| 1 | Supplying and fixing of 6 way , Double door, single pole and neutral, sheet steel, MCB distribution board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including dismantling of damaged MCB DB and take out properly,providing connection to new MCBetc. as required. (But without MCB/RCCB/Isolator) |
| 2 | Supplying and fixing of single pole, 5 A to 32 A (20 AMP) rating, 240/415 V, 10 kA, \"C\" curve, miniature circuit breaker suitable for inductive load of single pole in the existing MCB DB complete with connections, testing and commissioning etc. as required. |
| 3 | 12-15 Watt LED Down lighter (SMD Type) (System lumen efficacy ≥12085%, Operating voltage AC 140-270 Volt, frequency 50/60 hz, Operating temp range -5 0C to 40 0C centigrade, internal surge protection of 2.5 KV with Short & Open circuit protection ,THD < 10%, P. F.≥0.95, IP20, CRI >80, UGR (Unified Glare Rating) |
| 4 | Supplying, Installation, Testing & Commissioning of 72 WattStreet light LED fixture, powder coated pressure die cast aluminium body with built in or separate driver as per the requirement with Driver efficiency >85%, Input voltage: 140-270 Volt AC, frequency 50/60 hz, Operating temp range -5 0C to 50 0C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%,THD < 10% as per IEC 61000-3-2, P. F.≥0.95, IP-66,IK-10, CRI>70, under voltage and over voltage protection,EMI-EMC as per CISPR-15, lenses for beam angle as per IESNA type I/II/III as per the width of the road and the project requirement., suitable to fit in up to 65mm dia pipe, life time (LED,Driver & electrical circuitary) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11report, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin), SDCM(Standard Deviation Color Matching) <5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in al respect i/c external connections with 1.5 sq mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy >135 lm/Watt output . LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted.. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement including providing connection from nearest DB. |
| 5 | Supplying and drawing the 2 x 2.5 sq. mmsizes of FRLS/HFFR PVC insulated copper conductor, single core cable in the PVC conduit as required. |
| 6 | Finishing walls with acrylic smooth exterior paint of required shade : Old work (Two or more coat applied @1.67 ltr/10 sqm) on existing cement paint surface |
| 7 | Painting 80mm dia G.I. Pipe and fittings with two coats of anti-corrosive bitumastic paint of approved quality. |
| 8 | Note-1: General Notes1.For their own interest, contractors are advised to inspect the site with prior permission before quoting their rates.2. All the dismantled /demolished materials shall be dumped at one place as decided by the department within 150mtr lead. 3. All the samples of materials which are to be used shall be approved by the department in advance. 4. The contractor shall comply with the provision of the Payment of Wages act5. Rates quoted shall be inclusive of all cost of materials, labour, carriage, taxes, GST, labourcess, water charges, elctricity charges, signorage charges, wastages etc..6. Rates quoted shall be excluding the amount of EPFO and ESIC contributions. EPFO and ESIC contributions are reimbursableon production of valid proof of payment made by the contractor as per CPWD norms. |