| 1 | Fitting one set AB switch and giving connection |
| 2 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 3 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 4 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 5 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 6 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 7 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 8 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 9 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 10 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 11 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 12 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
| 13 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 14 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 15 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. |
| 16 | Fitting one additional HT pin with insulator |
| 17 | Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. |
| 18 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole. |
| 19 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 20 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 21 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 22 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. |
| 23 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 24 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 25 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 26 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 27 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 28 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 29 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. Please Enable Macros to View BoQ information |