|
| 1 | Supply of Ceiling Array Microphone system as per Schedule A |
| 2 | Installation, Testing and Commissioning of Ceiling Array Microphone system as per Schedule A |
| 3 | Supply of Digital Processing Unit as per Schedule A |
| 4 | Installation, Testing and Commissioning of Digital Processing Unit as per Schedule A |
| 5 | Supply of Network Switch as per Schedule A |
| 6 | Installation, Testing and Commissioning of Network Switch as per Schedule A |
| 7 | Supply of Amplifier as per Schedule A |
| 8 | Installation, Testing and Commissioning of Amplifier as per Schedule A |
| 9 | Supply of Ceiling Loudspeaker as per Schedule A |
| 10 | Installation, Testing and Commissioning of Ceiling Loudspeaker as per Schedule A |
| 11 | Supply of HDMI Switcher as per Schedule A |
| 12 | Installation, Testing and Commissioning of HDMI Switcher |
| 13 | Supplyof HDMI, USB-C Convertor as per Schedule A |
| 14 | Installation, Testing and Commissioning of HDMI, USB-C Convertor as per Schedule A |
| 15 | Supply of 18U Indoor Floor Mountable Steel Rack as per Schedule A |
| 16 | Installation, Testing and Commissioning of 18U Indoor Floor Mountable Steel Rack as per Schedule A |
| 17 | Supply of Cable cubby as per Schedule A |
| 18 | Installation, Testing and Commissioning ofCable cubby as per Schedule A |
| 19 | Supply of HDMI Cable complete with all connecting accessoriesas per Schedule A |
| 20 | Laying of HDMI Cable complete with all connecting accessories as per technical specification as per Schedule A |
| 21 | Supply of LAN (CAT6) Cable complete with all connecting accessories as per Schedule A |
| 22 | Laying of LAN (CAT6) Cable complete with all connecting accessories as per Schedule A |
| 23 | Supply of Audio/Microphone Cable with all connecting accessories as per Schedule A |
| 24 | Laying of Audio/Microphone Cable with all connecting accessories as per Schedule A |
| 25 | Supply of Speaker Cable with all connecting accessories as per technical specification in schedule- A |
| 26 | Laying of Speaker Cable with all connecting accessories as per technical specification in schedule- A |
| 27 | Supply of USB 3.0 Cable with all connecting accessories as per Schedule A |
| 28 | Laying of USB 3.0 Cable with all connecting accessories as per Schedule A |
| 29 | Removal of existing conference table as detailed in Schedule-A. |
| 30 | Re-installation of existing conference table as detailed in Schedule-A. |
| 31 | Supply of Corian top Conference Table 18ft x 6 ft x 2.6 ft as per Schedule A |
| 32 | Installation of Corian top Conference Table 18ft x 6 ft x 2.6 ft as per Schedule A |
| 33 | Supply of Chair as per Schedule A |
| 34 | Charges for Civil works as per technical specification in schedule- A |