| 1 | Supplying, fabricating and placing in position of steel reinforcement for RCC works as directed by the Engineer at site including cost of steel, binding wire, labour charges for cutting, bending, binding, leads and lifts etc., complete. |
| 2 | Providing and placing of RCC 1:1½:3 using 20 mm HBG metal as directed by the Engineer at site including cost of all materials, labour charges, centring, shuttering, curing, leads and lifts, etc. complete but excluding cost of reinforcement. (A) Plinth Beam & Lintel |
| 3 | Providing and placing of RCC 1:1½:3 using 20 mm HBG metal as directed by the Engineer at site including cost of all materials, labour charges, centring, shuttering, curing, leads and lifts, etc. complete but excluding cost of reinforcement. B) Rack slab |
| 4 | Brick work in CM 1:4 using Fly ash Bricks for super structure as directed by the Engineer at site including cost of all materials, labour charges, T&P, curing, leads & lifts, etc., complete. |
| 5 | Providing PCC 1:4:8 using 40 mm HBG metal as directed by the Engineer at site including cost of all materials, labour charges, curing, leads & lifts, etc. complete. |
| 6 | Plastering in CM 1:5, 12mm thick for wall surfaces including cost of all materials, Labour charges, curing, T&P, Leads and Lifts, etc. complete. |
| 7 | Plastering in C.M 1:3, 10 mm thick including cost of all materials, scaffolding charges, Labour charges, curing, T&P, Leads & Lifts, etc., complete. |
| 8 | Floor finishing with CM 1:3, 20mm thick including cost of all materials, labour charges, curing, leads & lifts etc., complete. |
| 9 | Supplying, Fabricating and Fixing in Position of MS fully paneled steel Door double leaf of required size using 40x40x6m MS angle for door frame,30x30x6mm MS Angles for shutter frame by adopting 5 Nos. horizontally, 2 nos. vertically, 4nos. stiffener on diagonally, shutter covered with 18 Gauge MS sheet, finished neatly as directed by the Engineer at site including cost of all materials, providing locking arrangements, holdfast/hinges, handles, labour, leads and lifts, etc complete. |
| 10 | Supplying and fixing in position of partly glazed mild steel windows of required size using 23x18x18x3mm\"Z\" section for window main frame, 46x23x20x3mm \"J\" section for intermediate frame, 23x18x18x3mm\"Z\" section for shutter frame with 4 leaves top leaves glazed with 4mm thick plain glass, bottom leaves paneled with M.S sheet of 18gauge with 10mm square bar grill at 100mm c/c, 4 nos. of hold fasts, handle pulleys, latches with locking arrangements, including cost of fabrication, transporting, lifting and fixing, embedding the hold fasts in walls rigidly with concrete PCC 1:1.5:3, cost of all material, labour charges, leads & lifts, T&P, etc. complete. |
| 11 | Supplying, Fabricating and fixing of structural steel work using M.S Channels/ Angles of various sizes as directed by the Engineer including cost of materials, labour charges, scaffolding, welding, bolts and nuts, leads & lifts etc., complete. |
| 12 | Supplying and fixing of colour coated galvalume sheet of 0.47mm thick of approved quality with necessary screws including cost of all materials, Scaffolding, lead, lift, labour charges, etc., complete. |
| 13 | Providing Cup-board Shutter using termite/waterproof plywood of 19mm thick over which laminated sheet of 0.80mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings such as hydraulic hinges, tower bolt, handles, multipurpose locks etc. as directed by the Engineer in charge at site including cost of all materials, labour Charges, T&Ps, leads and lifts etc. complete. |
| 14 | Painting the steel work with two coats of enamel paint of approved quality and colour over a coat of primer including cost of all materials, labour charges, brush, leads & lifts etc., complete. |
| 15 | Colour washing with two coats of cement paint over a coat of white cement for the exterior wall surfaces including cost of all materials, labour, curing, leads & lifts etc., complete. |
| 16 | Providing two coats of Oil bound distemper of approved quality and colour over a coat of ready mixed primer to the interior wall surfaces as directed by the Engineer at site, including cost of all materials, labour charges, scaffolding charges, leads & lifts etc., complete. specials, clamps and screws, labour, leads & lifts etc., complete. Please Enable Macros to View BoQ information |