| 1 | Removing the reinforced cement concrete to a level as directed by the Engineer at site and disposing the debris away from the site including hire charges of tool and plants, labour charges, leads and lifts etc., complete. |
| 2 | Dismantling the structural steel work and stocks the same carefully for reuse/ devolution to stores as directed by the Engineer at site including all labour charges, hire charges of tools & plants, leads & lifts etc. complete. |
| 3 | Supplying, fabricating and placing in position of steel reinforcement for RCC works as directed by the Engineer at site including cost of steel, binding wire, labour charges for cutting, bending, binding, leads and lifts etc., complete. |
| 4 | Providing and placing of RCC 1:1½:3 using 20 mm HBG metal as directed by the Engineer at site including cost of all materials, labour charges, centring, shuttering, curing, leads and lifts, etc. complete but excluding cost of reinforcement. |
| 5 | Supply, fabrication and fixing in position of structural steel with proper alignment on the RCC pedestal as directed by the Engineer at site including labour charges, hire charges for tools & plants, leads & lifts, etc. complete. |
| 6 | Providing PCC 1:3:6 using 20 mm HBG metal for flooring as directed by the Engineer at site, including cost of all materials, labour charges, curing, leads, lifts, transport, etc. complete |
| 7 | Brick work in CM 1:4 using Fly ash Bricks for super structure as directed by the Engineer at site including cost of all materials, labour charges, T&P, curing, leads & lifts, etc., complete. |
| 8 | Plastering in CM 1:5, 12mm thick for wall surfaces including cost of all materials, Labour charges, curing, T&P, Leads and Lifts, etc. complete. |
| 9 | Colour washing with two coats of cement paint over a coat of white cement for the exterior wall surfaces including cost of all materials, labour, curing, leads & lifts etc., complete. Please Enable Macros to View BoQ information |