| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.Ordinary rock |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidatingeach deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.All kinds of soil |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 6 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil |
| 7 | Clearing jungle including uprooting of rank vegetation, grass, brush wood ,trees and saplings of girth up to 30 cm measured at a height of 1 mabove ground level and removal of rubbish up to a distance of 50 moutside the periphery of the area cleared. |
| 8 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth upto and including 240 cm girth |
| 9 | Above 240 cm girth |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 11 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) |
| 12 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) |
| 13 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete |
| 15 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 16 | Suspended floors, roofs, landings, balconies and access platform |
| 17 | Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 18 | Columns, Pillars, Piers, Abutments, Posts and Struts |
| 19 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 20 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work;usingcoarse aggregate and fine aggregate derived from natural sources,Portland Pozzolana / Ordinary Portland /Portland Slagcement,admixtures in recommended proportions as per IS: 9103 to accelerate /retard setting of concrete, to improve durability andworkabilitywithout impairing strength; including pumping of concrete to site of laying, curing,carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge;for the following grades of concrete.All works upto plinth levelConcrete of M25 grade withminimum cement content of 330 kg /cum |
| 21 | Add for using extra cement in the items of design mix over and above the specified cement content therein. |
| 22 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in :Cement mortar 1:4 (1 cement :4 coarse sand) |
| 23 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving110 mm diameter |
| 24 | 15 mm cement plaster on the rough side of single or half brick wall of mix 1:6(1 cement: 6 fine sand) |
| 25 | Supplying and stacking at site63 mm to 45 mm size stone aggregate |
| 26 | Laying, spreading and compacting stone aggregate of specified sizesto WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density |
| 27 | Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete. |
| 28 | Providing and fixing pre-moulded joint filler in expansion joints of RCC roads / CC pavements after making the joints dust free with high pressure air jet cleaners, all complete as per direction of theEngineer-in-Charge. (Pre-moulded joint fillers shall be made of bitumen hot sealing compound impregnated fibre board having impregnation more than 35%, conforming to IS:1838 for fibre board and IS: 1834 for hot sealing bitumen compound grade A.) |
| 29 | Providing and fixing Glow studs of size 100x20 mm made of heavyduty body shall be moulded ASA (Acrylic styrene Acryloretrite ) or HIP (High impact polystyrene) or ABS having electronically welded micro- prismatic lens with abrasion resistant coating as approved byEngineer in charge. The glow stud shall support a load of 13635 kg tested in accordance with ASTM D4280. The slope of retro- reflective surface shall be 35 (+/-5) degress to base .The reflective panels on both sides with at least 12 cm of reflective area up each side. The luminance intensity should be as per the specification and shall be tested as described in ASTM I: 809 as recommended in BS: 873part 4 : 1973. The studs shall be fixed to the Road surface using theadhesive conforming to IS, as per procedure recommended by themanufacturer complete and as per direction of Engineer-in-charge. |
| 30 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.80 mm nominal inner dia Pipes |