| 1 | Schedule \"A\" Section - I |
| 2 | Disconnecting /unscrewing coupling for 220 HP pump set and seperating pump and motor, disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame, transporting to workshop to carry out the necessary repairs and took back after repairs , installing on existing location ,making all the connections carefully, commissioning and testing at site to the entire satisfaction of the Engr-in-Charge. Note: (i) All the Spares/ parts/ job repairs required to be replaced shall be measured and paid seperately as under:-(ii) Machinery breakdown complaint to be attended within 12 Hrs and after repairing the same to be fixed and tested within 48 Hrs. |
| 3 | Coupling Set suitable for 220 HP Pumping set |
| 4 | Replacement of gun metal impeller |
| 5 | Replacement of gun metal Bush |
| 6 | Replacement of Gland Sleeve |
| 7 | Replacement of body Neck ring gun metal |
| 8 | Replacement of Pump shaft stainless steel |
| 9 | Counter Plate stainless steel |
| 10 | Diffuser Packing |
| 11 | Impeller brazing machining and reboring |
| 12 | New Key way of impeller disc |
| 13 | Diffuser outer dia brazing and machining |
| 14 | Impellers outer dia brazing and machining |
| 15 | Disconnecting /unscrewing coupling for 150 HP , 125 HP pump set and seperating pump and motor, disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame, transporting to workshop to carry out the necessary repairs and took back after repairs , installing on existing location ,making all the connections carefully, commissioning and testing at site to the entire satisfaction of the Engr-in-Charge. Note: (i) All the Spares/ parts/ job repairs required to be replaced shall be measured and paid seperately as under:-(ii)Machinery breakdown complaint to be attended within 12 Hrs and after repairing the same to be fixed and tested within 48 Hrs. |
| 16 | Coupling Set suitable for 150 HP /125 HP Pumping set |
| 17 | Replacement of gun metalimpeller |
| 18 | Replacement of gun metal Bush |
| 19 | Replacement of Gland Sleeve |
| 20 | Replacement of body Neck ring gun metal |
| 21 | Replacement of Pump shaft stainless steel |
| 22 | Counter Plate stainless steel |
| 23 | Diffuser Packing |
| 24 | Impeller brazing machining and reboring |
| 25 | New Key way of impeller disc |
| 26 | Diffuser outer dia brazing and machining |
| 27 | Impellers outer dia brazing and machining |
| 28 | Disconnecting /unscrewing coupling for 75 HP , 60 HP pump set and seperating pump and motor, disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame, transporting to workshop to carry out the necessary repairs and took back after repairs , installing on existing location ,making all the connections carefully, commissioning and testing at site to the entire satisfaction of the Engr-in-Charge. Note: (i) All the Spares/ parts/ job repairs required to be replaced shall be measured and paid seperately as under:-(ii)Machinery breakdown complaint to be attended within 12 Hrs and after repairing the same to be fixed and tested within 48 Hrs. |
| 29 | Coupling Set suitable for 75, 60 HP Pumping set |
| 30 | Replacement of gun metalimpeller |
| 31 | Replacement of gun metal Bush |
| 32 | Replacement of Gland Sleeve |
| 33 | Replacement of body Neck ring gun metal |
| 34 | Replacement of Pump shaft stainless steel |
| 35 | Counter Plate stainless steel |
| 36 | Diffuser Packing |
| 37 | Impeller brazing machining and reboring |
| 38 | New Key way of impeller disc |
| 39 | Diffuser outer dia brazing and machining |
| 40 | Impellers outer dia brazing and machining |
| 41 | Supply and fixing in replacement of pressure gauge upto 100 Kg/sqcm and connected to pump set with and including syphon type pipe (as per existing sample), completeall as speciified and as directed by Engineer-in-charge. |
| 42 | Supply and fixing in replacement of ball bearing 6314/6313, including replacement of old grease with new completeall as speciified and as directed by Engineer-in-charge. |
| 43 | Supply and fixing in replacement of ball bearing 6319/6319-C3, including replacement of old grease with new completeall as speciified and as directed by Engineer-in-charge. |
| 44 | Supply and fixing in replacement of roller bearing NU 306/307/309, including replacement of old grease with new completeall as speciified and as directed by Engineer-in-charge. |
| 45 | Disconnecting existing electric motor and dismantling from foundation and transporting the same to the workshop for repairs and refixing the same on existing location after repair & making electric connection including testing and commissioning complete.The job including taking out burnt winding and rewinding the motor with super enamelled copper wires as per existing guage and size including super quality of varnish and insulating material as required for 220 HP, electric motor completeall as speciified and as directed by Engineer-in-charge.Note : Machinery breakdown complaint to be attended within 12 Hrs and after repairing the same to be fixed and tested within 48 Hrs. |
| 46 | -ditto- all asper Item No. 8.00 above but of capacity 150 HP, motor complete. |
| 47 | -ditto- all asper Item No. 8.00 above but of capacity 125 HP, motor complete. |
| 48 | -ditto- all asper Item No. 8.00 above but of capacity 75 HP, motor complete. |
| 49 | -ditto- all asper Item No. 8.00 above but of capacity 60 HP, motor complete. |
| 50 | Disconnecting /unscrewing Auto Transformer Starter Panel of capacity 125/150/ 220 HP, disconnecting all electric connections and carrying out necessary repair at site with replacement of parts as under complete all as specified including testing at site to the entire satisfaction of the Engr-in-Charge.Note: All the Spares/ parts/ job repairs required to be replaced shall be measured and paid as under: |
| 51 | Supply and fixing in replacement Electronic over current relay cap 0.5 – 60A220V AC complete with arrangement for over current, phase reversal, under current and phase imbalance protection suitable for 150/250 HP ATS Panel completeall as speciified and as directed by Engineer-in-charge. |
| 52 | Supply and fixing in replacement Three pole power contactor, AC Control, AC3 Rating 95A/ 47 KW, 415V complete with auxillary contact heavy duty suitable for pumping set operation incl taking out existing unsv power contactor completeall as speciified and as directed by Engineer-in-charge. |
| 53 | Supply and fixing in replacement Three pole power contactor, AC Control, AC3 Rating 140A/ 75 KW, 415V complete with auxillary contact heavy duty suitable for pumping set operation incl taking out existing unsv power contactor completeall as speciified and as directed by Engineer-in-charge. |
| 54 | Supply and fixing in replacement Three pole power contactor, AC Control, AC3 Rating 265A/ 140 KW, 415V complete with auxillary contact heavy duty suitable for pumping set operation incl taking out existing unsv power contactor completeall as speciified and as directed by Engineer-in-charge. |
| 55 | Supply and fixing in replacement Three pole power contactor, AC Control, AC3 Rating 300A/ 160 KW, 415V complete with auxillary contact heavy duty suitable for pumping set operationincl taking out existing unsv power contactor completeall as speciified and as directed by Engineer-in-charge. |
| 56 | Supply and fixing in replacement No volt coil complete all as speciified and as directed by Engineer-in-charge |
| 57 | Supply and fixing in replacement Timer completeall as speciified and as directed by Engineer-in-charge |
| 58 | Supply and fixing in replacement Digital voltmeter of size 96 x 96mm range 0 to 500 volts, 3 phase with in built in selector switch, suitable for CT operation- 01 set.all as speciified and as directed by Engineer-in-charge |
| 59 | Supply and fixing in replacement Digital Ammeterrange 0 to 400 Amps, 3 phase with iin built in selector switch, suitable for CT operation- 01 set.all as speciified and as directed by Engineer-in-charge |
| 60 | Supply and fixing in replacement Indicator set R,Y,B 01 set of 3 pcs as per existing all as speciified and as directed by Engineer-in-charge |
| 61 | Supply and fixing in replacement Selector switch as per existing all as speciified and as directed by Engineer-in-charge |
| 62 | Material and labour for reparing/servicing of APFC panel board of Capupto 300 KVAr by replacing the all defective components with new components, rewiring, cleaning, testing, reconnecting, reinstalling and commissioning the APFC panel board complete all as directed by Engineer-in-Charge.Note : Supply of cables, wires & other minor spare parts etc will deemed to be included in the quoted rate. |
| 63 | Supply and fixing in replacement of cooling fan suitable for upto 300 KVAr capacity APFC panel with proper connection, complete all as directed by Engineer-in-Charge. |
| 64 | Material and labour for Earthing complete with galvanised steel earth electrode plate of size 600x600x6mm thick, buried directly in ground (earth pit not less than 2.25m deep below normal ground level) with top edge of the plate not less than 1.50m below normal ground level, connected to galvanised iron earth strip 32x6mm up to test point with suitable GI nuts/bolts and brazed properly up to main board including earth pit in cement concrete 1:2:4 type B-1, precast RCC cover in 1:2:4 reinforced with expanded metal, with suitable handle, excavation and earth work in any type of soil and including medium grade GI watering pipe 25mm bore with funnel wire mesh and medium grade GI earth wire protection pipe 50mm bore up to main board complete as shown in electrical plate no 3 of MES schedule Part-I 2009, connected to earthing testing point including taking out existing unsv earthing complete all as specified and testing on completioncomplete all as specified and directed by Engr-in-charge. |
| 65 | Ditto- all as per ser item No. 23.00 above , but using copper plate 60×60cm ×3.15mm thick electrode and 20×3mm copper strip as earthing leadincluding taking out existing unsv earthing complete all as specified and testing on completioncomplete all as specified and directed by Engr-in-charge. Notefor ser item Nos 23.00 & 24.00 : The units rate includes the cost of excavation & earth work in any type of soil charcoal & salt in altemate layers, 25mm GI Pipe (light grade) for watering 50mm GI protection pipe (light grade) funnel wire mesh PCC chamber in PCC 1:3:6 type C-1 cast iron frame and 40mm thick RCC cover for pit etc & no extra payment will be made. |
| 66 | Supply and fixing in replacementMCCB 630 Amps 4 pole, 50 KA, 415 V, 50 Hz, adjustable type and connecting up in the existing panel location completeall as speciified and as directed by Engineer-in-charge. |
| 67 | Supply and fixing in replacement MCCB 400 Amps 4 pole, 36 KA, 415 V, 50 Hz, adjustable type and connecting up in the existing panel location completeall as speciified and as directed by Engineer-in-charge. |
| 68 | Supply and fixing in replacement MCCB 250 Amps 4 pole, 36 KA, 415 V, 50 Hz, adjustable type and connecting up in the existing panel location completeall as speciified and as directed by Engineer-in-charge. |
| 69 | Supply and fixing in replacement MCCB 200 Amps 4 pole, 36 KA, 415 V, 50 Hz, adjustable type and connecting up in the existing panel location completeall as speciified and as directed by Engineer-in-charge. |
| 70 | Supply and fixing in replacement MCCB 160 Amps 4 pole, 36KA, 415 V, 50 Hz , adjustable type and connecting up in the existing panel location completeall as speciified and as directed by Engineer-in-charge. |
| 71 | Material and labour for Cross arms bracings, support, clamps and back plates fabricated from structural steel section including nuts, bolts, washers etc, welding, bending cold or hot, drilling holes for bolts in any shape or size as indicated or directed and incl one coat of primer, and two coats of aluminum paint complete all as specified and directed by Engr-in-charge. |
| 72 | Material and labour for cement concrete 1:4:8 type D2 using 40mm graded stone aggregate as in foundation of electric poles, sturts, blocks with and including necessary form work, and fair finish to exposed surfaces without using extra cement complete all as specified. |
| 73 | Supply and fixing in replacement GI pipe 100 mm dia light grade along pole for covering cable including clamp, nuts, bolts & washers etc complete all as specified. |
| 74 | Supply and fixing in replacement double walled corrugated HDPE duct pipe of 63 mm outer dia confirming to IS: 14930 (Part-II) of approved colour with fittings for cable protection complete all as specified. |
| 75 | Supply, laying, jointing and testing replacement PVC insulated cable 1100 volt grade with multi stranded, single core copper 95 Sqmm,Grade As Per IS 7098 (Part -1) 1988 incl making electrical connection from main panelto starter and starter to motor, in suitable lengths as per site requirement and duly fixed with suitable size of copper lugs/thimbles complete all as specified and as directed by Engr-in-charge. |
| 76 | All as per ser no 34 above but of size 120sqmm, complete all as specified and as directed by Engr-in-charge. |
| 77 | All as per ser no 34 above but of size 185sqmm, complete all as specified and as directed by Engr-in-charge. |
| 78 | Material and labour for Taking out complete Auto Transformer Panel (ATS) setof cap 60/75HP incl disconnecting all electric connections, by carrying to a distance of 15mtrs and making new foundation suitable for the ATS panel and grouting with suitable size nut and bolts and fixing the same ATS panel and making all electric connections and testing the panel complete all as specified and directed by Engr-in Charge. |
| 79 | Supply and fixing in replacement of Copper Thimble of size 220mmcomplete. |
| 80 | Supply and fixing in replacement of Copper Thimble of size 150mmcomplete. |
| 81 | Supply and fixing in replacement of Copper Thimble of size 120mmcomplete. |
| 82 | Supply and fixing in replacement of Copper Thimble of size 95mmcomplete. |
| 83 | Supply and fixing in replacement of relay for ATS panel, IEC -255 of 150 VAC, 5 amp - 28v DC, 8 pin with base as per existing make and model, ensure proper working of panel complete all as specified and directed by engr-in-charge. |
| 84 | Supply and fixing in replacement ofhex rubber coupling 6MM with suitable bolt, nutand washer for pump and motor coupling all as per existing size and make complete all as specified and directed by Engr-in-charge . |
| 85 | Supply and fixing in replacement, Battery Bank consisting of 30 Nos Batteries, each battery of 12 V, 42 Ah, maintenance free, totally enlcosed in a suitable sized multi stage MS frame structure as per existing at site completely all as specified and directed by Engr-in-Charge. Note: (i) Suitable copper wires for interconnecting batteries with copper thimbles and from battery bank upto the UPS incl all necessary connections shall be made properly. Cost for the same deemed to be inclusive in the quoted rate of the item itself. (ii) Old unsv batteries shall be deposited at MES store for disposal action. |
| 86 | Supply and fixing in replacement of Start Push button for ATS Panel all as per existing and all as specified and directed by Engr-in-Charge |
| 87 | Supply and fixing in replacement of Stop Push button for ATS Panel all as per existing and all as specified and directed by Engr-in-Charge |
| 88 | Supply and fixing in replacement of MC Contactor of 25 KVAr capacity for APFC Panel all as specified and directed by Engr-in-Charge. |
| 89 | Supply and fixing in replacement of MC Contactor of 10 KVAr capacity for APFC Panel all as specified and directed by Engr-in-Charge. |
| 90 | Supply and fixing in replacement of MC Contactor of 05 KVAr capacity for APFC Panel all as specified and directed by Engr-in-Charge. |
| 91 | Supply and fixing in replacement of Heavy Duty Capacitor of 20 KVAr capacity for APFC Panel all as specified and directed by Engr-in-Charge. |
| 92 | Supply and fixing in replacement of Heavy Duty Capacitor of 10 KVAr capacity for APFC Panel all as specified and directed by Engr-in-Charge. |
| 93 | Supply and fixing in replacement of Heavy Duty Capacitor of 1 to 5 KVAr capacity for APFC Panel all as specified and directed by Engr-in-Charge. |
| 94 | Supply and fixing in replacement of Rubber Mat of size (1 Meter x 2 meter x 19mm) to be used in pump house for safety purpose of operators complete all as specified and directed. |
| 95 | Supply and fixing in replacement of stud for 220/150HP pumpset (as per existing sample), complete all as specified and directed by Engineer in charge. |
| 96 | Supply and fixing in replacement of current transformer 250/5A, Class 1 ID 45 CT, 15 VA for Ammeter with current rating 5.0 amps suitable for ATS panel, all as specified and directed by Engr-in-Charge. |
| 97 | Supply and fixing in replacement of Bypass Switch of rating 400A (as per existing sample) for Servo Voltage Stablizer of rated capacity 250KVA, rated voltage 240V with 3 nos of phases , all as specified and directed by Engr-in-Charge. |
| 98 | Supply and fixing in replacement of shock treatment chart printed in multi languages of standard size fixed on suitable wooden base frame, complete all as specified and directed by Engineer in charge. |
| 99 | Supply and fixing illuminated display board with writing name of water supply installations/ distribution tanks of size 1.25mx0.2mx0.9m (LXBXH) on flex of light blue colour, letters shall be written in capital white, size of letters proportion with overall size of board, outer side fabrication bordered with aluminium angle frame of 25mmx25mmx3mm thick, inner side fabricated with 12mm MS square bar, mounted on 50mm dia GI Pipe medium grade, shall be fixed both side of board with 2 nos 30mmx4mm thick MS Flat of suitable length welded to GI Pipe, incl nuts, bolts and washers with display board not less than 3M height and illuminated with LED 40W Tubelight fittings 01 Nos, including its fixing arrangement, complete all as specified and as directed . Note:- (i) The drawing and design of board including colour of board shall be approved by Engr-in-Charge. (ii) Necessary PCC work using 1:2:4 type B1 for foundation incl mounting the entire frame shall be carried out as directed. (iii) Suitable size SMC/FRP junction box controlled by 01 MCB SP to be provided with the Display board incl making all necessary connections complete with suitable size wires from electric supply point to a distance upto 5mtrs complete. (iv) Cost for the entire job shall be deemed to be included in the quoted rate of item itself. |
| 100 | Supply and fixing in replacement, Sign board for water supply installation /equipments (Pump, motors,Transformers, VCB,APFC Panel, Stabilizers etc,) name to be written on Acrylic board of blue color of size 60x10 cm of thickness 5 mm, letters shall be of white in color of size 5 cm, including fixing the board on suitable place near the equipment with self adhesive double sided tape or with hanging chain as per site requirement complete all as specified and directed by Engr-in-Charge. |
| 101 | Material and labour in replacementfor pacific Hydrolube, Hydraulic oil of viscosity ISO-32/46 for pump lubrication and top up upto 80% in all pumps complete all as specified and directed by Engr-in-charge. |
| 102 | Supply, installation, testing and commissioning of chlorine dosing pump model RA-11 electromagnetic type with accessories like anti siphon valve/ discharge tubing capable to driver 10LPH @ 6 kgs/cm squ back pressure and FRP solution preparation tank capacity : 100 Ltr with lid, port hole, onlet / outlet / drain connection, level guage etc and fitted with 960 RPM motor & PVC agitator complete all as specified and directed by Engr-in-Charge. |
| 103 | Material and labour in replacement for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit / pipe or fixed to poles or any other indicated situation for loop earthing etc, as required at site Copper strip of size 20x3 mm incl providing insulators for copper earthing strip properly layout with angle of turn 90 degree and testing complete all as specified and directed by Engineer -in-charge. |
| 104 | Material and labour for replacement of coarse aggregates, grading I, 90 MM to 40MM for laying on groundunder poles as base layer for HT 2 Pole and 4 Pole structure at certain water supply installation with outer boundary of bricks laid properly complete all as specified and directed by Engr-In-charge. |
| 105 | Material and labour in replacement for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit / pipe or fixed to poles or any other indicated situation for loop earthing etc, as required at site GI strip of size 25x4 mm incl providing insulators for GI earthing strip properly layout with angle of turn 90 degree and testing complete all as specified and directed by Engineer -in-charge. |
| 106 | Amount of credit of Rs. 120074.00 for retrived old material as mentioned in Schedule \"A\" section-II of tender document in pdf form, will be deducted offline while acceptence of tender. |