| 1 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. |
| 2 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications |
| 3 | Construction of Subgrade and Earthen Shoulders with Material with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. |
| 4 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification |
| 5 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications |
| 6 | Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M15 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409.As per MORTH Data Book & Specification clause 8.2-409 |
| 7 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 8 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with |
| 9 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification |
| 10 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC M15 |
| 11 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M25 |
| 12 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. |
| 13 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M20 using batching plant & manual placing Please Enable Macros to View BoQ information |