Name of Work:- Blasting Of Rocks In Elcot It Park, Hosur
Sl. No.
Item Description
1
Annexure Price Bid
2
Clearing Heavy Jungle in the proposed site and removal of the debris away from the site as shown by the ELCOT / PMC officials including necessary tools and plants wherever required complete in all respects as directed by ELCOT officials.
3
Earth work excavation MR-&-DMR (Not Requiring Blasting) and depositing on bank with initial lead of 10 m & initial lift of 2m in medium rock and dense medium rock not requiring blasting and refilling the same includes cost of materials tools and plants, equipments, mobilizing, transfering from one place to another with all accessories and operating all the tools and plants forsecondary braking, watering, excavating the rock portionincluding lifting, loading and using electricity power ordiesel generator, conveyance and depositing the sameaway from the work site at a required distance from theexcavated area and without obstruction to the work asspecified by ELCOT officials. with an initial lead of10m and initial lift of 2m including all incidental charges,fuel charges to all machines, hire charges, crew chargescompletely compiling with standard specifications and asdirected by ELCOT officials.
4
Plot no.16 - 10.51 acres
5
Plot no.7 - 10.01 acre
6
Plot no.10 & 11 2nd phase8.00 acre
7
Plot no.7 2nd phase - 4.00acre
8
Plot no.12 & 13 - 5.00 acre
9
Earth Work Excavation in hard rocks /boulders by controlled blasting as shown by the ELCOT / PMC officials The rateincludes cost of materials tools and plants, equipments,mobilizing, transfering from one place to another withall accessories and operating all the tools and plants forsecondary braking, watering, excavating the rock portionincluding lifting, loading and using electricity power ordiesel generator, conveyance and depositing the sameaway from the work site at a required distance from theexcavated area and without obstruction to the work asspecified by ELCOT officials. with an initial lead of10m and initial lift of 2m including all incidental charges,fuel charges to all machines, hire charges, crew chargescompletely compiling with standard specifications and asdirected by ELCOT officials.
10
Plot no.16 - 10.51 acres
11
Plot no.7 - 10.01 acre
12
Plot no.10 & 11 2nd phase8.00 acre
13
Plot no.7 2nd phase - 4.00acre
14
Plot no.12 & 13 - 5.00 acre
15
Breaking, removing and stacking for pre measurements of hard rock requiring blasting by the way of silent blasting using approved rock disintegrating chemicals/ rock splitting materials by drilling holes to appropriate depth of not more than 1.5m with required spacing. The drilled hole should be properly cleaned using air/water compressor so as to receive the freshly prepared chemical slurry and filling the slurry within stipulated time. The depth of slurry filling should be made upto 15 mm from top surface and to be covered using tarpaulins. The rate includes cost of materials tools and plants, equipments, mobilizing, transfering from one place to another with all accessories and operating all the tools and plants for secondary braking, watering, excavating the rock portion including lifting, loading and using electricity power or diesel generator, conveyance and depositing the same away from the work site at a required distance from the excavated area and without obstruction to the work as specified by departmental officers with an initial lead of 10m and initial lift of 2m including all incidental charges, fuel charges to all machines, hire charges, crew charges completely compiling with standard specifications and as directed by departmental officers. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.