|
| 1 | Material & Labour for complete removal of existing treatment internal as well as external or ceiling of building and soffits of Over Head Tank including installations of GE utility by scrapping with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 80 Grit having dia of 7\"/9\" to make the surface free from dust, loose paint etc. by skilled labour complete all as specified and directed. |
| 2 | Material & Labour for applying One coat of white cement based water proof wall care putty to give smooth and even surface on old as well as new plastered, old brick pattern finish wall surface and Over head tank including installations of GE utility including sand papering the puttied surfaces to form an even and smooth surface complete all as specified and directed. |
| 3 | Material & Labour for preparation of puttied surfaces and applying two coats of 100% permium acrylic emulsion paint having VOC less than 50gm/litre and UV resistance as per IS15489:2004, Alkali, & fungal resistance, dirt resistance exterior paint of required shade (company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over and including priming coat of exterior primer applied @0.90 litre/ 10sqm per coat of weather proof exterior emulsion paint over new plastered or unplastered andold plastered/ unplastered surfaces of Over head tank and installations of GE utility to be applied with fully automatic airless spray machine with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI, by allowing 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed.Make:- Weather coat long life WL 300 in berger / Apex ultima protek PU Serum Asian Paints or equivalent manufacturer as approved by GE. |
| 4 | Material & Labour for applying two coats of oil bound distemper over a coat of alkali resistant primer over new plastered or unplastered andold plastered/ unplastered surface using Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and as mentioned in PS and accessories for applying distemper/ primer should be able to spray in hard to reach areas and penetration of distemper on the surface complete all as specified and directed. Make:- Bison lite interior Emulsion Berger / Lustre interior wall finish in Asian Paints or equivalent manufacturer as approved by GE. |
| 5 | Material & Labour for applying one coats of 100% permium acrylic emulsion paint having VOC less than 50gm/litre and UV resistance as per IS15489:2004, Alkali, & fungal resistance, dirt resistance exterior paint of required shade (company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over and including priming coat of exterior primer applied @0.90 litre/ 10sqm per coat of weather proof exterior emulsion paint over old rough plastered surfaces to be applied with fully automatic airless spray machine with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI, by allowing 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed.Make:- Weather coat long lifeWL 300 in berger / Apex ultima protek PU Serum Asian Paints or equivalent manufacturer as approved by GE. |
| 6 | Material & Labour for for applying two coats of 100% permium acrylic emulsion paint having VOC less than 50gm/litre and UV resistance as per IS15489:2004, Alkali, & fungal resistance, dirt resistance exterior paint of required shade (company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over and including priming coat of exterior primer applied @0.90 litre/ 10sqm per coat of weather proof exterior emulsion paint over new existing rough plastered surfaces to be applied with fully automatic airless spray machine with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI, by allowing 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed.Make:- Weather coat long lifeWL 300 in berger / Apex ultima protek PU Serum Asian Paints or equivalent manufacturer as approved by GE. |
| 7 | Notes for Periodical services: MOBILISATION OF T&P AND MATERIAL: The Contractor shall complete the following activities within 20 days from the date of commencement of work:(a) Submission of Memorandum of Understanding (MOU) with any of paint manufacturer.(b) Obtaining approval of paints & authorized applicator of paints manufacturer from GE.(c) Procurement of T&P required for mechanical mode of painting.(d) 30% of the quantity of Paints, Primer & Putty required (as per respective manufacturer’s average coverage area) for various items of painting catered in CA in GE utility store.(e) work executed upto 15 meter height, scaffolding and other necessary equipment included in quoted rate.(f) Removing of Nails, making good holes, cracks etc.(g) Work in patches and in narrow / widths, bands, windows, floors, fittings etc to protect them from spashers. (h) Washing floors, cleaning glass, joinery, electric fittings etc. Drops snd splashes of paint to be cleaned to the entire satisfaction of engineer -in-Charge. (j) Sample patch of 10sqm be prepared considering all the item of periodicl and shall be got approved from GE prior to carrying okut furtherwork.(k) item such as putty used for cracks filling will be paid and measured seperately.COMPENSATION FOR DELAY IN MOBILISATIONOF T&P AND MATERIAL BEYOND 30 DAYS: In case of failure on the part of contractor to complete above mobilization within the stipulated period, compensation shall be recovered from the contractor at the rate of Rs. 1,000/- (Rupees one thousand only) per day subject to a maximum of Rs. 1,00,000/- (Rupees one lakh only). Condition 50 of IAFW-2249 (General Conditions of Contracts) shall be deemed amended accordingly. The contractor shall submit original Tax invoices & e-way bills for the entire quantity of materials so procured. The material and T&P collected shall be entered in the MB as “NOT TO BE ABSTRACTED” and shall be duly signed by both the parties. |
| 8 | Taking down cement plaster and raking out joints, hacking for key, scrubbing down with water built in cement mortar complete all as specified and directed. |
| 9 | Material & Labour for Ready Mix Plaster 15 mm thick on brick work or concrete surfaces in finished having ready mix cement plaster with high quality polymer additives, well graded sand and fillers for manual plastering application on Over Head water tank even and smooth without using extra cement complete all as specified and directed. Make:- Asian paint/ Ultra tech/ Berger. |
| 10 | Material & Labour for 10 mm thick rendering on other than fair faces of brick or concrete surfaces in CM 1:6 finished even and smooth without using extra cement complete all as specified and directed.Note:- Plaster shall be done using yamuna sand/ black sand. |
| 11 | Material & Labour for rough cast plaster with and including 15 mm thick rendering in cement mortor 1:3 on brick wall or concrete surfaces as specified in clause 14.22 of SSR Part -I complete all as specified and directed. |
| 12 | Supply only liquid water proofing compound ISI marked complete all as specified and directed. |
| 13 | Demolition of Unreinforced Cement Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. |
| 14 | Hardcore of gauge n exc 63mm, deposited, spread and levelled in layers n exc 15cm thick, watered and rammed to a true surface complete all as specified and directed. |
| 15 | Material & Labour for 75 mm thick PCC 1:4:8 Type D–2 using 40mm graded crushed stone aggregate as in sub base of floor/ hard standing etc and finished even and fair without using extra cement complete all as specified and directed. |
| 16 | Material & Labour for 60mm thick (M-35 grade concrete) machine pressed precast concrete interlocking paver block of approved design and shape confirming to IS 15658-2006 with a crushing strength not less than 250 kg/sqmmwith grey cement and pigmentlaid over 25mm thick sand cushioning complete all as specified and directed.Note : Sand cushning will be measured and paid seperately. |
| 17 | Material & Labour for sand cushioning layer of 25mm thick under interlocking tiles complete all as specified and directed. |
| 18 | Material & Labour for Providing cement concrete in edges Type B1 1:2:4using 20 mm Graded Aggregate in roof kerbs or mud stops, rounded or chamfered on edges complete all as specified and directed. |
| 19 | Dismantling ofloose brick work built in cement mortar of any description etc complete all as specified and directed. |
| 20 | Material and labour for brick work in small patches over boundary wall with sub class `B` brick old size in CM 1:4 straight or curved on plan exc 6m mean radious complete all as specified and directed. |
| 21 | Material & Labour for dressing of ground by cutting / removing vegetation, scrapping, clearing of all grass, shrubs, bushes, weeds, trees and saplings not exceeding 30cm in girth (measured at a height of 1m above the ground level) on either side of building or low laying area, aprons and other places in alpha power house area by deploying jungle jims (06 feet) with tractors, and level the ground as per natural ground slope operators including fuel, lubricant, etc. complete all as specified and directed. |
| 22 | Material & Labour for temporary scaffolding provided around and below the overhead tank to facilitate surface cleaning, repair, priming, and painting activities. These scaffolding consists of steel pipes or bamboo for preparing and platforms erected up to 3.5m height of the tank, including access to side walls, columns, and the bottom surface where required. Adequate working platforms, guardrails, toe boards, and safe access ladders are included. The scaffolding is properly braced and secured to ensure stability and safety throughout the painting operation and is dismantled after completion of the work complete all as specified and directed. Note:- Measurement shall be done in sqm i.e. circular/rectangular water tank soffit area plus one meter offset in perimeter. |
| 23 | Material & Labour for temporary scaffolding provided around and below the overhead tank to facilitate surface cleaning, repair, priming, and painting activities. These scaffolding consists of steel pipes or bamboo for preparing and platforms erected from 3.5 to 7.5m height of the tank, including access to side walls, columns, and the bottom surface where required. Adequate working platforms, guardrails, toe boards, and safe access ladders are included. The scaffolding is properly braced and secured to ensure stability and safety throughout the painting operation and is dismantled after completion of the work complete all as specified and directed. Note:- Measurement shall be done in sqm i.e. circular/rectangular water tank soffit area plus one meter offset in perimeter. |
| 24 | Material & Labour for temporary scaffolding provided around and below the overhead tank to facilitate surface cleaning, repair, priming, and painting activities. These scaffolding consists of steel pipes or bamboo for preparing and platforms erected from 7.5 to 11.5m height of the tank, including access to side walls, columns, and the bottom surface where required. Adequate working platforms, guardrails, toe boards, and safe access ladders are included. The scaffolding is properly braced and secured to ensure stability and safety throughout the painting operation and is dismantled after completion of the work complete all as specified and directed.Note:- Measurement shall be done in sqm i.e. circular/rectangular water tank soffit area plus one meter offset in perimeter. |
| 25 | Material & Labour for temporary scaffolding provided around and below the overhead tank to facilitate surface cleaning, repair, priming, and painting activities. These scaffolding consists of steel pipes or bamboo for preparing and platforms erected from 11.5 to 15.5m height of the tank, including access to side walls, columns, and the bottom surface where required. Adequate working platforms, guardrails, toe boards, and safe access ladders are included. The scaffolding is properly braced and secured to ensure stability and safety throughout the painting operation and is dismantled after completion of the work complete all as specified and directed. Note:- Measurement shall be done in sqm i.e. circular/rectangular water tank soffit area plus one meter offset in perimeter. |
| 26 | Material & Labour for temporary scaffolding provided around and below the overhead tank to facilitate surface cleaning, repair, priming, and painting activities. These scaffolding consists of steel pipes or bamboo for preparing and platforms erected from 15.5 to 19.5m height of the tank, including access to side walls, columns, and the bottom surface where required. Adequate working platforms, guardrails, toe boards, and safe access ladders are included. The scaffolding is properly braced and secured to ensure stability and safety throughout the painting operation and is dismantled after completion of the work complete all as specified and directed. Note:- Measurement shall be done in sqm i.e. circular/rectangular water tank soffit area plus one meter offset in perimeter. |
| 27 | Material & Labour for temporary scaffolding provided around and below the overhead tank to facilitate surface cleaning, repair, priming, and painting activities. These scaffolding consists of steel pipes or bamboo for preparing and platforms erected from 19.5 to fullheight of the tank, including access to side walls, columns, and the bottom surface where required. Adequate working platforms, guardrails, toe boards, and safe access ladders are included. The scaffolding is properly braced and secured to ensure stability and safety throughout the painting operation and is dismantled after completion of the work complete all as specified and directed. Note:- Measurement shall be done in sqm i.e. circular/rectangular water tank soffit area plus one meter offset in perimeter. |
| 28 | Material & Labour forPreparing old painted steel surfaces of any description not otherwise described over 10 cm width orgirthand applying one coat of synthetic enamel paint complete all as speciied and directed. Make :- Nerolac - Synthetic enamel high gloss/ Asian-Apcolite premium/ Berger - luxol high Gloss. |
| 29 | Providing and applying plaster of paris putty as required thickness over plastered or unplasteredsurface to prepare the surface evan and smooth complete all as specified and directed. |
| 30 | Material and labour for cutting and uprooting of small tree roots and unwanted vegetation on roof and wall surfaces by digging safely on concrete roof or brick wall and pouring acid or approved chemical to aviod further growth of roots and making good the surfaces by filling cracks and distured protion by cement mortar (1:3) complete all as specified and directed. |
| 31 | Material & Labour for applying Sika® Rustoff-100 Rust remover cum passivator Sika® Rustoff-100 is a single component liquid that removes rust and temporarily prevents further rusting of steel structures by providing a passivating coatcomplete all as specified and directed.Note:- (i) Work executed on over head water tank.(ii) Measurement should be done in sqm i.e. area of application measured. |
| 32 | Note:-Amount of credit ofRs. 6000.00 for retrieved materials mentioned in Schedule of Credit of tender documents in PDF form which will be deducted offline while acceptance of tender. |