| 1 | DemolishingC. C baseby manually/mechanical means including stacking of serviceable material and disposal of unserviceable material within in a lead of 50 metres including cutting reinforcement as per direction of Engineer-in-charge, including cost of supply of all labours, tools & plants, transportation and all other charges etc. complete |
| 2 | Removing the existingwalland floor tiles from toilet by manually including stacking of serviceable materials and disposal of unserviceable materials within a lead of50 metres as per direction of engineer incharge,including the all cost of all labours, tools & plants, transportationand all other chargesetc, complete. |
| 3 | Providing and laying anti skid tiles in floor (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only . Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily.including cost of supply of all labours, tools & plants, cleaning materialsand all other charges etc complete.(600mm*1200M) |
| 4 | Providing and laying in position Cement Concrete 1:2:4 infoundation, base, including mixing, laying, compacting with flat/needle vibrator, curing as directed by the engineer in charge including cost of all materials,labours, tools & plants,curing,safety measures and all other charges etc., complete. |
| 5 | 15 mm thick cement plaster with CM 1:3 of brick masonry surfaces and Concrete surfaces for plastering with float caot of neat cement for walls as per standard specification and as directed at site including supply of allmaterial,labours,scaffolding,curing, tools & plants,safety measures and all other charges etc., complete. |
| 6 | Supplying and fixing following size modules GI box/ PVC surface box alongwith modular base & cover plate for modular switches in recess/surface etc. as required. |
| 7 | 12Module (250mm * 150mm) |
| 8 | 8Module (200mm * 75mm) |
| 9 | 6Module (150mm * 75mm) |
| 10 | 4 Module (125mm * 75mm) |
| 11 | Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. |
| 12 | 10 Amp switch |
| 13 | 16/20 Amp switch |
| 14 | 3 pin 10 Amp socket outlet |
| 15 | 6 pin 16/20 Amp socket outlet |
| 16 | Supplying and drawing following sizes of FRLS PVC insulated copper conductor, single core cable in the existing surface/ recessed steel/ PVC conduit as required. |
| 17 | 2 x 1.5 sq. mm (06 coil of 100 mtrs) |
| 18 | 3 x 2.5 sq. mm (03 coil of 100 mtrs) |
| 19 | Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted\ including earthing etc. as required. (But without MCB/RCCB/Isolator) |
| 20 | 6- way, Double door |
| 21 | 8- way, Double door |
| 22 | Earthing with copper earth plate 600mm X 600mm X 3mm thick including acessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 meter long (GI of Dia 2-Inch) etc. with charcoal/ coke and salt as required. |
| 23 | Providingand laying 25mm X 3mm copper strip at 0.50 metre below ground level for conductor earth electrode, including connection/ termination with with nut, bolt, spring washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of brass nut bolt & spring washer spaced at 50mm) |
| 24 | Supplying and fixing of 25mm sizes of medium class PVC conduit /Cassing capping along with accessories in surface/recess including cutting the wall and making good the same in case of recessed conduit as required (25 mm PVC conduit/casing capping). (30 nos pipe of 3-mtrs + 20 nos casing caping X 2 mtr)) |
| 25 | Installation of exhaust fan in the existing opening, including making good the damage, connection, testing, commissioning etc. as required. (Upto 450 mm Sweep)(For item no- 33) |
| 26 | Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, “C” curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. |
| 27 | Single pole 16A/20A |
| 28 | Double pole 32A/40A |
| 29 | Supplying and fixing 3 pin, 5 A ceiling rose on the existing junction box/ PVC box including connections etc. as required. |
| 30 | Supplying & fixing pvc batten/ angle holder including connection etc as required. |
| 31 | Installation , testing, commissioning of wall bracket/ celling fittings of all sizes and shapes containing upto two GLS/CFL/LED surfacelamps per fitting, complete with all acessories including connection etc as required. |
| 32 | Supplying and fixing modular blanking plate on the existing modular plate & switch box excluding modular plate as required. |
| 33 | Supplying and fixing two module stepped type electronic fan regulator on the existing modular plate switch box including connections but excluding modular plate etc. as required. |
| 34 | Installation, testing and commissioning of pre-wired, fluorescent fitting / LED/compact fluorescent fitting of all types, complete with all accessories and tube/lamp etc. directly on ceiling/ wall, including connections with 1.5 sq. mm FRLS PVC insulated, copper conductor, single core cable and earthing etc. as required. |
| 35 | Installation, testing and commissioning of ceiling fan, including wiring the down rods of standard length (upto 30 cm) with 1.5 sq. mm FRLS PVC insulated, copper conductor, single core cable etc with fixing of fan hook at ceiling if required. |
| 36 | Laying and fixing of one number PVC insulated and PVC sheated/XLPE power cable of 1.1 KV grade of following size on wall surface as required. Up to 35 sq mm clamping with 1mm thick saddle. (For item no- 25 ) |
| 37 | Labour charges for excavation of trench (Width-30 cm XBredth- 45 cm) laying of UG Cable by looping fron one pole to another with inter connection complete and filling the said trench with excavated loose soil , etc including cutting of concreat pathway as required complete with end to end connection.(For item no- 26) |
| 38 | Supplyof 35 sq mm, 4-core, aluminum, multi strand, pvc sheathed, armoured, XLPE , 1100 volt grade U.G cable. ( From electricity pole to main fuse unit at power house) |
| 39 | Supply and fixing of 10 sq mm, 3-core, copper, multistrand, pvc sheathed, un-armoured cable. |
| 40 | Supply and fixing of PVC Syntex Junction Box as required. |
| 41 | Insulation tape 5 mtr roll |
| 42 | Wall revolving fan, 400mm, 230 v AC, 50Hz with plastic blade with speed and rotation by pull chord adustment. |
| 43 | 20watt, 4-feet LED tube light battan. |
| 44 | Supply of Ceiling fan, 1200mm sweep with 2-feet down rod. |
| 45 | Supply and fixing of 100Amp, 415V, 4-pole,copper busbar chamber. |
| 46 | Supply and fixing of 100Amp, 3-phase, 440V AC, 4-pole main switch fuse unit. |
| 47 | Heavy duty exhaust fan, 230V AC ,450mm, metal body, industrial type. |
| 48 | Supply and fixing of 100Amp, 415V AC, Ceramic kitkat fuse unit, Handle type fixing on wooden board. |
| 49 | 1-M Indicator |
| 50 | 12 watt LED lamp with B-22 cap |
| 51 | Rubber mat of size 8-feet X 4-feet, thickness-1 inch. |
| 52 | 12 watt LED bulkhed fitting. |
| 53 | 15 watt LED surface light, round. input voltage: 230 V,Frequency: 50 Hz, Cool Day Light, Drive: Built - In, Polycarbonate material with IP20 protection. |
| 54 | Supply and fixing of PVC industrial channel. Size- 60mm X 60mm (1-mtr length) |
| 55 | Supply and fixing aluminium chequered tiles for trench of 5mm thickness including cost of all materials,labours, tools & plants, cutting at site requirment with lifting arrangement, finishing and all other charges etc. complete. (8feet X 4 feet) |
| 56 | Supply and fixing of front cover with 12mm plywood of size-3feet X 2feet X 1.5-feet (for AMF panel & DB) including material and painting with gray enamel.. |
| 57 | 25 mm, PVC Hose pipe, heavy duty. |
| 58 | Copper lugs of assorted sizes as per requirment at site. |
| 59 | Labour charges for uninstallation of 15 KVA DG set from existing foundation base and Re-installation withTestingand Commissioning. |
| 60 | Labour charges for Shiftingof 15 KVA silent Genset on the new foundation base from exixting base within Power House room . |
| 61 | Labour chargesforfixing of silencer pipe by making hole on the wall with GI pipe of 2-inch dia with bend provision as per site including painting. |
| 62 | Labour charges for Shiftingof03 nos 5-KVA voltage stabilizer inPower House with input output connection along with other electrical items as required at site.. |
| 63 | Labour charges for shifting of AMF panel with all input and output load connection (including removing of existing). |
| 64 | Labour charges for removing of existing old switch boards, Fuse units etc. |