| 1 | Earthwork in all kinds of soil in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stoney earth and earth mixed with boulders except sheet rocks and boulders requiring blasting with all leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring, shuttering. dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc as required for the work complete as directed by the Engineer-in-charge. |
| 2 | Supplying and filling the foundation trenches in si o oudtoni pc & plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick watering and ramming including cost coveyance royalty and taxes of all materials, cost of all labour, T&P etc as required for the work complete as per the direction of EIC |
| 3 | Providing cement concrete for unreinforced cement concrete works of proportion (1:3:6) with 40mm size crusher broken hard granite (CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading and unloading) & equipments for handing, |
| 4 | Dismantling and removing doors, windows and ventilators including removal of frame hinges, fastening and stacking the same for reuse and removing the debris within 50m lead |
| 5 | Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead (Parapet Wall) |
| 6 | Dismantling and removing R.C.C.columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead |
| 7 | Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead |
| 8 | R.C.C. work of M20 having minimum compressive strength (working stress) 200kg/cm2 in 15cm cubes at 28 days after mixing and test conducted in accordance with 1.5. 456 and LS 516 using 12mm to 20mm size (1/2\" to 3/4\") crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, waterine and curing for 28 days. |
| 9 | Plinth Beem |
| 10 | Column UP to GL to PL |
| 11 | Column 1st Floor |
| 12 | Stair Case |
| 13 | Roof Beem |
| 14 | Roof Slab |
| 15 | Roof Slab |
| 16 | Straightening, cutting, bending and binding, welding and jointing (if necessary) coiled/bent up MS. rods/Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 guage binding wire required for RCC work including cost, conveyance, taxes of all materials, cost of all labour. T&P etc as required for the work complete (weight of binding wires will not be considered) as directed by Engineer-in-charge |
| 17 | First class fly ash Brick work in cement mortar (1.6) in super structure with best quality bricks having crushing strength from 75KG/cm2 to 99Kg/cm/2. immersing the bricks in water for not less than 6 hours before use the bricks shall well brunt, free from cracks, well shaped, uniform.in size and shall produce a clear metallic ringing |
| 18 | Up to PL |
| 19 | 1st Floor Parapet Wall |
| 20 | 12mm thick Cement Plaster (1:4) on brick Work. |
| 21 | 12mm thick Cement Plaster (1:4) on brick Work. (1st Floor) |
| 22 | 16mm thick Cement Plaster (1:6) for brick / Stone Work. |
| 23 | 6mm thick Cement Plaster (1:4) to RCC Surfaces finished Smooth including closed deep chiping and slury treatment. |
| 24 | Scarping Plaster in Lime or Cement Mortar from Brick/Stone Masonry including T&P sorting the dismantled material, Disposal of unserviceable material and stacking the serviceable material with all lifts & lead of 1000m. |
| 25 | Finishing plastered surfaces of walls with Berger Synthetic Putty (interior) & marking smooth to receive painting. |
| 26 | Priming 1 Coat with any approved Primer (Labour Only) |
| 27 | Enamel Painting Two Coats INSIDE with all Materials. |
| 28 | Wall Painting 2 Coat with Weather Coat Paint. |
| 29 | Supplying fitting and fixing vetrifed tile in floors of size 600mm x 600mm of approved make confirming to IS 13755 with application of polymer modified quick set cement based water resistant adhesive confirming to IS 15477 of 3mm thick bed and filling joints with |
| 30 | Fixing Tiles to Dados Skirting & Risers on 12mm. Thick C.P (1:3) jointed with neat Cement Slurry without Cost of Precast Tiles. |
| 31 | Fixing Tiles to Stair Case & risers on 12mm. Thick C.P (1:3) jointed with neat cement Slurry without Cost of Precast tiles. |
| 32 | Supplying Fitting and Fixing of M S Door and Window with frame with MS angle frame of 35x35x6 mm and shutter section of 30x30x5 MS angle with welding of 25x6 mm flate and welding of 16gauge CR shutter with arrangement of clamp fitting of 3nos 4\" hinges |
| 33 | Removal of excaveted earth by mechanical means with in 5 km initial lead and lift etc all complete Please Enable Macros to View BoQ information |