Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | M&L for Repair / Servicing / Maint of Centrifugal Pump Sets installed at Shapur/AFA for smooth operation of Pump Sets and ensuring the serviceability with & including replacement of any minor spares like gland packing, gaskets, O Rings, Keys, nuts, bolts, washers etc. for the following capacities / models / makes. The contractor to ensure that the parts/ spares considered as replacement must be brought from the OEM / Auth Supplier / Dealer for serviceability of the Pumps complete all as specified and as directed to the entire satisfaction fo the Engr-In-Charge. |
| 2 | 150 HP capacityModel DSM-6, Kirloskar make Centrifugal Pump Set installed at HMT Pump House No 1. |
| 3 | 100 HP capacityModel 125/40, Kirloskar make Centrifugal Pump Set installed at AFA pump House No 2. |
| 4 | 90 HP capacityModel 125/40, Kirloskar make Centrifugal Pump Set installed at AFA pump House No 2. |
| 5 | 5 HP capacity, Model DV 40, Kirloskar make Vacuum Pump Set. |
| 6 | The following Pump Maintenance has to be carried out for Item No 1.01 to 1.04 |
| 7 | Checking of all the moving parts and lubricating the same with grease. |
| 8 | Checking the serviceability of gland coupling, gland packing and replacing the same if damaged etc. to arrest leakage. |
| 9 | Checking of serviceability of pressure gauges etc. |
| 10 | Arresting all water leakages to prevent water losses. |
| 11 | Checking and tightening of coupling alignment. |
| 12 | Removing the unsv spares and fixing with new spares including testing etc. |
| 13 | The following MotorMaintenance has to be carried out for Item No 1.01 to 1.04 |
| 14 | Checking the lubricant in the bearing and greasing if required. |
| 15 | Checking and tightening of cable lugs / connections if found loose. |
| 16 | Cleaning the slip rings / brushes etc. and replacing the same if required. |
| 17 | Checking of motor efficiency and also ensure that no abnormal sound is coming from motor and checking alignment also. |
| 18 | Removing the unsv spares and fixing with new spares including testing etc. |
| 19 | Important Notes for Item Nos 1.00 to 1.04 : |
| 20 | (a) Unit rates quoted for Item Nos 1.01 to 1.04 is deemed to be inclusive of removing the unsv spares and fixing of new ones incl testing complete all as specified and as directed to the entire satisfaction fo the Engr-In-Charge. |
| 21 | (b) The major spares required for Pump & Motor will be measured and paid separately under respective items as supply only. |
| 22 | (c) Expendable stores like cotton waste / cleaning materials, lubricants, gland packing, gaskets, O rings, Keys materials etc. and transportation to and from site to work shop etc. is deemed to be included in the unit quoted rates. |
| 23 | (d) The contractor should ensure that any complaint / breakdown of pumps / motors has to be attended within 24 hrs from the time of intimation/reporting about the same either by telephonic or electronic mode by deploying skilled tradesman. During urgent / emergent cases information/ intimation about the breakdown will be conveyed to the Contractor through Telephonic/ Electronic modes only & the same shall be treated as an Official Intimation. In the event of any delay beyond above mentioned tiime limit without prior intimation or genuine cause, penalty at the rate of twice the quoted rate for each un-attended complaint / breakdown shall be recovered. |
| 24 | (e) The contractor / firm is required to visit the site prior to quoting of the subject items/ work so as to ascertain the actual ground requirements. Any further query at a later date shall not be entertained & responsibility of the same shall rest on the contractor/ firm. |
| 25 | (f) Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates. |
| 26 | M&L for repairs of Oil Immersed Slipring / Star Delta Starter installed at Shapur / AFA Pump House for smooth operation of the Pump Sets by opening up servicing & repairing etc. and with & including replacement of any spares required for operation of the Slipring / Star Delta Starter like nuts, bolts, washers, checking the alignment of contacts, Contactors, Wirings & connecting up the electric connections, refixing etc. for the following capacities / models / makes. The contractor to ensure that the parts/ spares considered as replacement must be brought from the OEM / Auth Supplier / Dealer for serviceability of the Oil Immersed Slipring / Star Delta Starter complete all as specified and as directed to the entire satisfaction fo the Engr-In-Charge.Note : Starter will be maintained for smooth operation with the existing components, any components found defective will be replaced and paid under relevant items. |
| 27 | Star Delta Starter suitable for 150 HP Pump Set capacity. Make : Kilburn/MEI installed at HMT Pump House No 1. |
| 28 | Star Delta Starter suitable for 100 HP Pump Set capacity. Make : Kilburn/MEI installed at AFA Pump House No 2. |
| 29 | Oil Immersed Slipring Starter suitable for 90 HP Pump Set capacity.Make : Kilburn/MEI installed for AFA Pump House No 2. |
| 30 | Important Notes for Item Nos 2.00 to 2.03 : |
| 31 | (a) Unit rates quoted for Item Nos 2.01 to 2.03 is deemed to be inclusive of removing the unsv spares and fixing of new ones incl testing complete all as specified and as directed to the entire satisfaction fo the Engr-In-Charge. |
| 32 | (b) The major spares required will be measured and paid separately under respective items as supply only. |
| 33 | (c) Expendable stores like cotton waste / cleaning materials, lubricants, gland packing, gaskets, O rings, Keys materials etc. and transportation to and from site to work shop etc. is deemed to be included in the unit quoted rates. |
| 34 | (d) The contractor should ensure that any complaint / breakdown etc. has to be attended within 24 hrs from the time of intimation/reporting about the same either by telephonic or electronic mode by deploying skilled tradesman. During urgent / emergent cases information/ intimation about the breakdown will be conveyed to the Contractor through Telephonic/ Electronic modes only & the same shall be treated as an Official Intimation. In the event of any delay beyond above mentioned tiime limit without prior intimation or genuine cause, penalty at the rate of twice the quoted rate for each un-attended complaint / breakdown shall be recovered. |
| 35 | (e) The contractor / firm is required to visit the site prior to quoting of the subject items/ work so as to ascertain the actual ground requirements. Any further query at a later date shall not be entertained & responsibility of the same shall rest on the contractor/ firm. |
| 36 | (f) Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates. |
| 37 | Supply only the following spares for the above mentioned Pump Sets / Motors mentioned at Item No 1.01 to 1.04. Make : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 38 | Liquid Deflector of suitable size and type (As per Existing) for 150 HP P/set. |
| 39 | Liquid Deflector of suitable size and type (As per Existing) for 100 HP P/set |
| 40 | Cast Iron Stuffing Box Bush of suitable size and type (As per Existing) for 150 HP P/Set |
| 41 | Cast Iron Stuffing Box Bush of suitable size and type (As per Existing) for 100 HP P/Set |
| 42 | Cast Iron Inter Stage Ring of suitable size and type (As per Existing) for 90 HP P/Set |
| 43 | Cast Iron Gland Coupling of suitable size and type (As per Existing) for 90 HP P/Set |
| 44 | Bronze Lantern Ring of suitable size and type (As per Existing) for 90 HP P/Set |
| 45 | Liquid Deflector of suitable size and type (As per Existing) for 90 HP P/Set |
| 46 | CS Round Lock Nut of suitable size and type (As per Existing) for 90 HP P/Set |
| 47 | Cast Iron Stuffing Box Bush of suitable size and type (As per Existing) for 90 HP P/Set |
| 48 | Bearing of suitable size and type (As per Existing) for 90 HP Motor at :- |
| 49 | NDE |
| 50 | DE |
| 51 | Bearing of suitable size and type (As per Existing) for 90 HP Pump at :- |
| 52 | NDE |
| 53 | DE |
| 54 | Bearing of suitable size and type (As per Existing) for 100 HP Motor at :- |
| 55 | NDE |
| 56 | DE |
| 57 | Bearing of suitable size and type (As per Existing) for 100 HP Pump at :- |
| 58 | NDE |
| 59 | DE |
| 60 | Bearing of suitable size and type (As per Existing) for 150 HP Motor at :- |
| 61 | NDE |
| 62 | DE |
| 63 | Bearing of suitable size and type (As per Existing) for 150 HP Pump at :- |
| 64 | NDE |
| 65 | DE |
| 66 | Slip Ring of suitable size and type (As per Existing) for 90 HP P/Set |
| 67 | Carbon bush holders of suitable size and type (As per Existing) for 150 HP P/Set |
| 68 | Carbon bush holders of suitable size and type (As per Existing) for 90 HP P/Set |
| 69 | Carbon bush of suitable size and type (As per Existing) for 150 HP P/Set |
| 70 | Carbon bush of suitable size and type (As per Existing) for 90 HP P/Set |
| 71 | Supply only the following spares for the above mentioned Star Delta Starters mentioned at Item No 2.01 to 2.02. Make : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 72 | Contactor MNX 185 (As per Existing) for 150 HP P/Set |
| 73 | Contactor MNX 110 (As per Existing) for 100 HP P/Set |
| 74 | Thrermal Over Load Relay MN 12 range (As per Existing) for 150 HP P/Set |
| 75 | Thrermal Over Load Relay MN 12 range (As per Existing) for 100 HP P/Set |
| 76 | IMPORTANT NOTES FOR ITEM NOS 4.00 TO 4.04 : 1) Design / drawing / Technical specifications etc. of the items is to be obtained from OEM strictly keeping in view the actual ground/site requirement & the same is to be got approved from Engr-In-Charge before placing final order to the manufacturer whereever equivalency of item/make/model ref is concerned. |
| 77 | 2) Anything missed out in the technical specifications but technically required for efficient working of the existing system is deemed to be included in the quoted rates. |
| 78 | Supply only the following spares for the above mentioned Slipring Starters mentioned at Item No 2.03. Make : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 79 | Moving ‘U’ Contact (small) (As per Existing) for 90 HP P/Set |
| 80 | Moving ‘U’ Contact (big) (As per Existing) for 90 HP P/Set |
| 81 | Fixed Contact Triangular type (As per Existing) for 90 HP P/Set |
| 82 | Fixed Contact Thumb type (As per Existing) for 90 HP P/Set |
| 83 | No Volt Coil Assembly (As per Existing) for 90 HP P/Set |
| 84 | Resistance Coil for (As per Existing) 90 HP P/Set |
| 85 | \"Important Notes for Item Nos 5 :(a) Expendable stores like cotton waste / cleaning materials, lubricants, gland packing, gaskets, O rings, Keys materials etc. and transportation to and from site to work shop etc. is deemed to be included in the unit quoted rates.(b) The contractor should ensure that any complaint / breakdown etc. has to be attended within 24 hrs from the time of intimation/reporting about the same either by telephonic or electronic mode by deploying skilled tradesman. During urgent / emergent cases information/ intimation about the breakdown will be conveyed to the Contractor through Telephonic/ Electronic modes only & the same shall be treated as an Official Intimation. In the event of any delay beyond above mentioned tiime limit without prior intimation or genuine cause, penalty at the rate of twice the quoted rate for each un-attended complaint / breakdown shall be recovered.(c) The contractor / firm is required to visit the site prior to quoting of the subject items/ work so as to ascertain the actual ground requirements. Any further query at a later date shall not be entertained & responsibility of the same shall rest on the contractor/ firm.(d) Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates.(e) Design/Drawing/Technical catalogue/specifications/BOM/Make/Sample etc. to be submitted to the Engr-In-Charge/GE for Make/Sample approval of items before placing final order to the Manufacturer/Supplier.(f) Purchase Vouchers & Necessary test certificates incl Guarantee/Warranty Cerificates from the OEM etc. to be submitted in Original to the Engr-in-Charge for checking & record. |
| 86 | M&L for disconnecting of the suction and delivery pipe lines and electric connections of centrifugal / Monoblock / Vaccum Pump Sets, Single / Multistage etc. and removing it from its existing position carefully and transporting the same to the work shop, dismantling / opening up the pump and motor for inspection, repairs / replacing the worn out unserviceable parts with new ones including cleaning, lubricating, replacing the minor items / spares like, necessary packing materials, studs, nuts, bolts, washers etc. & reassembling the Pump Sets including painting with two coats of synthetic enamel paint of approved grade / colour, transporting back and refixing the same in its original position including connecting up the water and electric connections, commissioning & testing complete all as specified and as directed to the entire satisfaction fo the Engr-In-Charge for the following capacities / type : |
| 87 | Pump Set of capacity 1HP / 1.5HP / 2HP, 3 phase, 415 volts |
| 88 | Pump Set of capacity 5HP, 3 phase, 415 volts |
| 89 | Pump Set of capacity 10HP, 3 phase, 415 volts |
| 90 | Pump Set of capacity 20HP, 3 phase, 415 volts |
| 91 | \"Important Notes for Item Nos 6 :(a) Unit rates quoted for Item Nos 6 is deemed to be inclusive of removing the unsv spares and fixing of new ones incl testing complete all as specified and as directed to the entire satisfaction fo the Engr-In-Charge.(b) The major spares required for Pump Sets will be measured and paid separately under respective items as supply only.(c) Expendable stores like cotton waste / cleaning materials, lubricants, gland packing, gaskets, O rings, Keys materials etc. and transportation to and from site to work shop etc. is deemed to be included in the unit quoted rates.(d) The contractor should ensure that any complaint / breakdown of Pump Sets has to be attended within 24 hrs from the time of intimation/reporting about the same either by telephonic or electronic mode by deploying skilled tradesman. During urgent / emergent cases information/ intimation about the breakdown will be conveyed to the Contractor through Telephonic/ Electronic modes only & the same shall be treated as an Official Intimation. In the event of any delay beyond above mentioned tiime limit without prior intimation or genuine cause, penalty at the rate of twice the quoted rate for each un-attended complaint / breakdown shall be recovered.(e) The contractor / firm is required to visit the site prior to quoting of the subject items/ work so as to ascertain the actual ground requirements. Any further query at a later date shall not be entertained & responsibility of the same shall rest on the contractor/ firm.(f) Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates.\" |
| 92 | Supply only the following spares for the above mentioned Pump Sets mentioned at Item No 40 to 44. Make : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 93 | Supply only CI / Gun Metal Bushes for 1/1.5/2 HP Centrifugal P/Set |
| 94 | Supply only CI / Gun Metal Bushes for 5 HP Centrifugal P/Set |
| 95 | Supply only CI / Gun Metal Bushes for 10 HP Centrifugal P/Set |
| 96 | Supply only CI Impeller for 1/1.5/2 HP Centrifugal P/Set |
| 97 | Supply only CI Impeller for 5 HP Centrifugal P/Set |
| 98 | Supply only CI Impeller for 10 HP Centrifugal P/Set |
| 99 | Supply only bearing of suitable size and type for motor of 1/1.5/2 HP Centrifugal P/Set at :- |
| 100 | NDE |
| 101 | DE |
| 102 | Supply only bearing of suitable size and type for motor of 5 HP Centrifugal P/Set at :- |
| 103 | NDE |
| 104 | DE |
| 105 | Supply only bearing of suitable size and type for motor of 10 HP Centrifugal P/Set at :- |
| 106 | NDE |
| 107 | DE |
| 108 | Supply only CI Gland Coupling for 1/1.5/2 HP Centrifugal P/Set |
| 109 | Supply only CI Gland Coupling for 5 HP Centrifugal P/Set |
| 110 | Supply only CI Gland Coupling for 10 HP Centrifugal P/Set |
| 111 | M&L for repairs to 1/1.5/2 HP, 3 Phase, 415 Volts Induction motor by taking down the burnt out winding from motor, cleaning and rewinding with super enameled copper wire of the same guage and same number of turns as per existing, reassembling the same, painting with one coat of synthetic enamel paint over a coat of red oxide primer after preparation of old existing surfaces incl testing complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. |
| 112 | Description all as per item No 65.00 above but for 5 HP, 3 Phase, 415 Volts |
| 113 | Description all as per item No 65.00 above but for 10 HP, 3 Phase, 415 Volts |
| 114 | Description all as per item No 65.00 above but for 20 HP, 3 phase, 415 Volts |
| 115 | IMPORTANT NOTES FOR ITEM NOS :11.00 TO 14.00 : In the event of any fault / burning etc. issues occuring within six months of rewinding / repairing, the contractor will get the same repaired / rectified free of cost & no extra amount will be given for this account. Cost of transportation to & fro is deemed to be included in the unit quoted rates. Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates. |
| 116 | M&L for taking down of the worn out coupling from P/Set of capacity 150 HP of Make : KIRLOSKAR, Model : DSM-6 & S&F coupling made out of MS duly drilled including suitable rubber bushes with inner brass & nuts, bolts, keys etc and necessary lathe work to match with the existing shaft/system etc. and refixing the same complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. |
| 117 | Description all as per item No 12.00 above but for P/Set of capacity 90 HP of Make : KIRLOSKAR, Model : 125/40 complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. |
| 118 | Supply and filling Transformer oil conforming to IS : 335 in the Slipring Starter at Pump House No 2 complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. Make : Savita Oil / APAR Industries / Power Oil |
| 119 | M&L for disconnecting the water & electric connections and taking out the Submersible P/Set alongwith 32/50/65/80mm dia GI Column Pipes, fittings, Submersible cables etc. from existing bore well for servicing/repairing of P/Set / flushing of bore well including lowering back the Submersible P/Set after carrying out necessary repairs/replacement of spares to the existing / original depth after connecting up of all electrical and water connections, testing and commissioning of the P/Set for satisfactory operation on its full load complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge for the following capacity :- |
| 120 | 1.5 HP capacity |
| 121 | 5 HP to 6 HP capacity |
| 122 | 7.5 HP capacity |
| 123 | 10 HP to 12.5 HP capacity MPORTANT NOTES FOR ITEM NOS : 18: Cost of new Column Pipes, Submersible Cables, repairing of P/Sets, Flushing of Borewell shall be measured & paid separately under relevant items. Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates. |
| 124 | M&L for flushing of bore well of 150mm dia using compressed air from air compressor of appropriate / approved capacity incl removal of obstacles / debris etc.until clear water is available / coming out from the tube well up to a depth of 100 running meters complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. |
| 125 | Description all as per item above but for a depth exceeding 100 running meter and not exceeding to 200 running meter.IMPORTANT NOTES FOR ITEM NOS 78.00 & 79.00: Unit rate quoted is deemed to be inclusive of clearing the bushes / making arrangements to facilitate approach of the vehicle mounting the Air Compressor etc. upto the bore well to the required extent for successful completion of the work / job. Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates. |
| 126 | M & L for cutting of unserviceable / corroded threaded portion of GI Column Pipe of 32/40/50/65/80mm bore & transporting to the workshop and getting machine cut threads and transporting back to site complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge for the following sizes : |
| 127 | 32/40 mm bore |
| 128 | 50 mm bore |
| 129 | 80 mm bore |
| 130 | M&L for galvanised steel water tubing, ISI Marked, heavy grade, 50 mm bore with all running fittings etc. incl testingcomplete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. MAKE : Tata/Jindal/Prakash. |
| 131 | Description all as per itemabove but 40 mm bore |
| 132 | Description all as per item above but 32 mm bore |
| 133 | S&F GI coupler, heavy duty, ISI marked, 100 mm long of32/40 mm bore complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. |
| 134 | S&F GI coupler, heavy duty, ISI marked, 100 mm long of50 mm bore complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. |
| 135 | M&L for Submersible cable, PVC insulated, PVC sheathed 1100 volts grade, multistranded copper conductor, flat, 3 core, 4.0 Sqmm complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. Make : Havells/Polycab/Finolex/KEI |
| 136 | M&L for Submersible cable, PVC insulated, PVC sheathed 1100 volts grade, multistranded copper conductor, flat, 3 core, 6.0 Sqmm complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. Make : Havells/Polycab/Finolex/KEI |
| 137 | M&L for dismantling, opening the pump and motor of the following capacities of Submersible P/Sets for repairs and reassembling the pump and motor as per the original assembly after repairs/replacement of the worn out unserviceable spare parts with new ones as ordered including cleaning, replacing the minor items like packing, nuts, bolts, washers, MS clamps etc. & making the pump and motor fully serviceable including metal filling, machining work etc. and testing after refixing and commissioning complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge for satisfactory operation of the following : |
| 138 | 1 to 2 HP capacity |
| 139 | 5 HP to 6 HP capacity |
| 140 | 7.5 HP capacity |
| 141 | 10 HP to 12.5 HP capacity Note : Pipe cable/repairs of Pump set etc will be measured and paid separately |
| 142 | \"Important Notes for Item Nos 27 :(a) Unit rates quoted for Item Nos 24.01 to 24.04 is deemed to be inclusive of removing the unsv spares and fixing of new ones incl testing complete all as specified and as directed to the entire satisfaction fo the Engr-In-Charge.(b) The major spares required for Pump Sets will be measured and paid separately under respective items as supply only.(c) Expendable stores like cotton waste / cleaning materials, lubricants, gland packing, gaskets, O rings, Keys materials etc. and transportation to and from site to work shop etc. is deemed to be included in the unit quoted rates.(d) The contractor should ensure that any complaint / breakdown of Pump Sets has to be attended within 24 hrs from the time of intimation/reporting about the same either by telephonic or electronic mode by deploying skilled tradesman. During urgent / emergent cases information/ intimation about the breakdown will be conveyed to the Contractor through Telephonic/ Electronic modes only & the same shall be treated as an Official Intimation. In the event of any delay beyond above mentioned tiime limit without prior intimation or genuine cause, penalty at the rate of twice the quoted rate for each un-attended complaint / breakdown shall be recovered.(e) The contractor / firm is required to visit the site prior to quoting of the subject items/ work so as to ascertain the actual ground requirements. Any further query at a later date shall not be entertained & responsibility of the same shall rest on the contractor/ firm.(f) Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates.\" |
| 143 | Supply only the following spares for the above mentioned Pump Sets mentioned at Item No 92 Make : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 144 | Thrust bearing set |
| 145 | Neck ring for stage casing |
| 146 | Middle sleeve |
| 147 | Impeller |
| 148 | Diffuser |
| 149 | Shaft |
| 150 | CI NRV unit |
| 151 | Bush for LBH/UBH |
| 152 | Coupling bush |
| 153 | Supply only the following spares for the above mentioned Pump Sets mentioned at Item No 92 Make : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 154 | Thrust bearing set |
| 155 | Neck ring for stage casing |
| 156 | Middle sleeve |
| 157 | Impeller |
| 158 | Diffuser |
| 159 | Shaft |
| 160 | CI NRV unit |
| 161 | Bush for LBH/UBH |
| 162 | Coupling bush |
| 163 | Supply only the following spares for the above mentioned Pump Sets mentioned at Item No 92 Make : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 164 | Thrust bearing set |
| 165 | Neck ring for stage casing |
| 166 | Middle sleeve |
| 167 | Impeller |
| 168 | Diffuser |
| 169 | Shaft |
| 170 | CI NRV unit |
| 171 | Bush for LBH/UBH |
| 172 | Coupling bush |
| 173 | Supply only the following spares for the above mentioned Pump Sets mentioned at Item No 92 Make : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 174 | Thrust bearing set |
| 175 | Neck ring for stage casing |
| 176 | Middle sleeve |
| 177 | Impeller |
| 178 | Diffuser |
| 179 | Shaft |
| 180 | CI NRV unit |
| 181 | Bush for LBH/UBH |
| 182 | Coupling bush |
| 183 | S&F Gun Metal Non Return Valve, ISI marked with flanged and connecting to CI/GI pipe of size 50 mm bore including jointing materials, nuts, bolts, washers and necessary accessories incl testing & taking down old unsv one etc. complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. Make : Kirloskar/Leader/Upadhyay/Kartar/RMCO |
| 184 | S&F Gun Metal Non Return Valve, ISI marked with flanged and connecting to CI/GI pipe of size 40 mm bore including jointing materials, nuts, bolts, washers and necessary accessories incl testing & taking down old unsv one etc. complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. Make : Kirloskar/Leader/Upadhyay/Kartar/RMCO |
| 185 | Supply, install, commissioning & testing of Star Delta Starter with SS enclosure, fully automatic, 3 phase, 415 Volts, 50 Hz suitable for moror of upto 20 HP capacity perfectly matching with the existing system complete with O/V, U/V, O/L, SPP etc. safety features incl taking down unsv one complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. Make : L&T/ABB/SIEMENS/BCH/SCHNEIDER |
| 186 | Supply, install, commissioning & testing of DOL Starter with SS enclosure, 3 phase, 415 volts, 50 Hz suitable for motor of upto 5 HP capacity perfectly matching with the existing system with & including necessary safety features incl taking down unsv one complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. Make : L&T/ABB/SIEMENS/BCH/SCHNEIDER |
| 187 | Supply, install, commissioning & testing of Single Phase Preventor with manual and automatic operation suitable upto 15 HP capacity P/Set incl taking down unsv one complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. Make : L&T/ABB/SIEMENS/BCH/SCHNEIDER/MINILAC |
| 188 | \"IMPORTANT NOTES FOR ITEM NOS 33 TO 38 : 1) Design / drawing / Technical specifications etc. of the items is to be obtained from OEM strictly keeping in view the actual ground/site requirement & the same is to be got approved from Engr-In-Charge before placing final order to the manufacturer whereever equivalency of item/make/model ref is concerned.2) Anything missed out in the technical specifications but technically required for efficient working of the existing system is deemed to be included in the quoted rates.\" |
| 189 | M&L for rewinding of motor of Submersible P/Set by cleaning and rewinding with super enamelled copper wire of the same gauge and same number of turns as existing including taking down the burnt out winding, reassembling the same, painting the P/Set with one coat of synthetic enamel paint over a coat of red oxide primer after preparation of old existing surfaces incl testing complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge. for the following capacity : |
| 190 | 1.5 to 3 HP Capacity |
| 191 | 5 HP to 6 HP Capacity |
| 192 | 7.5 HP Capacity |
| 193 | 10 to 12.5 HP CapacityIMPORTANT NOTES FOR ITEM NOS : 39 : In the event of any fault / burning etc. issues occuring within six months of rewinding / repairing, the contractor will get the same repaired / rectified free of cost & no extra amount will be given for this account. Cost of transportation to & fro is deemed to be included in the unit quoted rates. Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates. |
| 194 | S&F Gun metal gate valve conforming to IS 781 -1984 with iron wheelhead screwed both ends for iron pipe incl testing testing & taking down old unsv one complete all as specified and to the entire satisfaction of the Eng-in-Charge of following sizes : MAKE : Leader/Tata/Zoloto/Kartar/RMCO |
| 195 | 80 mm bore |
| 196 | 50 mm bore |
| 197 | Testing of Water samples for Physical, Chemical & Bacteriological analysis from any Govt. approved/NABL accredited Laboratory as approved by the GE/Engr-In-Charge. NOTE : The cost of collection of sterilized bottles, collection of water samples from water sources as directed by GE/Engr-In-Charge, depositing to laboratory and submitting the test results duly signed & certified to the Engr-In-Charge complete is deemed to be included in the unit quoted rates. |
| 198 | S&F Pressure switch type KP 35/36, with necessary fittings, necessary drilling and tapping with existing GI/CI pipe (in position) complete all as specified and as directed & to the entire satisfaction of Engr-In-Charge |
| 199 | Supply, install, commissioning & testing of CI Sluice Valve 80 mm bore, both ends flanged, class PN 1.6, ISI marked conforming to IS 14846:2000 with SS spindle and one number hand wheel including making new flanged joints with rubber gasket, necessary bolts, nuts, washers etc of suitable size incl taking down old unsv one complete all as specified and to the entire satisfaction of the Eng-in-Charge. MAKE : Leader/Kirloskar/Upadhyay/KARTAR |
| 200 | Supply, install, commissioning & testing of CI Sluice Valve 100 mm bore, both ends flanged, class PN 1.6, ISI marked conforming to IS 14846:2000 with SS spindle and one number hand wheel including making new flanged joints with rubber gasket, necessary bolts, nuts, washers etc of suitable size incl taking down old unsv one complete all as specified and to the entire satisfaction of the Eng-in-Charge. MAKE : Leader/Kirloskar/Upadhyay/KARTAR |
| 201 | Supply, install, commissioning & testing of CI Sluice Valve 150 mm bore, both ends flanged, class PN 1.6, ISI marked conforming to IS 14846:2000 with SS spindle and one number hand wheel including making new flanged joints with rubber gasket, necessary bolts, nuts, washers etc of suitable size incl taking down old unsv one complete all as specified and to the entire satisfaction of the Eng-in-Charge. MAKE : Leader/Kirloskar/Upadhyay/KARTAR |
| 202 | Supply, install, testing & commissioning of CI Non-Return (Reflux) Valve 150 mm bore, both end flanged, class PN 1.6, ISI marked conforming to IS 5312 (Part I & II) including making new flanged joints with rubber gasket, necessary bolts, nuts, washers etc of suitable size incl taking down old unsv one complete all as specified and to the entire satisfaction of the Eng-in-Charge. MAKE : Leader/Kirloskar/Upadhyay. |
| 203 | M&L for fabrication of 4.0 MM thick MS sheet covers for Valve Pit Chambers with necessary nuts, bolts, washers or welded attachment incl welding etc. work complete as required at site including applying two coats of black bituminous lead free paint over a coat of red oxide primer after preparation of surfaces complete all as specified and to the entire satisfaction of the Eng-in-Charge. |
| 204 | M&L for cement concrete (1:3:6) type C1 (using 20 mm graded stone aggregate) in plinth courses, string courses, lacing courses, parapets and railings, copings, kneelers, apex stones, bed plates, kerbs, water troughs, foundation, supports, anchor blocks and the likes including weathering, slightly rounded or chamfered angles and throating complete all as specified and to the entire satisfaction of the Eng-in-Charge. |
| 205 | M&L for Demolition/Cutting of road/PCC (unreinforced)/ hard standing fortaking out the damaged pipe etc. complete all as specified and to the entire satisfaction of the Eng-in-Charge. |
| 206 | M&L for Demolition of Brickwork or stone / boulder masonray, Pre-cast block masonary built in cement motor including all quoins, arches, pillars,etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and to the entire satisfaction of the Eng-in-Charge. |
| 207 | M&L for Pre-cast Cement Concrete block masionary with solid blocks, exc 10 cm in width and setting in mortor set in cement mortar 1:6 Type B1 1:2:4 (20mm graded aggregate) complete all as specified and to the entire satisfaction of the Eng-in-Charge. |
| 208 | M&L for Rendering 10 mm thick on fair faces of brick work or concrete srufaces cement plaster 1:6 complete all as specified and to the entire satisfaction of the Eng-in-Charge. |
| 209 | M&L for Disconnecting the suction and delivery pipe lines and electric connections of plunger type Hydro Jet Pump of capacity 10 HP (7.5 KW), 1440 RPM, max pressure 125 bar, Max flow 30 LPM & removing it from its existing position carefully and transporting the same to the work shop, dismantling / opening up the pump and motor for inspection, repairs / replacing the worn out unserviceable parts with new ones including cleaning, lubricating, replacing the minor items like necessary packing materials, studs, nuts, bolts, washers etc., reassembling the P/Set including painting with two coats of synthetic enamel paint of approved colour & grade after preparation of old/existing surfaces, transporting back and refixing the same in its original position including connecting up the water and electric connections, commissioning & testing complete all as specified and as directed & to the entire satisfaction of the Engineer-in-Charge : |
| 210 | \"Important Notes for Item No 53.00 :(a) Unit rates quoted is deemed to be inclusive of removing the unsv spares and fixing of new ones incl testing complete all as specified and as directed to the entire satisfaction of the Engr-In-Charge.(b) The major spares required for Pump Set will be measured and paid separately under respective items as supply only.(c) Expendable stores like cotton waste / cleaning materials, lubricants, gland packing, gaskets, O rings, Keys materials etc. and transportation to and from site to work shop etc. is deemed to be included in the unit quoted rates.(d) The contractor should ensure that any complaint / breakdown of Pump Set has to be attended within 24 hrs from the time of intimation/reporting about the same either by telephonic or electronic mode by deploying skilled tradesman. During urgent / emergent cases information/ intimation about the breakdown will be conveyed to the Contractor through Telephonic/ Electronic modes only & the same shall be treated as an Official Intimation. In the event of any delay beyond above mentioned time limit without prior intimation or genuine cause, penalty at the rate of twice the quoted rate for each un-attended complaint / breakdown shall be recovered.(e) The contractor / firm is required to visit the site prior to quoting of the subject items/ work so as to ascertain the actual ground requirements. Any further query at a later date shall not be entertained & responsibility of the same shall rest on the contractor/ firm.(f) Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates.\" |
| 211 | Supply only Suction pipe of size 3/4 \". Make & Type : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 212 | Supply only Discharge Pipe of size 1/2\". Make & Type : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 213 | Supply only NRV 3/4 \". Make & Type : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 214 | Supply only Reducers. Make & Type : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 215 | Supply only Pressure Gauge 0-210 kg/cm2. Make & Type : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 216 | Supply only Washing Gun. Make & Type : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 217 | Supply only Pressure Regulator. Make & Type : As per Existing / As per OEM Recommendation / Maint / Service Manual. |
| 218 | S&F ductile iron fitting conforming to IS 9523, K 12, suitable for spigot and socket pipes/ Flanged type of class K9 up to 400 mm bore such as bends (any type radius and angle), tappers any type (straight bend increasing, decreasing or double socket etc), TEE pieces, Single branch, Y junction double branch, Cross collars, caps, plugs etc. including rubber gasket joints incl testing & taking down old unsv fittings complete all as specified and to the entire satisfaction of the Eng-in-Charge. |
| 219 | S&F cast iron fitting suitable for spigot and socket pipes/ Flanged type up to 380/400 mm bore such as bends (any type radius and angle), tappers any type (straight bend increasing, decreasing or double socket etc), TEE pieces, Single branch, Y junction double branch, Cross collars, caps, plugs etc. including rubber gasket joints incl testing & taking down old unsv fittings complete all as specified and to the entire satisfaction of the Eng-in-Charge. |
| 220 | Supply and laying in trenches/through pipes or bare in road crossings/ paths /drains /ducts /floors /along poles/ walls/ ceilings/ equipments etc. Cable Under ground, armoured, XLPE insulated with stranded aluminium conductor, 1100 Volts grade ofcross sectional area, 4.0 Core 25 Sqmm incl connecting with suitable glands, lugs etc. with & incl necessary fixing arrangements incl taking down old unsv one complete all as specified and directed & to the entire satisfaction of the Engr-in-Charge. Make: Havells/Finolex/Polycab/Gloster |
| 221 | Supply and laying in trenches/through pipes or bare in road crossings/ paths /drains /ducts /floors /along poles/ walls/ ceilings/ equipments etc. Cable Under ground, armoured, XLPE insulated with stranded aluminium conductor, 1100 Volts grade ofcross sectional area, 4.0 Core 16 Sqmm incl connecting with suitable glands, lugs etc. with & incl necessary fixing arrangements incl taking down old unsv one complete all as specified and directed & to the entire satisfaction of the Engr-in-Charge. Make: Havells/Finolex/Polycab/Gloster |
| 222 | Excavation in trenches by mechanical or other means n.exc 1.5m wide and n.exc 1.5m in depth for laying of pipe and getting out in hard dense soil old unsv Cables/Pipes incl connected items complete all as specified and as directed. |
| 223 | Returning, filling in including spreading, levelling, watering and well ramming in layers n.exc 25cm thick. |
| 224 | Removing of excavated material n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting point. |
| 225 | S&F MCB, TPN, C-Series 415 Volts of capacity 16-32 Amps with breaking capacity 10 KA complete all as specified and directed by Engr-in-Charge. Make : L&T/ABB/SIEMENS/LEGRAND |
| 226 | S&F MCB, TPN, C-Series 415 Volts of capacity 40-100 Amps with breaking capacity 10 KA complete all as specified and directed by Engr-in-Charge. Make : L&T/ABB/SIEMENS/LEGRAND |
| 227 | M&L for Pump Starter Control Panel, outdoor type, made out of 3.15 mm thick CRCA sheet for outer portions & 2.0 mm thick for inner portions, Double door opening, dust and vermin proof, top canopy, locking arrangement with angle iron support duly painted with 2 coats of powder coated (Shade RAL 7032) paint over a coat of red oxide metal primer mounted over Brick / PCC platform as per site requirement with and including following accessories duly fixed and prewired with copper conductor cable of suitable size for 1.5 HP Submersible P/Set : (For Perimeter Borewells)(a) TPN MCB 32 Amps, 10 KA, \"C\" Series - 01 No. Make : L&T/ABB/LEGRAND/SIEMENS(b) DOL Starter suitable for 1.5 HP, 3 Ph with O/L, O/V, U/V etc. safety features - 01 No. Make :L&T/ABB/LEGRAND/SIEMENS/BCH(c) Single Phase Preventor - 01 No. Make : L&T/ABB/SIEMENS/BCH/SCHNEIDER/MINILAC(d) LED type Indicating lamp for RYB - 01 Set.(e) Digital Ammeter with builtin Selector Switch - 01 No with CTs 3 Nos. Make : AE/L&T/ELMEASURE(f) Digital Ammeter with builtin Selector Switch - 01 No 0 to 500V. Make : AE/L&T/ELMEASURE |
| 228 | S&F Steel wire rope of size 4 mm to tie the Submersible P/Set with the top casing pipe to prevent immersion under water with suitable sized MS Clamps, nuts, bolts, washers etc. complete all as specified and as directed & to the entire satisfaction of the Engr-in-Charge. |
| 229 | M&L for taking down the unsv booster pump with pressurised tank by opening the pump and motor of 0.5 / 0.6 HP capacities for repairs and reassembling the pump and motor as per the original assembly after repairs / replacing the worn out unserviceable spare parts with new ones as ordered / directed including cleaning, replacing the minor items like packing, nuts, bolts, washers, MS clamps etc. thereby making the pump and motor fully serviceable including metal filling, machining work etc. and testing the same after refixing and commissioning complete all as specified and as directed & to the entire satisfaction of the Engr-in-Charge. |
| 230 | \"Important Notes for Item No 184.00 :(a) Unit rates quoted is deemed to be inclusive of removing the unsv spares and fixing of new ones incl testing complete all as specified and as directed to the entire satisfaction fo the Engr-In-Charge.(b) The major/minor spares required for repair of the Booster P/Set is deemed to be included in the quoted rates.(c) The contractor should ensure that any complaint / breakdown of Pump Set has to be attended within 24 hrs from the time of intimation/reporting about the same either by telephonic or electronic mode by deploying skilled tradesman. During urgent / emergent cases information/ intimation about the breakdown will be conveyed to the Contractor through Telephonic/ Electronic modes only & the same shall be treated as an Official Intimation. In the event of any delay beyond above mentioned tiime limit without prior intimation or genuine cause, penalty at the rate of twice the quoted rate for each un-attended complaint / breakdown shall be recovered.(d) The contractor / firm is required to visit the site prior to quoting of the subject items/ work so as to ascertain the actual ground requirements. Any further query at a later date shall not be entertained & responsibility of the same shall rest on the contractor/ firm.(e) Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates.\" |
| 231 | M&L for removing the old unsv Ultrasonic Chetas Jalsonic Water Meter from its position and carrying out necessary repairs as per actuals through OEM / Auth Service Centres etc. & refixing the same in its original position, commisioning & testing complete all as specified and as directed & to the entire satisfaction of the Engr-in-Charge. IMPORTANT NOTE : In the event of any fault / issues etc. occuring within six months of repairing, the contractor will get the same repaired / rectified free of cost & no extra amount will be given for this account. Cost of transportation to & fro (if any) is deemed to be included in the unit quoted rates. Anything missed out in the technical specifications but technically required for efficient working is deemed to be included in the quoted rates. |
| 232 | M&L for Painting of Underground Sumps on the exposed portion above ground level top, side walls, all around with red and white synthetic enamel paint (as per existing pattern / scheme) after preparation of the old painted surfaces by applying two coats of synthethic enamal paint alongwith PCC patchup work whereever required to make the surface even & smooth for painting with & including painting of all the connected pipelines and control valves complete all as specified and as directed & to the entire satisfaction of the Engr-in-Charge for the sumps as mentioned below : |
| 233 | R.C.C. Semi Under Ground Sump Dome type of capacity 175000 Glns at/near Pump House No 2. |
| 234 | 350000 Gallons (two compartments) of 175000 Gallons each at/near Pump House No 1. |
| 235 | 125000 Gallons at/near Pump House No 2. |
| 236 | 100000 Gallons (two compartments) of 50000 Gallons each at/near Pump House No 2 & ATC. |
| 237 | 50000 Gallons (14 AFH) & Pump House-3 near F tank. |
| 238 | M&L for Painting of Over Head Tanks on the exposed portion above ground level top, side walls, all around with red and white synthetic enamel paint (as per existing pattern / scheme) after preparation of the old painted surfaces by applying two coats of synthethic enamal paint alongwith PCC patchup work whereever required to make the surface even & smooth for painting with & including painting of all the connected pipelines and control valves complete all as specified and as directed & to the entire satisfaction of the Engr-in-Charge for the sumps as mentioned below : |
| 239 | 50,000 Gallons (Tank \"D\" ,\"F & \"E\") |
| 240 | 1,00,000 Gallons (Tank \"A\") |
| 241 | 1,50,000 Gallons(Tank \"B\") |
| 242 | 2,00,000 Gallons (Tank \"C\") |
| 243 | \"NOTE for Item Nos 193 to 197 :1) Every care w.r.t. safety of the workers during climbing, working is to be taken & the Contr shall be responsible for the same.2) Safety belts, working tools, ladders, stagings/scaffoldings etc. shall be provided by the Contr & the cost of the same is deemed to be included in the unit quoted rates.3) Quoted rate is deemed to be inclusive of minor repairs/plastering of external surfaces of the tank required to make good the damaged edges/surfaces of the tank. 4) The Contractor is to submit in writing the tentative schedules/dates for painting of the tanks for approval of the same from Engr-In-Charge. There may be instances when the Dept won\"t be able to hand-over a particular tank for the subject work/job due to any reasons on the approved/scheduled dates. |
| 244 | Supply & Filling/Mixing Calcium based high strength chlorine granule for Chlorination/Disinfection/Water treatment purposes packed in 45 Kg drums complete all as specified and as directed by the Engr-in-charge.MAKE : RMCO/JAL AQUA/PURICHLOR or techno-commercially equivalent.Available Chlorine - 65% (Min)Stability - 1/15 (Max) [ Loss of Chloride on basis of available chloride]Particle Size (passing through 1.70 mm IS Sieve) - 99.5% by Mass (Min)Water Insolube Matter - 6% (Max)Calcium Hydroxide - 4% (Max)Sodium Chloride - 15% (Max)Appearance - Dry free-flowing & free from lumpsToxic & Undesirable Substance - Should not induce substances beyond acceptable limit as given in IS : 10500 (incl latest amdts) in treated & disinfected water.IMPORTANT NOTE :1) Calcium Based Granular Disinfectant is to be purchased either directly from Manufacturer/Auth Dealer/Distributor only. 2) Tax Invoice & Original manufacturer test certificates duly signed & certified by the Manufacturer/Auth Dealer/Distributor is to be submitted by the Contr to the Engr-In-Charge. 3) Calcium Based Granular Disinfectant is to be purchased by the Contr in such a manner that either atleast 1 year of residual life is there on receipt of the material or the required qty of materials is to be purchased/ordered in lots as per the requirement of the Dept (MES). |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail