| 1 | Name of Item |
| 2 | Part-A Civil work |
| 3 | Earth work: Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.5m lead upto 30m including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches. CH-4 SOR 23-24 SI No.2.6(2.6.1) |
| 4 | P/L in PCC of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8(1 cement : 4 coarse sand (zone-III): 8 graded Brick aggregate 40 mm nominal size)CH-4 SOR 23-24 SI No.2.6(2.6.1)SI No.274 |
| 5 | Construction of granular sub-base by providing close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause Morth 401. PSR |
| 6 | Providing and laying of 80 mm. Thick C.C. pre rubber moulded Inter locking paver tiles including 40 mm thick fine sand bed with over granular sub base (GSB) and compacted base of but including c.c. work in side of interlocking tiles for proper slope and camber including cost of all material, labour, T&P etc. required for proper completion of work. CH-26 SOR 2023-24 S.I No. 22 |
| 7 | Class-150 brick work 1:4 (1 cement: 4 coarse sand) in Foundation & Plinth including supply of all material, labour, T&P etc. required for proper completion of work. CH-6 SOR 2023-24 S.I No. 1/6.1.1) |
| 8 | 12 mm cement plaster with 1:4 cement & coarse sand mortarincluded in all materials, labours T&P etc all complete. S.I. no. 17.58 |
| 9 | Finishing walls with birla putty 1mm thick. all complete. New CH 15 S.O.R. 2023 |
| 10 | Finishing walls with apex paint exterior paints of best quality including supply of all materials labour and T&P required per proper completion of work. all complete. CH 15 S.O.R. 2023 S.I. No. 13.46.1 |
| 11 | Mild steel or iron work of small sizes and sections such as holding down bolts, hold fasts, tie, rods, gratings etc., (when not included in an over all rates) wrought to required form, including supply of steel, bolts, nuts and wastage etc and their fixing required for proper completion of the work. CH-10 SOR 23-24 SI No.10.2 |
| 12 | Painting and warnishing to coat over priming coat on steel work including supply of all materials labour T&P complete CH-15 SOR 23-24 SI No.(641+642+19.29) |
| 13 | Supply & Fixing of Chequerred precast cement concrete tiles 22 mm thick In footpath & courtyard, Jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).Light shade pigment using white cementCH-14 SOR 23-24 SI No.(5/11.20.1) |
| 14 | Providing & Fixing of fountain. (PSR) as per drawing. |
| 15 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 1 km. also including ramming and watering of the earth in layers not exceeding 20 cm. in trenches, plinth, sides of foundation etc complete. Cartage 20 km. |
| 16 | Part-B Horticulture Work |
| 17 | Syngonium podophyllum golden (miniature) |
| 18 | Chlorophytum comosum (Varigated) |
| 19 | Bouganvillia Multicoloured |
| 20 | Digging of pits following size |
| 21 | 0.45x0.45x0.45 m size |
| 22 | 0.15x0.15x.15 m size |
| 23 | Supply and mixing of Local Sand(@0.001 CuM/Plant) including, cartage, loading, unloading all. |
| 24 | Supply and mixing of F.Y.M. (@0.01Cum/Plant) including, loading, unloading, cartage all. |
| 25 | Fertilizer |
| 26 | Supply and mixing of D.A.P (@0.035Kg/Plant) including, loading, unloading, cartage all. |
| 27 | Supply and mixing of Neem Cake(@ 1Kg/Plant) including, loading, unloading, cartage all. |
| 28 | Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage all. |
| 29 | Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant Please Enable Macros to View BoQ information |