| 1 | Routine maintenance and repairs of Solar Water Heating System including cleaning of complete Solar Panels installed at terrace of PN Mess of capacity 1000 Ltrs per day- 1 No, at terrace of NO Mess of Capacity 1000 Ltrs per day- 1 No , at terrace of patient Galley of capacity 1000 Ltrs per day- 1 No , at 40 Single Offrs Accn of capacity 1000 LPD per day - 02 Nos &at Deficient Single Living Nursing Officers Accn of capacity 1000 LPD per day - 02 Nos& at terrace of Sailor Galley of capacity 1000 Ltrs per day - 1 No consisting of solar panels withaccessories, Hot water tank withcontrols, entire pipe lines withvalves by providingtechnician/mechanic for all repairs including repairing electrical backup system of auto functioning for smoothfunctioning of the system, bracing tubes, joints including replacing washers, gaskets, toughened tempered glass 4mm thick ( if existing glass is broken),air release valves nuts & bolts etc.complete all as specified and as directed by Engineer-in-Charge.Note:- Complete Solar system shall be checked and cleaned twice a week for proper functioning.Cost of spare parts/material , man power required for above mentioned maintenance is deemed to be included in quoted rate.No additional cost of spare parts is admissible for the above maintenance. |
| 2 | Repairs to 3 Phase Solar water Heater control panel of capacity230V, 50 Hz, having provision for Start/Stop switch ,RYB indicators, Auto Manual switch,MCBs, contactos with Control wiring complete all as specified and directed by Engineer- in -charge. |
| 3 | S&F 25 mm bore GI tubing medium grade withall fittings such as bends, socket, tee, elbows, union, barrel, nipple, plugs etc fixed to walls and ceilings or laid infloors withsuitable size GI clamps including taking downoldGI tubing including fittings complete all as specified. |
| 4 | -Ditto- all as per item No 3.00 abovebut20 mm bore |
| 5 | S & F in repairs gun metal gate valves with iron wheel head, (ISI marked)screwed bothends for iron pipe of 50 mm bore size complete all as specified. |
| 6 | -Ditto- all as per item No 5.00 above but 40 mm bore |
| 7 | -Ditto- all as per item No 5.00 above but 25 mm bore |
| 8 | -Ditto- all as per item No 5.00 above but 20 mm bore |
| 9 | Supply, install, testing and commissioning of solar panel flat plate collector type based on direct transfer of heat of capacity 125 LPD, producing temperature upto 80 degree centigradeincluding fixing arrangement and providing connections as per existing including distmantling existing Solar Panel of any capacity complete all as specified and as directed by Engineer-in-Charge. |
| 10 | M&L PCC 1:2:4, type B-1 (using 20 mm graded stone aggregate) as in bed blocks/ pedestals for support of water tank staging support, solar panel supports including necessary formwok complete all as specified. |
| 11 | M & L for rolled mild steel in joist,channel,angle or tee sections in framework for staging of water tank, solar panel etc including all necessory drilling, bolting,riveting or welding conforming to Fe-290 (Gde E-165) and embeding the supportin PCC bed block on roof top with suitable size FI hold fast including dismantling carefully existing staging complete all as specified.Note -The staging for water tank/solar panel shall be embedded in PCC block provided over RCC slab. No drilling in RCC slab shall be allowed for fixing staging and any damage due to any reason shall be made good by the contractor at his own cost. |
| 12 | S&F Rotational moulded polyethylene water storage tank capacity 1000 ltrs (cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part I. |
| 13 | S & F in repairs heatingelement heavy duty of capacity 3KW , 220 V, 50HZ, thermostat control of temperature outdoor panel including necessary indication lamps for various parameters including wiring from hot water tank to control panel with copper conductor cable of suitable size conforming to IS:4159complete all as specfied and directed. |
| 14 | Material and labour for rewinding of motors upto 1hp connected to solars for water lifting including greasing, removing worn bearings, shaft alignement etc all as site requirement complete all as specified and directed by Engineer in charge |
| 15 | Material and labour for replacement of evacuated tubes of solar water heater having capacity as per site requirement complete all as specified and directed by Engineer in charge |