| 1 | Cleaning of blocked sewage line of 100 mm boreby rodding from one Manholeto next Manholeand washing through withfresh water including removing all sludge fromthe sewage line and man hole including removing existing Manholecover and refixing properly after cleaningandshall be removed all sludge outside MD land complete all as specified and as directed by Engineer-in-Charge. |
| 2 | All all as per item No 1.00 here-in- before but sewage line of 150 mm borecomplete all as specified and as directed by Engineer-in-Charge. |
| 3 | All all as per item No 1.00 here-in- beforebut sewage line of 200 mm bore complete all as specified and as directed by Engineer-in-Charge. |
| 4 | Notes for serial item no.1.00, 2.00& 3.00 : 1. Arrangement for removal of all sludge outside MD Landthrough transport or by other means shall be arrangmed by the contracor at his owncost.The rate quoted by contractor of this aspects is included in this item and nothing shall be paid extra on this account.2. Rod for cleaning of sewage line and water for cleaning shall be provided by contractor at his own cost and ownarrangments. The rate quoted by contractorof these aspects is included in this item andnothing shall be paid extra on lthis account. |
| 5 | Cleaning of Manholeof any description of size not exceeding 1.5 Mtr indepth including lifting up and removing sludge and accumulated/ semi solid sludge and other foreign material with trailor mounted sewage cleaning pumps/mechanical devices and removing to a distange not exceeding 250 mtrwhere as directed by Engineer- in- charge & washing down with water for smooth function of sewage complete all as specified and as directed by Engineer-in-Charge. |
| 6 | All as per item No 4.00 here-in-beforebut Manhole exceeding 1.5 Mtr depth & notexceeding2 Mtrcomplete all as specified and as directed by Engineer-in-Charge. |
| 7 | Notes for serial item no.4.00 & 5.00:1. Trailor mounted sewage cleaning pumps/mechanical devices shall be provided by the contractor at his own cost and own arrangments and the rate quoted by contractor of these aspects is incuded in this item . Nothing shall be paid extra on this account.2 The rate of removing of sludge, semi solid sludge and other foreign material removing to a distance not exceeding 250mtr shall be removed by the contractor throughtransportation or by other means at his own cost and own arrangment and the rate quoted by contractor of these aspects isincluded in this item . Nothing shall be extra paid on this account.3. Water for cleaning shall be provided by contractor at his own cost and ownarrangments. The rate quoted by contractorof this aspect is included in this item andnothing shall be paid extra on lthis account. |
| 8 | Cleaningof septic tankof 500 users capacity by bailing out water, removing sludge dust mud & other accumulated solids, semi solids etc. including cleaning& sewage sludge and other materials shall be removed / deposited out side the MD land complete all as specified and as directed by Engineer-in-Charge. |
| 9 | All as per item No 6 above but septic tank of 100 user capacity complete all as specified and as directed by Engineer-in-Charge. |
| 10 | Notes for serial item no.6.00 & 7.00 : 1. Arrangement for removal , deposited of all sludge outside MD Landthrough transport or by other means shall be arrangmed by the contracor at his owncost.The rate quoted by contractor of this aspect is included in this item and nothing shall be paid extra on this account.2. Water for cleaning shall be provided by contractor at his own cost and ownarrangments. The rate quoted by contractor of this aspect is included in this item andnothing shall be paid extra on lthis account. |
| 11 | Removal of blockage from WC by using rubber cup 125mm dia with wooden handle and clearing the blockage upto manhole with cleaning rod including removal of all materials from P trap of WC (qtrs from ground floor to 3rd floor) complete all as specified and as directed by Engineer-in-Charge. |
| 12 | Removal of blockage from kitchen / bathroom / WHB by using rubber cup 125mm dia and clearing the blockage upto gully trapswith cleaning rod including removal of all materials from floortrap including dismantling and refixing of gratings (qtrs from ground floor to 3rd floor) complete all as specified and as directed by Engineer-in-Charge. |
| 13 | Notes for serial item no.8.00 & 9.00 :1.00 Rubber cup of125mm dia and cleaning rodshall be provided by contractor at his own cost and ownarrangments. The rate quoted by contractorof these aspects is included in this item andnothing shall be paid extra on lthis account. |
| 14 | Demolition of reinforced cement concrete cover slab ofManhole / Spetic tank and removing the debris to a distance not exceeding 500 Mtr complete all as specified and as directed by Engineer-in-Charge. Note: The rate of removing the debris to a distance not exceeding 500 Mtr is included in this item and nothing shall be paid extra on this account. |
| 15 | Material& Labour forPrecast Cement Concrete 1:2:4 type B-1 using 20 mm graded stone aggregatefor cover slab of Man holes/Septic tank set in CM 1:4 complete all as specified and as directed by Engineer-in-Charge. Note: The rate of form work is included in this item nothing shall be paid extra on this account. |
| 16 | Material& Labour for10 mm diaand over TMTbar cut to length, bend to shape required incl cranking bending & hooking ends & binding with and including MS binding wire annealednot. less 0.9mm dia complete all as specified and as directed by Engineer-in-Charge. Note: The rate of binding wire is included in this item and nothing shall be paid extra on this account. |
| 17 | Demolition of brickor stone / boulders msonary, built in cement morter complete all as specified and as directed by Engineer-in-Charge. |
| 18 | M&L forbrick work withburnt clay sub class ‘B’bricks, straight or curved on plan exceeding 6m mean radius in Cement Mortar1:4 complete all as specified and as directed by Engineer-in-Charge. |
| 19 | Material& Labour for rendering 15 mm thick inCement Mortar1:4 on brick or concrete surfacesand finished even and smooth without using extra cement complete all as specified and as directed by Engineer-in-Charge. |
| 20 | Excavating in trenches, notexceeding 1.5 mtrwide and notexceeding1.5 mtrin depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard/ dense soil complete all as specified and as directed by Engineer-in-Charge. |
| 21 | Ditto as per serialitem no 17 here-in-beforebut notexceeding 1.5 mtrwide, exceeding1.5mtr and not exceeing3mtr in depth complete all as specified and as directed by Engineer-in-Charge. |
| 22 | Demolition and breaking up drain pipes , 200 mm dia (Salt glazed stone ware, AC or Reinforced concrete) set in cement mortar complete all as specified and as directed by Engineer-in-Charge. |
| 23 | All as per item No 18 here-in-beforebut 150 mm dia complete all as specified and as directed by Engineer-in-Charge. |
| 24 | Material and labour for PCC (1:4: 8) type D-2 using 40 mm graded stone aggregates as in concrete bed fordrain pipes of 200 mm bore, laid to required slope including packing under and haunchingagainst the sides of pipes after they are laid and tested including form work complete all as specified and as directed by Engineer-in-charge. Note :-(i) Thickness of concrete bed below the barrel of pipe shall be 15 cm. (ii) Width of concrete bed shall be outer diameter of drain pipes (not of sockets / collar) plus 30cm.(iii)Excavation , earth work , returning filling shall be measured and paid seperately under appropriate items of schedule \"A\" BoQ. |
| 25 | Material and labour for PCC (1:4: 8) type D-2 using 40 mm graded stone aggregates as in concrete bed fordrain pipes of 150 mm bore, laid to required slope including packing under and haunchingagainst the sides of pipes after they are laid and tested including form work complete all as specified and as directed by Engineer-in-charge. Note :-(i) Thickness of concrete bed below the barrel of pipe shall be 10 cm. (ii) Width of concrete bed shall be outer diameter of drain pipes (not of sockets / collar) plus 30cm.(iii)Excavation , earth work , returning filling shall be measured and paid seperately under appropriate items of schedule \"A\" BoQ. |
| 26 | Material & Labour forSalt galzed Stone Ware drain pipe , grade \"A\"of 200mm dia ,laid in trenches and jointed including all accessories & fittings complete all as specified and as directed by Engineer-in-Charge. Note:Excavation , earth work , returning filling shall be measured and paid seperately under appropriate items of schedule \"A\" BoQ. |
| 27 | Material & Labour forSalt galzed Stone Ware drain pipe , grade \"A\"of 150mm dia ,laid in trenches and jointed including all accessories & fittings complete all as specified and as directed by Engineer-in-Charge. Note:Excavation , earth work , returning filling shall be measured and paid seperately under appropriate items of schedule \"A\" BoQ. |
| 28 | Returning filling in including spreading, levelling , watering and well ramming n exc. 25 cm in layers in any type of soil complete all as specified and as directed by Engineer-in-Charge. |
| 29 | Removal of excavated surplus (soils) at a distance not exceedin 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and as directed by Engineer-in-Charge. |
| 30 | Material & Labour for Cutting into existing manhole for connecting new drain making good to pipe and rendering cutting out existing benching for and forming branch channel(1/2 round or 3/4 section) in cement conc. 1:2:4 type B-1 using 20mm graded stone aggregates smooth finished and reforming benching as requiredfor 150mm dia of pipe complete all as specified and as directed by Engineer-in-Charge. |
| 31 | Notes for serial item no.1.00 to 26.00 of BoQ:-1. All precautions to be taken by all workers while working in foul condition. Contractor shall make necessary arrangments while carryout the work and take all necessary precautions to avoid any mishappening as directed by Engineer-in-charge .2. The contractor shall obtain and maintain , at his own cost, an insurance policy under the Workmen\"s compensation Act,1923, or Employee\"s Compensation Act, as applicale, and any other statutory requirements, for all workers employed by him on the site. This policy shall cover all liabilities of the contractor arising out of injury,disability, or death of workers during the course of employment. The insurance must be valid for the entire duration of the contract and proof of the same shall be submitted to the Engineer-in-charge before commencment of work.Nothing shall be paid extra on this account. |