unwanted matters , scraping of old paint and painting with two coats of cement based water proof apex paint complete all as directed.(j)A sticker of appropriate size & colour as directed by Engr-in-Charge and of non degradable material with printed details as under :- (i) CA No(ii) Name of applicant (iii) Name of contractor(iv)columns for date of cleaning and expiry date will be written or printed on the sticker by permanent marking ink. (k)Painting of angle iron ladder for OHT after scrapping of old paint byemory paper or any other means with two coat of enamelled black paint over a coat of red oxide primer including arrangement ofscrap folding/ bamboo structure required for entire work.(l) Painting of raising main, distribution, wash out and overflow pipes on over head tank with suitable colour coding.Note :- All safety equipments required and necessary insurance for safety of working labourto execute the work is responsible of the contractor. |
| 13 | All as serial item No. 05.00 but for OH Reservoir of capacity 50,000 gallons at 64Pump House, Victoria Road Pump House, Ghorpadi Pump House No 1, Ghorpadi Pump House No 2, DAD Complex Pump House, SCOM Pump House and Manoj Panday Pump House. |
| 14 | All as serial item No. 05.00 but for OH Reservoir of capacity 30,000 gallons at Victoria Road Pump House |
| 15 | All as serial item No. 05.00 but for OH Reservoir of capacity25,000 gallons at 64 Pump House. |
| 16 | All as serial item No. 05.00 but for OH Reservoir of capacity10,000 gallons atSCSR comunication complex Pump House. |
| 17 | M&L for preparation of internal plastered/ concrete surfaces of overhead reservoir of capacity 50.00 thousand gallonsat different locations and applying two coats nontoxic, non-corrosive water proof coating inside the tank complete all as specified and directed.Make:- Sikagard-67, Dr Fixit Pidifine 2K, Berger Tankshield PW as certified by CFTRI, Mysore for potable waterNote: -a) Surface preparation and application procedure shall be as per manufacturer’s guidelines and directions of Engineer-in-Charge.b) The paint used should not contain any harmful chemical content to pollute drinking water. A manufacturer certificate for the same is mandatory and contractor must produce the certificate as mentioned above before application to Engineer-in-Charge |
| 18 | M&L for preparation of internal plastered/ concrete surfaces of UG sump of capacity10000 to50.00 thousand gallonsat different locations and applying two coats nontoxic, non-corrosive water proof coating inside the tank complete all as specified and directed.Make:- Sikagard-67, Dr Fixit Pidifine 2K, Berger Tankshield PW as certified by CFTRI, Mysore for potable waterNote: -a) Surface preparation and application procedure shall be as per manufacturer’s guidelines and directions of Engineer-in-Charge.b) The paint used should not contain any harmful chemical content to pollute drinking water. A manufacturer certificate for the same is mandatory and contractor must produce the certificate as mentioned above before application to Engineer-in-Charge |
| 19 | M&L for scrapping and removing old paint, stains, loose materials and algae-fungus growth then cleaning of surface with water using pressure washer machine, fill the crack with acrylic based textured crack filler and applying two coats of modified acrylic exterior emulsion paint of approved shade having silicon additives in paint over a coat of primeroprimer cum sealer having alkali resistance property diluted with water and mixed with bio block in ratio of (5:4:1) on the external surfaces of UG sump and overhead RCC tank having height of 10 to 20 metrs from ground level complete all as specified and as directed. (Note: (i) The contractor shall furnish 5 years performance warranty as per manufacturer of paint (ii) The work should be done by a company recommended applicator and he should be able to furnish stage wise on site technical reports from the concerned complany technologist).Make Of paints and primer: Berger Weathercoat,Asian Ultima strech,Dulux Weathershield Signature |
| 20 | M&L preparation of old plastered or unplastered surfaces of wall incl cornices, pillasters by brooming down with steel wire brushing scrapping down smoke dust, moulds, moss and efflorescent salts and removing oily and greasy spots etc, Priming plastered andother surfaces with alkali resistant priming paint applying two coats of oil bound distemper on old surfaces of walls all as specified and directed.Make Of paints and primer: Berger BisonAcrylic Distemper ,Asian tractor Acrylic,Dulux Duwell Acrylic |
| 21 | M&L preparation of old plastered or unplastered surfaces of wall including cornices, plasters by brooming down with steel wire brushing scrapping down smoke dust, moulds, moss and efflorescent salts and removing oily and greasy spots etc applying two coats of oil bound distemper on old ceiling surfaces of walls all as specified and directed. Make Of paints and primer: Berger BisonAcrylic Distemper ,Asian tractor Acrylic,Dulux Duwell Acrylic |
| 22 | M&L for preparation of old decorated/ undecorated surfaces by sanding,brushing of wood/mild steeland applyingtwo coat ofhi gloss synthetic enamel paint onsurface complete all as specified and as directed.Make of paints and primer: Berger Luxol Hi gloss,Asian Apcolite advanced high gloss,Dulux gloss Premium. |
| 23 | Material & Labour for providing and fixing in repairs stainless steel (Grade 304) railing/laddermade of hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (where ever required) and fitting the same with necessary stainless steel nuts and bolts complete, including fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of floor or the side of waist slab with suitable arrangement including necessary grouting in the existing slabs/walls/ceilingand cementing the samewith necessay PCC /brick work as required at site while matching the existing surface all as directed and specified by Engineer in charge. |
| 24 | M&L for running welding of thickness n\"exc 6mm in repairs complete all as directed. |
| 25 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. |
| 26 | S&F framed work such as grill,channel, valve chamber cover, grating ,etc,with end of bars shouldered and/or riveted,or forged in to spikes, framed guard bars, flat iron, angle, barred iron doors, ladder, framed balusters,walk ways,railings,framework of water tanks and and similar work GDE Fe-410-0 or Fe-310-0, |
| 27 | S & F in repairs 70 cm length ,150 mm diaPVC (SWR) pipes single socketed with necessay matching bend and cowl including necessary PCC work for joining the same with UG sump roof and overhead tank roof.Make oF PVC pipe and fitting : Supreme,Astral,Plasto |
| 28 | M & L for Preparation of old plastered or unplastered wallsurface for white washing |
| 29 | M & L for Preparation of old plastered or unplastered ceiling surface for white washing |
| 30 | M&L for white washingone coat for internal, external surfaces of valve chambers etc. complete all as specified and directed. |
| 31 | Cleaning and removing all scale old dirt from PVC/ RCC/ steel service tanks, at any floor of Md Accns, OTM Accns under GE (North) areawith anti bacterial agent having six stage of cleaning process (i.e mechanically, dewatering, sludge removal, high pressure, vacuum cleaning, anti bacterial spray of tank capacity and writing of the date of cleaning of the water tank with white/Black letters complete all as specified and as directed by the Engineer-in-Charge for the capacityup to 500 litres. |
| 32 | All as serial item No. 24.00 but for Capacity1000 Ltrs |
| 33 | All as serial item No. 24.00 but forCapacity2000 Ltrs |
| 34 | All as serial item No 24.00 but forCapacity5000 Ltrs |
| 35 | All as serial item No. 24.00but forCapacity10000 Ltrs |
| 36 | Supply and replacement of suitable regular LID/ Tank covers made of fiber reinforced plastics/ heavy duty PVC for outdoor weather proof black in colour ECO polimer/modular build type, suitable clear opening type having minimum load bearing of 500 Kg with locking arrangement with PVC hinges fixed with the tank with MS screws at any floor of Md Accns, OTM Accns under GE (North) area complete all as specified and as directed by the Engr-in-Charge for the capacityup to 500-2000 litres. Make:Sintex,Supreme,Plasto |
| 37 | All as serial item No. 29 but for Capacity5000-10000 Ltrs |
| 38 | Supply and fix in repairs 3 inches PVC butthinges with locking arrangement using necessary Galvanised iron screws on PVC overhead water tanks kept on married accn. And OTM bulding upto 4 storeyed all as directed and specified by Engineer-in-charge |
| 39 | Cutting unaxious green growth and grass by manual labour or by machine at all E/M water supply installation premisses and along the boundary fencing and removing rubbish from the site of work where didected not exceeding 100 mtr from the starting point. (The green growth shall be cleaned once in every three month and the measuremet shall be taken every time independently for executed quantity each time. |
| 40 | Supply and replacement of synthetic metal PTMT Float valve heavy duty with suitable company designed length Aluminium Rod, HDPE Ball, SYMET PTMT ball cock of 15 mm dia including taking out the old one in over head reservoir located upto 4 stories buildings of OTM and Married Accomodation as per the direction of Engr- In - Charge. Make : PRAYAG/ Zoloto/Jaypee |
| 41 | Supply and replacement of of synthetic metal PTMT Float valve heavy duty with suitable company designed length Aluminium Rod, HDPE Ball, SYMET PTMT cock of 20 mm dia including taking out the old one in over head reservoir located upto 4 stories buildings of OTM and Married Accomodation as per the direction of Engr- In - Charge. Make : Make : PRAYAG/ Zoloto/Jaypee |
| 42 | Supply and replacement of of synthetic metal PTMT Float valve heavy duty with suitable company designed length Aluminium Rod, HDPE Ball, SYMET PTMT ball cock of 25 mm dia including taking out the old one in over head reservoir located upto 4 stories buildings of OTM and Married Accomodation as per the direction of Engr- In - Charge. Make : Make : PRAYAG/ Zoloto/Jaypee |
| 43 | Supply and fix in replacement Rotational moulded polyethylene water storage tanks (cylindrical vertical with closed top) ISI marked double layer hoisted and fixed in position all as specified in SSR Part I of 5000 ltrs capacity |
| 44 | M & L for rigid pvc sheet at least 3mm thick and density 700 kg per cum screen printed with suitable designs using Glossy PVC Ink and to be fixed using necessary nut ,bolts, washers etc. |
| 45 | S & F in repairs Wire netting of stainless steel wire 1.4mm dia fixed with tinned tacks of stainless steel wire staples with size of mesh 20 mm |
| 46 | S & F in repairs Stainless steel wire cloth. 0.36mm nominal dia of wire and average width of aperture 1.40mm and fixed with stainless steel wire staples |
| 47 | Demolition and dismantlingof concrete of any description and in any position not otherwise specifically provided and throwing the rubbish with in 50mtrs |
| 48 | M&L for PCC 1:2:4 type B-1 (using 20 mm graded stone aggregate) for copingincluding necessary formworkas required complete all as specified and as directed. |
| 49 | M&L for PCC 1:2:4 type B-2 (using 40 mm graded stone aggregate) for Cement concrete in foundations, filling and mass concreteincluding necessary formworkas required complete all as specified and as directed. |
| 50 | M & L for reinforced cement concrete (nominal mix) in slabs supported on walls,beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves including form work as required with type B1(1:2:4) 20 mm graded aggregate |
| 51 | M & L for TMTmild steel bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips Make:Rashtriya Ispat Nigam Limited (RINL),Tata Iron & Steel Company (TISCO or Tata Steel),M/s Jindal Steel and Power Ltd (for TMT bars) M/s Electrosteel Steel Ltd |
| 52 | Demolition of old u/s Brickwork or stone/boulder masonry but built in cement mortar or cement lime mortar |
| 53 | M&Lfor brick masonry with fly ash bricks exc 6 meter mean radius in cement mortar 1:6 all as specified and directed. |
| 54 | Dismantling and removing cement plasterof any thickness and removing from site to a distnace exc 50 metre but not exc. 100 metre all as directed. |
| 55 | M&L for rendering plaster with 15mm thick in cement mortar 1:4 on fair surfaces of brick or concrete surafaces finshed even and smooth surfaces without using extra cement and all as specified and directed by Engr-In-Charge. |
| 56 | M& L for Rough excavation in soft/loose soil not exceeding 1.5 m deep and getting out |
| 57 | Returning filling in including spreading, levelling, watering and well ramming in layers not exceeding 25 cms by using excavated soil. |
| 58 | Removing surplus soil to a distance not exceeding 50 m and depositing where directed at level not exc. 1.5 m above starting point. |
| 59 | M & L for Writing letters alphepet or figures in(Block.Roman, Italic or Indian) n exc. 30 cm length with suitable font thickness, to write in a height of upto 18 mtr including arranements of skufoldings all as specified and as directed. |
| 60 | M & L for Writing letters in English Small/ Capital or figures in Roman/Arthimatic (Block. Roman, Italic or Indian) n exc. 60 cmlength withsuitable font thickness, to write in a height of upto 18 mtr including arranements of skufoldings all as specified and as directed. |
| 61 | Supplying and fixing 3 mm thick, plain acrylic transparent sheet on wall including necessary fixing accessories like stainless steel fasteners, bolts etc., with all alteration at site incuding cutting, reaming etc. complete all as directed. |
| 62 | Removal of bio-degradable bee-hives wild growths from the structure tank and member of the overhead reservoir complete including wild bees with suitable application of fuming smoke or chemical fog application and applying a coat of alergent for keeping away or return of bee-hives (All the bee-hives on the tank shall be removed and cleaned)Note : The removal of bee-hives shall be carried out with total precautions so that wild bees do not get the time and opportunity to attack the public in the locality. |
| 63 | Removal of bio-degradable bee-hives wild growths from the structure tank and member of the overhead reservoir complete including wild bees with suitable application of fuming smoke or chemical fog application and applying a coat of alergent for keeping away or return of bee-hives (All the bee-hives on the tank shall be removed and cleaned)Note : The removal of bee-hives shall be carried out with total precautions so that wild bees do not get the time and opportunity to attack the public in the locality. |
| 64 | M&L forpreparation of external surface Including grouting and rendering of damage surface & matching with the existing surface of overhead water storage tank of 60ft staging( 1 x 200000 gallon at Filter House ) byscrapping all dirt’s dust, rust from roofs and overhead tank walletc and then applywith two coats of heat reflective paint With SRI >=122even and smooth of white colour withcolour bandsall complete as directed by Engr-in-charge. Make of Paint : COOL-ROOF-AV Note: Contractor has to ensure the safety of the working personnel and the quoted rate inclusive the rate of tools and equipments needed for the job. |
| 65 | M&L for scaffolding props etc as required up to the ceiling from bottom and approach the system out inside the dome to enable execution as required of wooden scaffolding with and including necessary support/propping etc ladder at all the corner of the scaffolding for access to any level for the consultant to inspect the items of work complete all as specified and as directed Note: the items will be paid only once from the date of provn of till the dt of completion of work. |
| 66 | M&L for making hold and fixing the metallic packer for injection hydrophobic PU foam ad sealer as per manufactures instructions by providing one metallic packer @ one square meter vertically as well as horizontally complete all as specified and directed. |
| 67 | M&L for applying by mixing CORESEAL 357 A and CORESEAL 357A for plugging live leakage of ring beam slab at floors junction of wall/slab at the inner side of dome by using construction chemical all as specified and directed Make : Built core chemicals or pidilite (Dr fixit) Fosroc |
| 68 | M&L for second course injection or mixture of CORESEAL 135A with CORESEAL 135B (Resin) at the inner side of dome complete all as specified and as directed. |
| 69 | M&L for cleaning the reinforced bars from inside the dome (water retaining portion) with sample of water and applying two coats of CORCOAT ZINC RICH coat on bars followed by application of COREBOND EPOXY on and around the beam keeping the form ready and then pour the micro concrete CORREP mortar all around the cure for the 7 days including necessary scaffolding shoring/ shuttering etc complete all as specified and as directed. |
| 70 | M&L for opening and filling the entire creack of slab with CRACKFILL F-11 (including certain portion base of slab) and grouting with the help of cement and COREOND AR slurry (made out of using 10% COREBOND AR by the weight of cement with a packet of COREGROUT IG in a bag 50 kg cement complete all as specified and as directed.Make : Built core chemical or pidility (Dr fixit) Fosroc |
| 71 | M&L for applying two coats of 200 CORE LP (F) with and including a dash coat ofplaster when the surface of second coat is wet includingpreparation the existing surface complete all as specified and as directed. |
| 72 | M&L for 10mm thick plaster in cement mortar 1:3 mixed with COREPLAS LW plus and corebond AR Shall be mixed as per manufacturer\"s instructions (minimum 200 gms in 50 Kg cement) complete all as specified and as directed. |
| 73 | M&L for Potable epoxy coat on the Internal portion all round the tank complete all as specified and as directed. |
| 74 | S&F in repairs DI pressure pipe ( K-9) IS: 8329, of following sizes, for rising main/inlet/outlet of overhead tank, including taking down old damaged pipe/ fittings, removing debris, supplying and fixing new pipe wit DI fittings ( bends/tees/collars)/ rubber gaskets, nuts, bolts, jointing (push-on/tyton), providing PCC blocks/ supports where required, reconnecting to exixsting pipeline, hydraulic testing for leakage, including excavation and refilling in any type of soil, complete all as specified and as directed by Engr-in-charge. |
| 75 | 100 mm dia. |
| 76 | 150 mm dia. |
| 77 | 200 mm dia. |
| 78 | S&F in repairs MS Pipe (heavy grade/C Class) IS:1239, of following sizes, for rising main/inlet/outlet to overhead tank including taking down old damaged pipes/fittings, cutting, welding, fixing flanged joints, providing nuts, bolts, rubber insertion, painting with primer and enamel paint, testing for leakage, excavation and refilling, and reconnecting to existing system, complete all as specified and as directed by Engr-in-charge. |
| 79 | 100 mm dia. |
| 80 | 150 mm dia. |
| 81 | 200 mm dia. |
| 82 | Note : 1. Performance security:- Refer Condition 22 of Special Conditions. 2. Quoted Contract Sum shall be arrived at after deducting the amount of Credit Schedule (refer Schedule of Credit in pdf form for quantity, rate and amount etc.) for old unserviceable materials retrieved from site. |