|
| 1 | Operation & maintenance of different capacity booster pump set, D.G. set , submersible pump set & other electrical installation at Pocket 1,6 & 7 in sector A-5 Narela. |
| 2 | Operation & maintenance of different capacity booster pump set, D.G. set , submersible pump set & other electrical installation at Pocket 7,1 & 11 in sector A-6 and Pocket – 13, Sector A-5 Narela |
| 3 | Operation & maintenance of different capacity booster pump set, D.G. set , submersible pump set & other electrical installation at Pocket 1,2 & 3 in sector A-9 Narela |
| 4 | Operation & maintenance of different capacity submersible pump set & other electrical installation at Gautam Colony Narela. |
| 5 | Operation & maintenance of different capacity booster pump set, D.G. set , submersible pump set & other electrical installation at Pocket 2,4 & 6 in sector A-10 Narela |
| 6 | Operation & maintenance of different capacity booster pump set, D.G. set , submersible pump set & other electrical installation at Pocket 1,3,6, 9 & 13 in sector B-4 Narela & Tikri Khurd Narela |
| 7 | Operation & maintenance of different capacity booster pump set, D.G. set , submersible pump set & other electrical installation at Gr-I & II in sector B-2 Narela |
| 8 | Wireman / Electrician for routine maintenance for all pumping installation and other electrical installations at Narela |
| 9 | Lifting of the submersible pump set from the existing borewell alongwith G.I.Pipe, bend, submersible cable and other accessories i/c dismantling the G.I. Pipe and pump set etc. complete as required. |
| 10 | Lowering of submersible pump set in the existing borewell alongwith GI pipe, bend, submersible cable wire rope upto required depth i/c making water proof cable joint connection, testing etc. complete as required. |
| 11 | Repairing and rewinding of 3 phase 415 volts submersible Pump set of the following capacity connection testing etc. complete as required. |
| 12 | 3 HP capacity |
| 13 | 5 HP capacity |
| 14 | 6 HP capacity |
| 15 | 7.5 HP capacity |
| 16 | Supply & replacement (from deputed labour) of D.O.L. starter suitable for / up to 7.5 HP pump set on the existing panel board / feeder pillar i/c connection, testing etc. complete as required. |
| 17 | Supply & replacement of water proof submersible copper condr. Cable offollowing sizesi/c S/F cable clips and allied accessories for making connection, cable laying in ground as required, jointing & testing etc. complete as required. |
| 18 | 1 x 3 x 2.5 sqmm |
| 19 | 1 x 3 x 4 sqmm |
| 20 | Supply & replacement of the following size of Gi pipe B – class flanged type with necessary pipe fitting, bend etc. as required. |
| 21 | 40mm dia |
| 22 | 50mm dia |
| 23 | Dismantling of centrifugal pump set up to 50 H.P. 3 Phase, 415 volt for checking and assessment of parts to be replaced / repairedi/c cartage etc. as required. |
| 24 | Motor Side |
| 25 | Pump Side |
| 26 | Repairing of centrifugal Motor pump set 3 phase 415 volts i/c S/R of defective parts of motor and pumps reassembling painting, testing etc. complete as required. (A) MOTOR SIDE, i)Rewinding of motor |
| 27 | 20 HP |
| 28 | 30 HP |
| 29 | ii)S/R Ball bearing . 20 HP |
| 30 | 30 HP |
| 31 | (B) PUMP SIDE, i ) Rematalling turning and grinding of pump shaft, 20 HP |
| 32 | 30 HP |
| 33 | ii)S/R Ball bearing , 20 HP |
| 34 | 30 HP |
| 35 | iii) S/R of gland plate . 20 HP |
| 36 | 30 HP |
| 37 | Supply & replacement (from deputed labour) of following capacity switch fuse unit, TP&N, FN type i/c dismantling of existing defective SFU, including inter connection, testing etc. complete as required. |
| 38 | 32 Amp. |
| 39 | 63 Amp. |
| 40 | 100 Amp. |
| 41 | 125 Amp. |
| 42 | 200 Amp. |