| 1 | Supply of following Decentralized materials Provide by Contractor at the works site as per RESSPO norms. |
| 2 | ST Poles,11 meter long |
| 3 | ST Poles,13 meter long |
| 4 | Stone Pad |
| 5 | Dead end clamp for pole/bracket with nuts & bolts |
| 6 | I Hook |
| 7 | Suspension clam with nuts & bolts |
| 8 | M.S clamp with nuts bolts painted with redoxide |
| 9 | L.T connector A type |
| 10 | L.T connector B type |
| 11 | L.T bare nuetral connector |
| 12 | Distribution boxes/Kiosk for LT pole/bracket with clamp & nut bolt |
| 13 | X-arms holding clamps with bolts & nuts. |
| 14 | M.S clamp for T-off channel with bolts & nuts |
| 15 | F-bracket with bolts & nuts |
| 16 | Extra for gaurding at road/line crossing |
| 17 | Danger Board with clamps & bolts |
| 18 | P.G clamps for Dog conductor |
| 19 | Garding Angle |
| 20 | Garding Angle Clamp |
| 21 | All Lugs |
| 22 | Z-clamp |
| 23 | 33 KV E-bracket |
| 24 | M.S. Angle Iron 65x65x6, 4300 mm long bracing with clamp |
| 25 | Top Channel 125x65mm, 3200 mm with clamp |
| 26 | Earth wire clamp with bolts & nuts |
| 27 | Number Plate |
| 28 | Barbed wire GI |
| 29 | All. Binding wire |
| 30 | All. Paint |
| 31 | Bolts Nuts & washier |
| 32 | Red Oxide Paint |
| 33 | Clamps with nuts & bolts for Top /Dropper Channel |
| 34 | 11 KV cable jointing kit O/D 3X120mm2 |
| 35 | G.I pipe of 6\" dia |
| 36 | Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge. |
| 37 | ST Poles 11 mtr long (Dump Site to Pit Site) |
| 38 | ST Poles 13 mtr long (Dump Site to Pit Site) |
| 39 | PCC Pole 8.5 Mtr long |
| 40 | Arial Bunch Cable 3X120+95+16 mm2 |
| 41 | 11 KV XLPE Cable 3X120 mm2 |
| 42 | LT PVC Cable 1X400 mm2 |
| 43 | LT Cable (Service Cable) |
| 44 | 100 KVA T/F 11/0.440 |
| 45 | 250 KVA T/F 11/0.440 |
| 46 | ACSR Dog Conductor |
| 47 | All Line Material for 11 KV / LT Line |
| 48 | All Line Material for 33 KV |
| 49 | Erection |
| 50 | Erection of single support ST Pole 11 Mtr long for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms. |
| 51 | Erection of single support ST Pole 13 Mtr long for construction of 33 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms. |
| 52 | Erection of single support PCC Pole 8.5 Mtr long for construction of LT line including digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms. |
| 53 | Erection of Sectional Four Pole Structure of ST Pole 13 Mtr long for 33 KV Line, including digging of pit, fitting of all accessories, earthing of Pole, back filling of earth, grouting of each pole & stay sets & other required works as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 54 | Erection of Sectional Doble Pole Structure of ST Pole 13 Mtr long for 33 KV Line, including digging of pit, fitting of all accessories, earthing of Pole, back filling of earth, grouting of each pole & stay sets & other required works as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 55 | Erection of Sectional Double Pole Structure of ST Pole 11 Mtr long for 11 KV Line, including digging of pit, fitting of all accessories, earthing of Pole, back filling of earth, grouting of each pole & stay sets & other required works as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 56 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 57 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 58 | Earthing of Poles as per RESSPO norms |
| 59 | Stringing & sagging of 3 phase 33 KV line upto proper sag including laying of ACSR Dog Conductor, binding with insulators & jumpering as per RESSPO norms |
| 60 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Dog Conductor, binding with insulators & jumpering as per RESSPO norms |
| 61 | Laying, Streaching of Arial Bunch Cable size 3x120+1x95+1x16 mm2 With All fitting of all accessories as per RESSPO norms |
| 62 | Erection of Sectional Double Pole Structure of ST Pole for distribution T/F, including digging of pit, fitting of all accessories, earthing of Pole, back filling of earth, grouting of each pole & stay sets & other required works as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 63 | Construction of Transformer plinth for 400/250/100 KVA Transformer of 2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials. |
| 64 | Well type earthing of 400/250/100 KVA Transformer by using B class G.I. pipe of 1.5 \" dia and making hand pipe type earth boring IInd strata of water or 60 ft. whichever is deeper about 6\" of G.I. pipe shall remain above ground level 2 No. G.I. earth clamp shall also be welded to the portion of pipe which is above the ground level. Through this G.I. Clamp and G.I. Strip 30x5mm duly galvanized shall be connected with nut & bolts. Every DT shall have 2 such earthing, One earthing for T/F neutral and second earthing for T/F body. All requred materials shall by provided by the contractor. |
| 65 | Fencing of T/F 400/250/100 KVA with M.S. Square mesh welded/fixed on M.S. Angle of size 65x65x6 mm with gate hinges & shutter assembly, of over all size 3x3x2.5 mtr as per drawing including cost of all materials. |
| 66 | Shifting of 400 KVA Transformer as per RESSPO norms |
| 67 | Shifting of 250 KVA Transformer as per RESSPO norms |
| 68 | Shifting of 100 KVA Transformer as per RESSPO norms |
| 69 | Shifting of 25 KVA Transformer as per RESSPO norms |
| 70 | Installation of 400 KVA Transformer as per RESSPO norms |
| 71 | Installation of 250 KVA Transformer as per RESSPO norms |
| 72 | Installation of 100 KVA Transformer as per RESSPO norms |
| 73 | Mounting of 25 KVA Transformer as per RESSPO norms |
| 74 | Laying of 11 KV XLPE Cable 3X120 sqmm Double Circuit along with cost of bricks & sand |
| 75 | Fixing of Cable jointing kit |
| 76 | Dismentaling of 33 KV Line |
| 77 | Dismentaling of 11 KV Line |
| 78 | Dismentaling of LT Line |
| 79 | Cartage of received back 33 KV Line Material from work site to ESC, Mirzapur including loading & unloading charge |
| 80 | Cartage of received back 11 KV Line Material from work site to ESC, Mirzapur including loading & unloading charge |
| 81 | Cartage of received back LT Line Material from work site to ESC, Mirzapur including loading & unloading charge |
| 82 | Tree Cutting Branch Please Enable Macros to View BoQ information |