| 1 | Collecting of water sample from different location of RO plant and duly tested quarterlyfor the potability by the Govt approved laborities for each plant complete all as specified and directed. |
| 2 | Collecting of water sample from different location of RO plant and duly tested quarterlyfor the potability by the Govt approved laborities for each plant complete all as specified and directed. |
| 3 | Supply and fix in Replacement of micro filter of size(20 \"X 4\"), spun- 5 micron Jumbo Wound complete all as specified and directed.(Make: HITECH/CRUZE/SAFEFLOW) |
| 4 | Supply and fix in Replacement of micro filter of size(20\" X 2.5\") spun- 5micron PP Wound complete all as specified and directed.(Make: HITECH/CRUZE/SAFEFLOW) |
| 5 | Supply and fix in Replacement of micro filter housing of size(20\"X 4\") spun- 5micron Jumbo Wound complete all as specified and directed.(Make: HITECH/CRUZE/SAFEFLOW) |
| 6 | Supply and fix in Replacement of Micro filter housing of size(20\" X 2.5\") spun- 5micron PP Wound complete all as specified and directed. |
| 7 | Supply of Sodium Hypo Chloride Solution for plant including mixing intowater as per requirement complete all as specified and directed. |
| 8 | Supply only calcium based high strength chlorination chemical for water disinfection in granular form in factory sealed HDPE container (45/50 Kg Each) having chlorine concentration level 70%. Make _- Declibac (Brand Name- Altoch GP) or equivalent make as approved by E-in-C complete all as directed . |
| 9 | Supply and fix in Replacement End cover and saddle for membrane housing 80-80 |
| 10 | Labour for chemical cleaning/washing of membranes of size 80-80 during routine maintenance work |
| 11 | Supply ofAnti Scalant chemicals for plant including mixing intowater as per requirement complete all as specified and directed. |
| 12 | Supply and Fix of dosing pump set for RO plant , capacity 6 ltr / Hour, single Ph, 230 volts, made functionable complete all as specified and directed. (Make: FOCUS/ E-DOZE) |
| 13 | Replacement unserviceablemembraneand provision ofMebrance housing as per existing size8 \" BW 80-40 for capacity 1000/2000 litre /Hour complete all as specified and directed. Make-Filmtec/Osmonics/GE/Pentair / Hydraunatice |
| 14 | Replacement unservicable electrical float stop switch valve and supply and fixing new float valve as per existing size complete all as specified and directed.Make: Ozone technologies/GE/equivalent |
| 15 | Replacement unserviceabe LP switch (2000 Ltr) capacity and Supply,fixing new LP switch (KP35) as per existing size complete all as specified and directed.Make-Ozone Technologies/ GE /Denfos |
| 16 | Replacement unserviceabeHP switch (2000 Ltr) capacity and Supply,fixing new HP switch (KP36) as per existing size complete all as specified and directed.Make-Ozone Technologies/ GE /Denfos. |
| 17 | Replacement unserviceabepipeand Supply and fix40 mm bore UPVC pipes of pressure rating 10 kgf/cm2 laid in trenches complete all as specified and directed. |
| 18 | Supply and fix in repair unserviceabe pipeand Supply and fix25 mm bore UPVC pipes of pressure rating 10 kgf/cm2 laid in trenchescomplete all as specified and directed. |
| 19 | Replacement unserviceabe flow meterand Supply,fixing new flow meteras per existing size complete all as specified and directed.Make-Ozone Technologies/ GE /USSor equivalent |
| 20 | Supply and Fix 10mm dia hose pipe for pressue guage and dosing pump |
| 21 | Supply and FixUltra violet lamp with housing for (2000 ltrs) RO plant |
| 22 | Replacement ofunserviceabe multi port valveand Supply,fixing new mulit port valve ofsize40NB TMF SOLO complete all as specified and directed.Make-Ozone Technologies/ GE /USS /soloor equivalent |
| 23 | Replacement of unserviceabe control panel and Supply,fixing new control panel Astero Panel 3-3 complete all as specified and directed.Make-Astro/GE or Equivalent |
| 24 | Replacement of unserviceabePressure sand filter vessel with media and Supply,fixing new Pressure sand filter media suitable for 1000 to 2000 LPH Plantcomplete all as specified and directed.Make-Astro/GE/Pentair |
| 25 | Replacement of unserviceabe Activated carbon filter vessel with media and Supply,fixing new Activated carbon filter media suitable for 1000 to 2000 LPH Plantcomplete all as specified and directed.Make-Astro/GE/Pentair |
| 26 | Supply and Fix of high pressure pump for RO Plant 2000 ltr/hr capacitysingle Ph, 230 volts, made functionable complete all as specified and directed. (Make: FOCUS/ E-DOZE or equivalent |