| 1 | Name of Item |
| 2 | Part-A Civil work |
| 3 | E/W in Excavation in foundation in ordinary Soil for Boundary & Pathway Boxing SOR 2023-24 Ch-4 2.6.1 |
| 4 | P.C.C. in 1:6:12 (1 cement : 6 c sand : 12 Brick aggregate 40mm nominal size all Complete. SOR 2023-24 pwd sch-273 ch-5 |
| 5 | class 150 B/W with 1:4 cement & Coars sand mortar etc. all Complete. S.I. no. 6.1.1) |
| 6 | Class m-150 brick work in S/S with 1:4 C/C. Sand in mortar in supply of all materials labour T&P complete. SOR 2023-24 6.4.1 |
| 7 | 12 mm cement plaster with 1:4 cement & coarse sand mortar included in all materials, labours T&P etc all complete. SOR 2023-24 13.4.1 |
| 8 | Finishing walls with birla putty 1mm thick. all complete. S.I. New ch 15 SOR 2023-24 S.I. No 30 |
| 9 | Finishing walls with apex paint exterior paints of best quality including supply of all materials labour and T&P required per proper completion of work . all complete. S.I. No. New ch. 15 SOR 2023-24 S.I.no 34 |
| 10 | Providing/Laying 80 mm thick interlocking tiles all complete. Ch 26 Si no 22 |
| 11 | P/L C:C: with 1:2:4 Cement & c Sand mortar all Complete. 4.1.3 sor 2023-24 |
| 12 | DPC 2.5 cm thick with 1:2:4 SOR 2023-24 Ch-7 (4.10) A |
| 13 | Mild Steel or Iron Work in Heavy Size SOR 2023-24 Ch-10 S.Np. 21 10.25.2 |
| 14 | Painting or Varnishing one coat with primer coat of readymixed priming paints & two Coat of appd. Superior Quality paint all complete(S.I. No. 641) + 19.29642/15.1.2 ch-15 sor |
| 15 | Installation of 2 Hp Submersible Pump (previous sanctioned rate) |
| 16 | P/Fixing Gym Apparatus all Complete. |
| 17 | Fun Walker (previous sanctioned rate) |
| 18 | Leg press cum standing Twister (previous sanctioned rate) |
| 19 | Leg Lift post (previous sanctioned rate) |
| 20 | Taichi Double (previous sanctioned rate) |
| 21 | Shoulder Twirl Double (previous sanctioned rate) |
| 22 | Fun cycle (previous sanctioned rate) |
| 23 | ABB Trainer (previous sanctioned rate) |
| 24 | Ski trainer (previous sanctioned rate) |
| 25 | Step Trainer (previous sanctioned rate) |
| 26 | Site Survey complete with measuring outer boundry of site and marking points for Plantation. (previous sanctioned rate) |
| 27 | Digging of pits following size. |
| 28 | 0.60x0.60x0.60 ch-4 (2.6.1) Sor 23-24 |
| 29 | 0.45x0.45x0.45 ch-4 (2.6.1) Sor 23-24 |
| 30 | Supply and mixing local sand @.01cum/plant (ch 16 B) |
| 31 | Supply and mixing of F.Y.M. (@0.01Cum/Plant) including, loading, unloading, cartage all. ( file /70/udhyan/22-23) |
| 32 | Fertilizers |
| 33 | Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage all. |
| 34 | Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage all. |
| 35 | Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage all. |
| 36 | Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant |
| 37 | Providing well development plants |
| 38 | Plumeriya Alba (previous sanctioned rate) |
| 39 | Ficus blakena (previous sanctioned rate) |
| 40 | Hibiscus (code 8.36 Heights 60-75cm DSR 2020) |
| 41 | Chandani (code 8.60 Heights 90-105cm DSR 2020) |
| 42 | Srawani (code 8.43 Heights 90-105cm DSR 2020) |
| 43 | Hamelia (code 8.32 Heights 60-75cm DSR 2020) |
| 44 | Ticoma Spp.(code 8.71 Heights 60-75cm DSR 2020) |
| 45 | One time Irrigation with Labour Charge |
| 46 | One time Earth Work (Weeding & Cleaning) |
| 47 | Development of Hedge (Approved rate) |
| 48 | Maintenance of Headge upto One Year (Approved rate) |
| 49 | Maintenance of plants for first year including taking responsibility of all types including hoeing, watering, manuring, weeding and casualty replacement of damaged plant including, all labour T & P as required for proper completion of work as per direction by engineer incharge. |
| 50 | Development of Lawn |
| 51 | Maintenance of Lawn upto one Year. |
| 52 | P/F of R.C.C. Benches Please Enable Macros to View BoQ information |