| 1 | Earth work in cutting in correcting internal section of canal including all lead & lift, proper disposal, manual compaction required for proper completion of work. |
| 2 | Laying of dry brick on edge (soling) including preparation of sub-grade to prescribed slope, filling joint with earth /sand , T&P etc. as per Id sepcification. |
| 3 | Earth work in excavation in foundation in all type of soil with all lead and lift including back-filling the trench with proper disposal, ramming and dressing required for proper completion of work for boundary pillar. |
| 4 | Fixing of RCC Precast Boundary Pillar including cost of all materials, labour and T&P etc. required for proper completion of work. |
| 5 | Laying C.C. in M-15 (1:2:4) in foundation with cement, coarse sand & stone grit (20 mm to 40 mm.) for boundry pillar including all cost of materials, carraige up to site of work, T&P and labour required for proper completion of work. as per Id sepcification. |
| 6 | Laying R.C.C. in M-25 in foundation with cement, coarse sand & stone grit (10mm to 20mm.) including all cost of materials, carraige up to site of work, T&P and labour required for proper completion of work. as per Id sepcification. |
| 7 | Centering and shuttering of RCC including cost of material, labour, T&Petc. required for proper completion of work. as per Id sepcification. |
| 8 | Finishing wall with acrylic smooth exterior paint of required shade including cost of material, labour, T&P etc. required for proper completion of work.as directed by engineer in charge. |
| 9 | Reinforcement of steel including cutting, bending & binding including all cost of material, labour, T&Petc. required for proper completion of work. as per Id sepcification. |
| 10 | Letter Writing for details of canal Boundary Pillars including all cost of material, labour, T&Petc. for proper completion of work. |
| 11 | Dismantling old, damaged & broken brick abutment and pier in pucca work incl. all cost of labour T&P required for proper completion of work. |
| 12 | 1st class brick work in 1:4 cement & coarse sand mortar for parapet and gate repairing with M-150 brick, coarse and including all cost of materials, carriage up to site of work, T&P and labours required for proper completion of work. |
| 13 | Centering and shuttering for C.C. work including all cost of materials, T&P, labours and other accessories required for proper completion of work. as per Id sepcification. |
| 14 | Laying CC work in M-20 in foundation with cement, coarse sand & stone grit (10mm to 20mm.) including all cost of materials, carraige upto site of work, T&P and labour required for proper completion of work. as per Id sepcification. |
| 15 | Deep struck Cement pointing in 1:2 cement coarse sand mortor including cost of all material ,carriage up to site of work labour T&P etc required for proper completion of work. as per Id sepcification. |
| 16 | Erection and fabrication charges of gate and gate parts. (Material and labour.) |
| 17 | Lifting mechanism Assembly for gate Repairing charge etc. |
| 18 | Providing two coat enamel paint over one coat primer for gate painting including all materials, labour, T&P etc complete. as per Id sepcification. |
| 19 | Greasing & oiling of Head regulator including cost of all material, labour& T&P etc. for |
| 20 | Providing and fixing Rubber Seal for head/crass regulator including all materials, labour, T&P etc complete. as per Id sepcification. |
| 21 | Dismantling of old and damaged Gate and Gate parts |
| 22 | Providing for repairing gate material .M.S. Channel 100X50X4.70mm, M.S. Channel 75X40X4.40 mm, M.S. Angle 50X50X5 mm,M.S. Angle 60X60X5 mm,M.S. Flat 50X5mm thick and M.S. Flat sheet 3.15mm thick. |
| 23 | Dismantling of Reinforced Cement Concrete work and its proper disposal including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specification. |
| 24 | Earth work in excavation in foundation in all type of soil with all lead and lift including back-filling the trench with proper disposal, ramming and dressing required for proper completion of work for V.R.B . as per Id sepcification. |
| 25 | Earth work for making Diversion including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and I.D. specification. |
| 26 | Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work. |
| 27 | Boring with 100 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. required for completion work as directed by Engineer-in-Charge as per I.D. specification |
| 28 | Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc.for complete work as directed by Engineer-in-Charge as per I.D. |
| 29 | Supplying & Fixing wheel guard stone including cost of all material ,labour, t&p etc. required for proper completion of work |
| 30 | Laying PVC Pipe of 75 mm dia in drainage spout including cost of pipe, other material, labour, T&P etc. required for completion work as directed by Engineer-in-Charge and as per drawing and I.D. specification. |
| 31 | Sign board at site for notice both side including Painting & Letter writing cost of all material ,labour, t&p etc. required for proper completion of worK. as directed by Engineer-in-Charge |
| 32 | Earth work in removing of diversion bund and using for making ramp including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and I.D. specification. |
| 33 | Laying P C.C. in 1:3:6 in foundation with cement, coarse sand & stone grit (20 mm to 40 mm.) including all cost of materials, carrige upto site of work, T&P and labours required for proper completion of work. |
| 34 | Providing one coat of VG -30 bitumen painting with two layer of tarfelt again followed by second coat of bitumen on abutment and pier before laying R.C.C. Slab including cost of all material labour and T & P etc. |
| 35 | S/Laying of filter material as coarse sand, grit, gravel, fine sand. Stone ballast, brick ballast with proper compaction and rolling including cost of all materials, labour and T&P etc. |
| 36 | Stone Grite (12.5 mm to 20 mm ) |
| 37 | Grit, gravel (4.75mm to 10 ) |
| 38 | Coarse sand |
| 39 | Supply of mechanically woven double twisted hexagonal shaped wire mesh gabion box/crate of 1m³ mesh size 10 cm x12 cm SWG GI wire. |
| 40 | Earth work in excavation in canal internal slope for placing crate/box in all type of soil with all lead and lift including back-filling with proper disposal and dressing required for proper completion of work. |
| 41 | Laying Wire crate filled with brick bat obtained form dismantled of pucca work for protection work including cost of all materials, labour, T&P etc required for proper completion of work as per I.D. specification. Please Enable Macros to View BoQ information |