| 1 | 1x6 MTR RCC Culvert Dismentalling of Reinforced cement concrete and stacking of serviceable materials (Steel) and disposal of unserviceable material beyond site as per directions of engineer incharge at site. |
| 2 | Demolishing of cement concrete including disposal of unserviceable material beyond site as per directions of engineer incharge at site. |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m,including getting out excavated earth and disposal of surplus excavated earth in all kinds of soil |
| 4 | Providing and laying of soling stone size on level (hand packed) watering ramming complete below Foundation& rooms including carriage with cost and carriage complete. |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level in 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 8 | Reinforcement for RCC work including necessary cuttings, bindings and placing in position including cost of binding wire incl all carraige etc complete job. ( Hot rolled deformed bars) |
| 9 | Centering & Shuttering using kitply including strutting propping etc & removal of form work including all leads, lifts, costs & carriages upto site of work complete in Foundation footings, Basis of colums, Plinth beams, walls & Mass concrete |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. |
| 11 | Supplying and filling of stone/ Nallah muck/ GSB incl carriage for realigning road stretch for temporary use and using same filling behind walls/Abuts after construction of culvert complete job |
| 12 | Providing and fixing of weep holes at desired locations as per the directions of engineer in charge, complete job |
| 13 | P/L 18\" dia of RCc spun pipes including earth work in excavation and fitting the same incl all carriages etc complete job |
| 14 | Carraige of sand /Bajree MT 15 kms |
| 15 | Approach wall /Protection wall Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m,including getting out excavated earth and disposal of surplus excavated earth in all kinds of soil |
| 16 | Providing and laying of soling stone size on level (hand packed) watering ramming complete below Foundation& rooms including carriage with cost and carriage complete. |
| 17 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 18 | Centering and shuttering including Strutting, Propping etc and removal of form work for foundation footing basis of columns |
| 19 | Providing and fixing of weep holes at desired locations as per the directions of engineer in charge, complete job |
| 20 | carriage of sand /Bajree MT 15 kms Please Enable Macros to View BoQ information |